Contribution to the ageing control of onshore oil and gas fields

Belmazouzi Yacine , Djebabra Mébarek , Hadef Hefaidh

Petroleum ›› 2020, Vol. 6 ›› Issue (3) : 311 -317.

PDF
Petroleum ›› 2020, Vol. 6 ›› Issue (3) :311 -317. DOI: 10.1016/j.petlm.2019.11.006
research-article
Contribution to the ageing control of onshore oil and gas fields
Author information +
History +
PDF

Abstract

The ageing of the Algerian oil and gas (O&G) installations has led to many incidents. Such installations are over 30 years old (life cycle) and still in operation. To deal with this O&G crucial problem, the Algerian authorities have launched a rehabilitation and modernization schedule of these installations. Within the framework of this program, many audit operations are initiated to elaborate a general diagnosis of the works to be performed while optimizing production. In other words, industrial ageing risks shall be controlled.

In the process safety management (PSM) context, the aim of this paper is to study ageing problem of the Algerian industrial installations through proposed indicators. Their prioritization adjusted by (TOPSIS) Technique for Order-Preference by Similarity to Ideal Solution method which allows identification of ageing control solutions of Algerian onshore fields.

Keywords

Onshore / Oil and gas / Field / Ageing / Control / Indicators / Prioritization

Cite this article

Download citation ▾
Belmazouzi Yacine, Djebabra Mébarek, Hadef Hefaidh. Contribution to the ageing control of onshore oil and gas fields. Petroleum, 2020, 6(3): 311-317 DOI:10.1016/j.petlm.2019.11.006

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

I. Animah, M. Shafiee, N. Simms, J.A. Erkoyuncu, J. Maiti, Selection of the most suitable life extension strategy for ageing offshore assets using a life-cycle costbenefit analysis approach, J. Qual. Maint. Eng. 24 (2018) 311-330, https://doi.org/10.1108/JQME-09-2016-0041.

[2]

I.M. Herremans, R.G. Isaac, Management planning and control: supporting knowledge-intensive organizations, Learn. Organ. 12 (2005) 313-329, https://doi.org/10.1108/09696470510599109.

[3]

M.W. Lewis, L. Steinberg, Maintenance of mobile mine equipment in the information age, J. Qual. Maint. Eng. 7 (2001) 264-274, https://doi.org/10.1108/13552510110407050.

[4]

Health and Safety Executive (HSE),Chemical Industries Association (CIA), Developing Process Safety Indicators; A Step-by-step Guide for the Chemical and Major Hazards Industries, first ed., The Office of Public Sector Information, Surrey, 2006.

[5]

X. Shi, G. Hansen, M. Mills, S. Jungwirth, Y. Zhang, Preserving the value of highway maintenance equipment against roadway deicers: a case study and preliminary cost benefit analysis, Anti-Corros. Method. M. 63 (2016) 1-8, https://doi.org/10.1108/ACMM-07-2014-1410.

[6]

O.O. Omogoroye, S.A. Oke, A safety control model for an offshore oil platform, Disaster Prev. Manag. 16 (2007) 588-610, https://doi.org/10.1108/09653560710817066.

[7]

D.J. Edwards, G.D. Holt, Construction plant and equipment management research: thematic review, J. Eng. Des. Technol. 7 (2009) 186-206, https://doi.org/10.1108/17260530910974989.

[8]

K. Kang, V. Subramaniam, Integrated control policy of production and preventive maintenance for a deteriorating manufacturing system, Comput. Ind. Eng. 118 (2018) 266-277, https://doi.org/10.1016/j.cie.2018.02.026.

[9]

R.M. Chandima Ratnayake, Mechanization of static mechanical systems inspection planning process: the state of the art, J. Qual. Maint. Eng. 21 (2015) 227-248, https://doi.org/10.1108/JQME-09-2012-0033.

[10]

S. Chettouh, R. Hamzi, M. Chebila, Contribution of the lessons learned from oil refining accidents to the industrial risks assessment, Manag. Environ. Qual. Int. J. 29 (2018) 643-665, https://doi.org/10.1108/MEQ-07-2017-0067.

[11]

P. Bragatto, M.F. Milazzo, Risk due to the ageing of equipment: assessment and management, Chem. Eng. Trans. 53 (2016) 253-258, https://doi.org/10.3303/CET1653043.

[12]

A. Vazdirvanidis, G. Pantazopoulos, A. Rikos, Corrosion investigation of stainless steel water pump components, Eng. Fail. Anal. 82 (2017) 466-473, https://doi.org/10.1016/j.engfailanal.2016.09.009.

[13]

S. Chettouh, R. Hamzi, K. Benaroua, Examination of fire and related accidents in Skikda oil refinery for the period 2002-2013, J. Loss Prevent. Proc. 41 (2016) 186-193, https://doi.org/10.1016/j.jlp.2016.03.014.

[14]

T. Reiman, E. Pietikainen, Leading indicators of system safety-Monitoring and driving the organizational safety potential, Saf. Sci. 50 (2012) 1993-2000, https://doi.org/10.1016/j.ssci.2011.07.015.

