One-step-installation of offshore wind turbine on large-scale bucket-top-bearing bucket foundation

Hongyan Ding , Jijian Lian , Aidong Li , Puyang Zhang

Transactions of Tianjin University ›› 2013, Vol. 19 ›› Issue (3) : 188 -194.

PDF
Transactions of Tianjin University ›› 2013, Vol. 19 ›› Issue (3) : 188 -194. DOI: 10.1007/s12209-013-2099-0
Article

One-step-installation of offshore wind turbine on large-scale bucket-top-bearing bucket foundation

Author information +
History +
PDF

Abstract

In 2010, the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province, China, which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation. The critical technique of LSBTB bucket foundation included self-floating towing, penetration with adjustment of horizontal levelness, removability and one-step-installation. The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base, installation and debugging of wind power, overall water transportation of foundation and wind power system, and installation of foundation and offshore wind turbine on the appointed sea area. The cost of one-step-installation technique was about 5 000 Yuan/kW, which was 30%-50% lower than that of the existing technique. The prefabrication of LSBTB bucket foundation took about two months. During the one-step-installation process, the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth. After the proposed technique is industrialized, the cost will be further reduced, and the installation capacity is expected to be up to 500 wind turbines per year.

Keywords

one-step-installation technique / large-scale bucket-top-bearing bucket foundation / self-floating towing / penetration technique with adjustment of horizontal levelness / removability technique / construction and installation cost

Cite this article

Download citation ▾
Hongyan Ding, Jijian Lian, Aidong Li, Puyang Zhang. One-step-installation of offshore wind turbine on large-scale bucket-top-bearing bucket foundation. Transactions of Tianjin University, 2013, 19(3): 188-194 DOI:10.1007/s12209-013-2099-0

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Lian J, Ding H, Liu R, et al. Research Report on Key Technology of the CBF-3-150 Composite Bucket Foundation for Offshore Wind Turbines[R]. Tianjin University, Tianjin, China, 2010

[2]

Lian J, Sun L, Zhang J, et al. Bearing capacity and technical advantages of composite bucket foundation of offshore wind turbines [J]. Transactions of Tian jin University, 2011, 17(2): 132 137

[3]

Christian LeBlanc Bakmar. The Monopod Bucket Foundation-Recent Experience and Challenges Ahead[EB/OL]. 2009

[4]

Ding H, Li Z, Lian J, et al. Soil reinforcement experiment inside large-scale bucket foundation in muddy soil [J]. Transactions of Tianjin University, 2012, 18(3): 168-172.

[5]

Zhang P, Ding H, Le Conghuan. Test on the dynamic response of the offshore wind turbine structure with the large-scale bucket foundation [J]. Procedia Environmental Sciences, 2012, 12(PartB): 856-863.

[6]

Lian J, Ding H, Zhang P, et al. Design of large-scale prestressing bucket foundation for offshore wind turbines [J]. Transactions of Tianjin University, 2012, 18(2): 79-84.

[7]

Ding H, Zhang P, Le C, et al. Construction and installation technique of large-scale topbearing bucket foundation for offshore wind turbine[C]. MACE Proceedings, 2011

[8]

Ultramarine Inc. Reference Manual for Moses [M]. 2009

[9]

Guidelines for Towage at Sea[S]. China Classification Society, 2011.