Damage tolerance of fractured rails on continuous welded rail track for high-speed railways
Yuan Gao, Ping Wang, Kai Wang, Jingmang Xu, Zhiguo Dong
Railway Engineering Science ›› 2021, Vol. 29 ›› Issue (1) : 59-73.
Damage tolerance of fractured rails on continuous welded rail track for high-speed railways
Broken gap is an extremely dangerous state in the service of high-speed rails, and the violent wheel–rail impact forces will be intensified when a vehicle passes the gap at high speeds, which may cause a secondary fracture to rail and threaten the running safety of the vehicle. To recognize the damage tolerance of rail fracture length, the implicit–explicit sequential approach is adopted to simulate the wheel–rail high-frequency impact, which considers the factors such as the coupling effect between frictional contact and structural vibration, nonlinear material and real geometric profile. The results demonstrate that the plastic deformation and stress are distributed in crescent shape during the impact at the back rail end, increasing with the rail fracture length. The axle box acceleration in the frequency domain displays two characteristic modes with frequencies around 1,637 and 404 Hz. The limit of the rail fracture length is 60 mm for high-speed railway at a speed of 250 km/h.
Rail broken gap / Explicit FE method / Damage / High-frequency impact / Stress mechanism
[1.] |
|
[2.] |
|
[3.] |
|
[4.] |
Schafer DH, Barkan CPL (2008) A hybrid logistic regression/neural network model for the prediction of broken rails. In: Proceedings of the 8th world congress on railway research, Seoul
|
[5.] |
|
[6.] |
|
[7.] |
Cai X, Cai X, Zhu B (2014) Research on dynamic characteristics of high-speed vehicle-track under condition of broken rail gap. In: The 3rd international conference on railway engineering, Beijing
|
[8.] |
|
[9.] |
|
[10.] |
Tai B, He J, Liu X (2016) A preliminary methodology for broken rail caused freight train derailment risk analysis. In: 2016 Joint Rail Conference, Columbia
|
[11.] |
Sheperd D, Magel E, Harris B (2016) The impact of RCF and wear on service failures and broken rail derailments. In: AREMA Annual Conference, Warwickshire
|
[12.] |
An R, Sun Q, Bai W et al (2017) Grid-based analysis of causal factors of railway rail break risk. In: Transportation Research Board 96th annual meeting, Washington DC
|
[13.] |
Thurston DF (2014) Risk based broken rail detection on railways. In: 2014 Joint Rail Conference, Colorado Springs
|
[14.] |
Wei X, Yang Y, Yu N (2017) Research on broken rail real-time detection system for ultrasonic guided wave. In: 2017 International Conference on Electromagnetics in Advanced Applications (ICEAA), Verona
|
[15.] |
|
[16.] |
|
[17.] |
|
[18.] |
China Academy of Railway Sciences. Dynamic performance test report for non-ballast track structure and fastening system, 2007 Beijing China Academy of Railway Sciences
|
[19.] |
|
[20.] |
|
[21.] |
|
[22.] |
|
[23.] |
|
[24.] |
|
[25.] |
|
[26.] |
|
/
〈 |
|
〉 |