22000-ton gantry crane

Zhen ZHANG , Yong HUANG , Mi ZHANG , Zhuang XIONG , Chengcheng LI

Front. Eng ›› 2025, Vol. 12 ›› Issue (1) : 219 -221.

PDF (422KB)
Front. Eng ›› 2025, Vol. 12 ›› Issue (1) :219 -221. DOI: 10.1007/s42524-025-5501-4
Super Engineering
SUPER ENGINEERING
22000-ton gantry crane
Author information +
History +
PDF (422KB)

Graphical abstract

Keywords

mobile gantry crane / synchronized construction / offshore oil platform manufacturing / technological innovations

Cite this article

Download citation ▾
Zhen ZHANG, Yong HUANG, Mi ZHANG, Zhuang XIONG, Chengcheng LI. 22000-ton gantry crane. Front. Eng, 2025, 12 (1) : 219-221 DOI:10.1007/s42524-025-5501-4

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

China Installation Association, Mechanical Equipment and Lifting Branch (2014). The large-scale equipment installation and hoisting technology exchange conference: On-site observation of the MDGH22000t universal gantry crane hoisting event in Liyang, Jiangsu. Installation, (8): 18 (in Chinese)

[2]

Shi H W, Shi Q J, Wu W H, (2014). Hoisting of the “Honghai” universal gantry crane by Honghua Offshore Oil & Gas Equipment Co., Ltd. Petrochemical Construction, 36( 4): 14–19 (in Chinese)

[3]

Wu W H, (2013). Segmental transportation and assembly plan for the main beam structure of the 22,000-ton truss-arch crane “Honghai”. Science & Enterprise, ( 7): 207–207, 209 (in Chinese)

[4]

YanX DMa J (2017). Operating mechanisms of multi-lifting point bridge and gantry cranes “Taishan” and “Honghai”. Hoisting and Conveying Machinery, (1): 11–15 (in Chinese)

RIGHTS & PERMISSIONS

Higher Education Press

PDF (422KB)

2684

Accesses

0

Citation

Detail

Sections
Recommended

/