Fuzzy earthwork dynamic allocation and optimization for construction of high concrete face Rockfill dam

Ning Liu , Bo Cui , Denghua Zhong

Transactions of Tianjin University ›› 2012, Vol. 18 ›› Issue (6) : 426 -431.

PDF
Transactions of Tianjin University ›› 2012, Vol. 18 ›› Issue (6) : 426 -431. DOI: 10.1007/s12209-012-1958-4
Article

Fuzzy earthwork dynamic allocation and optimization for construction of high concrete face Rockfill dam

Author information +
History +
PDF

Abstract

Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam, traditional allocation and planning are not able to function properly in the construction process with strong randomness. In this paper, the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project. Under the premise of actual situation and the experience of the construction site, an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria. In this way, the deficiency of certain allocation model can be overcome. The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.

Keywords

high concrete face rockfill dam / fuzzy number / earthwork dynamic allocation / structure unit weighted ranking

Cite this article

Download citation ▾
Ning Liu, Bo Cui, Denghua Zhong. Fuzzy earthwork dynamic allocation and optimization for construction of high concrete face Rockfill dam. Transactions of Tianjin University, 2012, 18(6): 426-431 DOI:10.1007/s12209-012-1958-4

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Kaliski J. A., Ye Y. A short-cut potential reduction algorithm for linear programming[J]. Management Science, 1993, 39(6): 757-776.

[2]

Aneja Y. P., Nair K. P. K. Bicriteria transportation problems[J]. Management Science, 1979, 25(1): 73 78

[3]

Lee S. M., Moore L. J. Optimizing transportation problems with multiple objectives[J]. AIEE Trans, 1973, 5(4): 333-338.

[4]

Shahram M. K., Seyed J. M., Ali K., et al. Fuzzy optimization model for earthwork allocations with imprecise parameters[J]. Journal of Construction Engineering and Management, 2007, 133(2): 181-190.

[5]

Jin L., Liang C., Xu Guangxiang. Application of a fuzzy-constraint model for optimal allocation of building materials in hydroelectric engineering constructions[J]. Journal of Harbin Engineering University, 2008, 29(10): 1036-1039.

[6]

Tanaka H., Ichihashi H., Asai K. A formulation of fuzzy linear programming based on comparison of fuzzy number[J]. Control and Cybernetics, 1984, 13(3): 185-194.

[7]

Zeng Qingning. All-coefficient-fuzzy linear programming with equality constraints[J]. Systems Engineering — Theory and Practice, 2000, 9, 105-109.

[8]

Guo Sizong. Principle of Fuzzy Mathematical Analysis Based on Structured Element[M]. 2004, Shenyang, China: Northeastern University Press.

[9]

Zhong D., Hu Chengshun. Theory and application for visual simulation modeling of complex engineering system[J]. Journal of System Simulation, 2002, 14(7): 839-843.

[10]

Hu C., Zhong D., Zhang J., et al. Study on earthwork dynamic allocation model and visualization[J]. Engineering Sciences, 2003, 5(12): 73-78.

[11]

Zhao H., Guo Sizong. Solution to all-coefficient-fuzzy linear programming[J]. Fuzzy Systems and Mathematics, 2009, 23(3): 139-144.

AI Summary AI Mindmap
PDF

115

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/