[15]

The Report of the BP U.S. Refineries Independent Safety Review Panel, BP U.S. Refineries Independent Safety Review Panel, (2007) http://sunnyday.mit.edu/Baker-panel-report.pdf, Accessed date: 20 March 2017.

[16]

Electric Power Research Institute (EPRI),Final Report on Leading Indicators of Human Performance, (2001) http://esh-docdb.fnal.gov/cgi-bin/RetrieveFile? docid=1603, Accessed date:15 June 2017.

[17]

J.E. Vinnem, Risk indicators for major hazards on offshore installations, Saf. Sci. 48 (2010) 770-787, https://doi.org/10.1016/j.ssci.2010.02.015.

[18]

K. Øien, I.B. Utne, I.A. Herrera, Building safety indicators: Part 1-Theoretical foundation, Saf. Sci. 49 (2011) 148-161, https://doi.org/10.1016/j.ssci.2010.05.012.

[19]

K. Øien, Development of early warning indicators based on accident investigation, Paper Presented at International Probabilistic Safety Assessment and Management Conference, in Hong Kong, May 2008.

[20]

D.K.H. Tang, F. Leiliabadi, E.U. Olugu, S.Z.M. Dawal, Factors affecting safety of processes in the Malaysian oil and gas industry, Saf. Sci. 92 (2017) 44-52, https://doi.org/10.1016/j.ssci.2016.09.017.

[21]

F. Candreva, M. Houari, Plant screening for ageing impact in the process industry, Chem. Eng. Trans. 31 (2013) 253-258, https://doi.org/10.3303/CET1331043.

[22]

American Petroleum Institute (API), Risk-Based Inspection-RP, 580, second ed., (2009) Washington.

[23]

The International Organization for Standardization (ISO),ISO 31000-Risk Management-Principles and Guidelines, first ed., (2009) Geneva.

[24]

M. Gul, A review of occupational health and safety risk assessment approaches based on multi-criteria decision-making methods and their fuzzy versions, Hum. Ecol. Risk Assess. 24 (2018) 1-38, https://doi.org/10.1080/10807039.2018.1424531.

[25]

L.A. Cox Jr., What's wrong with risk matrices? Risk Anal. (2008) 497-512, https://doi.org/10.1111/j.1539-6924.2008.01030.x https://onlinelibrary.wiley.com/toc/15396924/2008/28/2.28.

[26]

H. Hadef, M. Djebabra, Proposal method for the classification of industrial accident scenarios based on the improved principal components analysis (improved PCA), Prod. Eng. Res. Dev. 13 (2019) 53-60, https://doi.org/10.1007/s11740-018-0859-3.

[27]

H. Hadef, M. Djebabra, PCA-I and AHP Methods: unavoidable arguments in accident scenario classification, J. Fail. Anal. Prev. 19 (2019) 496-503, https://doi.org/10.1007/s11668-019-00625-x.

[28]

R. Dandage, S.S. Mantha, S.B. Rane, Ranking the risk categories in international projects using the TOPSIS method, Int. J. Manag. Proj. Bus. 11 (2018) 317-331, https://doi.org/10.1108/IJMPB-06-2017-0070.

[29]

J.R. Thomson, Managing the safety of aging I&C equipment, in: B. V. Elsevier (Ed. ), High Integrity Systems and Safety Management in Hazardous Industries, Totem Publisher Inc., Amsterdam, 2015, pp. 85-95.

[30]

T. Laloix, A. Voisin, S. Deeb, E. Romagne, B. Lung, F. Lorange, Industrial system functioning/dysfunctioning-based approach for indicator identification to support proactive maintenance, IFAC 50 (2017) 13704-13709, https://doi.org/10.1016/j.ifacol.2017.08.2544.

[31]

Y. Liu, D.M. Frangopol, M. Cheng, Risk-informed structural repair decision making for service life extension of aging naval ships, Mar. Struct. 64 (2019) 305-321, https://doi.org/10.1016/j.marstruc.2018.10.008.

[32]

ChL. Hwang, K. Yoon, Multiple Attribute Decision Making: Methods and Applications a State-Of-The-Art Survey, first ed., Springer-Verlag, Germany, 1981.

[33]

R. Mishra, A.K. Pundir, L. Ganapathy, Evaluation and prioritization of manufacturing flexibility alternatives using integrated AHP and TOPSIS method: evidence from a fashion apparel firm, Benchmarking Int. J. 24 (2017) 1437-1465, https://doi.org/10.1108/BIJ-07-2015-0077.

[34]

M. Yazdi, Risk assessment based on novel intuitionistic fuzzy-hybrid-modified TOPSIS approach, Saf. Sci. 110 (2018) 438-448, https://doi.org/10.1016/j.ssci.2018.03.005.

[35]

M.J. Ostad-Ahmed-Ghorabi, M. Attari, Advancing environmental evaluation in cement industry in Iran, J. Clean. Prod. 41 (2013) 23-30, https://doi.org/10.1016/j.jclepro.2012.10.002.

[36]

S. Graham, R. McAdam, The effects of pollution prevention on performance, Int. J. Oper. Prod. Manag. 36 (2016) 1333-1358, https://doi.org/10.1108/IJOPM-05-2015-0289.

PDF

0

Accesses

0

Citation

Detail

Sections
Recommended

/