Analytical modeling for corrosion-induced cover cracking of corrosive reinforced concrete structures

Xiaogang Zhang , Jiao Wang , Yingwu Zhou

Transactions of Tianjin University ›› 2012, Vol. 18 ›› Issue (4) : 285 -290.

PDF
Transactions of Tianjin University ›› 2012, Vol. 18 ›› Issue (4) : 285 -290. DOI: 10.1007/s12209-012-1905-4
Article

Analytical modeling for corrosion-induced cover cracking of corrosive reinforced concrete structures

Author information +
History +
PDF

Abstract

An analytical model for predicting the corrosion-induced cracking of concrete cover of reinforced concrete (RC) structures was developed. The effects of influence factors such as practical initial defects, corrosion rate, strength and elastic modulus of concrete on the corrosion-induced cracking of concrete cover were investigated. It was found that the size of practical initial defects was the most effective factor. Therefore, improving the compactness of concrete is an effective way to improve the durability of RC structures. It was also demonstrated that the accelerated corrosion tests may be unfavorable in the study of the relationship between cracking time and crack width.

Keywords

initial crack width / corrosion-induced cracking / RC structure / analytical model

Cite this article

Download citation ▾
Xiaogang Zhang, Jiao Wang, Yingwu Zhou. Analytical modeling for corrosion-induced cover cracking of corrosive reinforced concrete structures. Transactions of Tianjin University, 2012, 18(4): 285-290 DOI:10.1007/s12209-012-1905-4

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Lu C., Jin W., Liu Ronggui. Reinforcement corrosion-induced cover cracking and its time prediction for reinforced concrete structures [J]. Corrosion Science, 2011, 53(4): 1337-1347.

[2]

Leon C., Dimitri V. Val. Prediction of corrosion-induced cover cracking in reinforced concrete structures [J]. Construction and Building Materials, 2011, 25(4): 1854-1869.

[3]

Li C. Q., Yang S. T. Prediction of concrete crack width under combined reinforcement corrosion and applied load [J]. Journal of Engineering Mechanics, 2011, 137(11): 722-731.

[4]

Zhang X., Song Y., Wu Zhimin. Calculation model of equivalent strength for induced crack based on double-K fracture theory and its optimizing setting in RCC arch dam [J]. Transactions of Tianjin University, 2005, 11(1): 59-65.

[5]

Zhang X., Wang X., Lu Z., et al. Analytic model of non-uniform corrosion induced cracking of reinforced concrete structure [J]. Journal of Central South University of Technology, 2011, 18(3): 940-945.

[6]

Zhang X., Zhao Y., Xing F., et al. Coupling effects of influence factors on probability of corrosion initiation time of reinforced concrete [J]. Journal of Central South University of Technology, 2011, 18(1): 223-229.

[7]

Zhang X., Zhao Y., Lu Zhaohui. Dynamic corrosion-induced cracking process of RC considering effect of initial defects [J]. Journal of Asian Architecture and Building Engineering, 2010, 9(2): 439-446.

[8]

Liu Y. P., Weyers R. E. Modeling the time-to-corrosion cracking in chloride contaminated reinforced concrete structures [J]. ACI Materials Journal, 1998, 95(6): 675-680.

[9]

Xu S., Reinhardt H. W. Determination of double-K criterion for crack propagation in quasi-brittle fracture. Part III. Compact tension specimens and wedge splitting specimens [J]. International Journal of Fracture, 1999, 98(2): 179-193.

[10]

Xu S. L., Reinhardt H. W. Crack extension resistance and fracture properties of quasi-brittle softening materials like concrete based on the complete process of fracture [J]. International Journal of Fracture, 1998, 92(1): 71-99.

[11]

Reinhardt H. W., Xu S. L. Crack extension resistance based on the cohesive force in concrete [J]. Engineering Fracture Mechanics, 1999, 64(5): 563-587.

[12]

Bhargava K., Ghosh A. K., Mori Y., et al. Modeling of time to corrosion-induced cover cracking in reinforced concrete structures [J]. Cement and Concrete Research, 2005, 35(11): 2203-2218.

[13]

Liu Hongwen. Advanced Mechanics of Materials[M]. 1985, Beijing: Higher Education Press.

[14]

Torres-Acosta A. A., Sagüés A. A. Concrete cracking by localized steel corrosion-Geometric effects [J]. ACI Materials Journal, 2004, 101(6): 501-507.

[15]

Wu Z., Xu S., Ding Y., et al. The double-K fracture parameter of concrete for non-standard three point bending beam specimens [J]. China Engineering Science, 2001, 3(4): 76-81.

[16]

Andrade C., Alonso C., Molina F. J. Cover cracking as a function of bar corrosion. Part I. Experimental test [J]. Materials and Structures, 1993, 26(8): 453-464.