PDF
(268KB)
Abstract
China has developed more than 20 water pollution control plans for river basins (RBWPs) since 1996. However, the implementation has generally lagged. This paper proposes a three-step, post-evaluation methodology to analyze the implementation result of a RBWP and its influential factors. First, a multi-attribute evaluation method based on an index system is established to score the enforcement results of a RBWP. Indicators measure how well a RBWP has achieved its objectives, which include water quality compliance, pollution load control, project construction, financial inputs, and related management requirements. Second, an interpretive structural model is used to detect the significant factors that affect RBWP implementation. This model can effectively analyze the cause-effect chain and hierarchical relationship among variables. Five groups of factors were identified, namely, plan preparation, water resource endowment, policy, institution, and management. Both qualitative and quantitative methods are employed in the third step to evaluate the extent to which these factors have influenced the execution result of a RBWP, including pre-post contrast, scenario analysis, and correlation analysis. This research then post-evaluated the implementation of the Huai River Basin water pollution control plans (H-RBWPs) over a period of 10 years as a case study. Results showed that the implementation of the H-RBWPs was unsatisfactory during 2001–2005, although it improved during 2006–2010. The poor execution of these plans was partially caused by the underestimation of regional economic development in combination with ineffective industrial structure adjustment policies. Therefore, this case study demonstrates the feasibility and flexibility of the proposed post-evaluation methodology.
Graphical abstract
Keywords
river basin
/
water pollution control plan
/
post plan evaluation
/
multi-attribute comprehensive evaluation
/
interpretive structural model
/
combined qualitative/quantitative method
Cite this article
Download citation ▾
Lin ZENG, Xin DONG, Siyu ZENG, Tianzhu ZHANG, Jing LI, Jining CHEN.
Post-evaluation of a water pollution control plan: methodology and case study.
Front. Environ. Sci. Eng., 2015, 9(4): 712-724 DOI:10.1007/s11783-015-0773-2
| [1] |
Huai River Water Resource Committee. Huai River water resources bulletin 2000. Bengbu, 2001. (in Chinese)
|
| [2] |
Huai River Water Resource Committee. Huai River water resources bulletin 2010. Bengbu, 2011. Available online at accessed 2014-June-1) (in Chinese)
|
| [3] |
Smith C S, McDonald G T. Assessing the sustainability of agriculture at the planning stage. Journal of Environmental Management, 1998, 52(1): 15–37
|
| [4] |
Bellamy J A, Walker D H, McDonald G T, Syme G J. A systems approach to the evaluation of natural resource management initiatives. Journal of Environmental Management, 2001, 63(4): 407–423
|
| [5] |
Charnley S, Engelbert B. Evaluating public participation in environmental decision-making: EPA’s superfund community involvement program. Journal of Environmental Management, 2005, 77(3): 165–182
|
| [6] |
Carey P D, Short C, Morris C, Hunt J, Priscott A, Davis M, Finch C, Curry N, Little W, Winter M, Parkin A, Firbank L G. The multi-disciplinary evaluation of a national agri-environment scheme. Journal of Environmental Management, 2003, 69(1): 71–91
|
| [7] |
Ramos T B, Alves I, Subtil R, Joanaz de Melo J. Environmental performance policy indicators for the public sector: the case of the defence sector. Journal of Environmental Management, 2007, 82(4): 410–432
|
| [8] |
Nichols S J, Dyer F J. Contribution of national bioassessment approaches for assessing ecological water security: an AUSRIVAS case study. Frontiers of Environmental Science & Engineering, 2013, 7(5): 669–687
|
| [9] |
Couillard J, Garon S, Riznic J. The Logical Framework Approach-Millennium. Project Management Journal, 2009, 40(4): 31–44
|
| [10] |
Amiri M P. Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications, 2010, 37(9): 6218–6224
|
| [11] |
Tetteh I K, Awuah E, Frempong E. Post-project analysis: the use of a network diagram for environmental evaluation of the Barekese Dam, Kumasi, Ghana. Environmental Modeling and Assessment, 2006, 11(3): 235–242
|
| [12] |
EEA. Effectiveness of urban wastewater treatment policies in selected countries: an EEA pilot study. Luxembourg: Office for Official Publications of the European Communities, EEA, No.2, 2005
