Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge

Front. Struct. Civ. Eng. ›› 2009, Vol. 3 ›› Issue (3) : 339 -343.

PDF (86KB)
Front. Struct. Civ. Eng. ›› 2009, Vol. 3 ›› Issue (3) : 339 -343. DOI: 10.1007/s11709-009-0047-9
Research articles
Research articles

Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge

Author information +
History +
PDF (86KB)

Abstract

Based on pile foundation construction of No. 6 main pier, deep mudstone geological foundation and deep-water construction in Nanjing-Dashengguan Yangtze Bridge, the method of super-large-diameter bored pile in deep water is studied. The spread drill, application of PHP mud, and choice of machine are solved by adopting two machines of KTY4000 and KPG300A. Besides, the airlift reversing circulation is selected in slag discharge. The results show that this method can ensure successfully the construction of pier foundation to satisfy the demands of codes.

Keywords

PHP slurry / KTY4000 drilling machine / KPG3000A drilling machine / spread drill

Cite this article

Download citation ▾
null. Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge. Front. Struct. Civ. Eng., 2009, 3(3): 339-343 DOI:10.1007/s11709-009-0047-9

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF (86KB)

1555

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/