|
| [13] |
EEA. Effectiveness of packaging waste management systems in selected countries: an EEA pilot study. Luxembourg: Office for Official Publications of the European Communities, EEA, No.3, 2005
|
| [14] |
Poppitti J, Dietz T. Social impact evaluation of the US Resource Conservation and Recovery Act. Environmental Management, 1983, 7(6): 501–503
|
| [15] |
Sudol M F, Ambrose R F. The US Clean Water Act and habitat replacement: evaluation of mitigation sites in Orange County, California, USA. Environmental Management, 2002, 30(5): 727–734
|
| [16] |
Zeng S Y, Tian M, Li J, Chen J N. Post evaluation of water pollution control planning for Huai River Basin in China. In: Proceedings of the International Conference on Bioinformatics and Biomedical Engineering 2008, Shanghai. Piscataway: IEEE, 2008, 3421–3424
|
| [17] |
Lu Z Y, Tang D S, Zheng B, Zhu C G. Post-evaluation of the ecological impact of water diversion and recent management in the downstream Heihe River. Acta Scientiae Circumstantiae, 2011, 31(7): 1556–1561 (in Chinese)
|
| [18] |
Wang G Z, Tang D S. Post-evaluation of the ecological and environmental impact of water diversion project in the low reaches of Heihe River. Advanced Materials Research, 2012, 518–523: 1188–1191
|
| [19] |
Sage A P. Methodology for Large-Scale Systems. New York: McGraw-Hill, 1977
|
| [20] |
Ahn B S, Park K S. Comparing methods for multiattribute decision making with ordinal weights. Computers & Operations Research, 2008, 35(5): 1660–1670
|
| [21] |
Xu Y J, Da Q L. A method for multiple attribute decision making with incomplete weight information under uncertain linguistic environment. Knowledge-Based Systems, 2008, 21(8): 837–841
|
| [22] |
Saaty T L. Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process. Princeton: RWS Publications, 1994
|
| [23] |
Zeng S Y, Chen J N, Fu P. Strategic zoning for urban wastewater reuse in China. Water Resources Management, 2008, 22(9): 1297–1309
|
| [24] |
Shi W F, Zeng W H. Application of k-means clustering to environmental risk zoning of the chemical industrial area. Frontiers of Environmental Science & Engineering, 2014, 8(1): 117–127
|
| [25] |
Mandal A, Deshmukh S G. Vendor selection using interpretive structural modelling (ISM). International Journal of Operations & Production Management, 1994, 14(6): 52–59
|
| [26] |
Hsiao S W, Liu E. A structural component-based approach for designing product family. Computers in Industry, 2005, 56(1): 13–28
|
| [27] |
Liu S, Gao X, Zen Q, Zhou Y, Huang Y, Han W, Li L, Li J, Pu Y. Studies on interpretive structural model for forest ecosystem management decision-making. In: Zhou J, ed. Complex Sciences. Berlin: Springer-Verlag, 2009, 944–953
|
| [28] |
Kuo T C, Ma H Y, Huang S H, Hu A H, Huang C S. Barrier analysis for product service system using interpretive structural model. International Journal of Advanced Manufacturing Technology, 2010, 49(1–4): 407–417
|
| [29] |
Eswarlal V K, Dey P K, Budhwar P, Shankar R. Analysis of interactions among variables of renewable energy projects: a case study on renewable energy project in India. Journal of Scientific & Industrial Research, 2011, 70(8): 713–720
|
| [30] |
Gupta V, Acharya P, Patwardhan M. A strategic and operational approach to assess the lean performance in radial tyre manufacturing in India. International Journal of Productivity and Performance Management, 2013, 62(6): 634–651
|
| [31] |
Hsiao S W, Ko Y C, Lo C H, Chen S H. An ISM, DEI, and ANP based approach for product family development. Advanced Engineering Informatics, 2013, 27(1): 131–148
|
| [32] |
Wan J P, Jones J D. Managing IT service management implementation complexity: from the perspective of the Warfield version of systems science. Enterprise Information Systems, 2013, 7(4): 490–522
|
| [33] |
Warfield J N. Participative methodology for public system planning. Computers & Electrical Engineering, 1973, 1(2): 187–210
|
| [34] |
Malone D W. An introduction to the application of interpretive structural modeling. Proceedings of the IEEE, 1975, 63(3): 397– 404
|
| [35] |
Singh M D, Kant R. Knowledge management barriers: an interpretive structural modeling approach. International Journal of Management Science and Engineering Management, 2008, 3(2): 141–150
|
RIGHTS & PERMISSIONS
Higher Education Press and Springer-Verlag Berlin Heidelberg