Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge
Hongbin YU 1, Zeping LIAN 2,
1.Jinling Institute of Technology, Nanjing 210001, China; 2.Headquarter of Building DA Sheng-guan Bridge, Nanjing 210000, China;
Download: PDF(86 KB)  
Export: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract Based on pile foundation construction of No. 6 main pier, deep mudstone geological foundation and deep-water construction in Nanjing-Dashengguan Yangtze Bridge, the method of super-large-diameter bored pile in deep water is studied. The spread drill, application of PHP mud, and choice of machine are solved by adopting two machines of KTY4000 and KPG300A. Besides, the airlift reversing circulation is selected in slag discharge. The results show that this method can ensure successfully the construction of pier foundation to satisfy the demands of codes.
Keywords PHP slurry      KTY4000 drilling machine      KPG3000A drilling machine      spread drill      
Issue Date: 05 September 2009
 Cite this article:   
Hongbin YU,Zeping LIAN. Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge[J]. Front. Struct. Civ. Eng., 2009, 3(3): 339-343.
 URL:  
http://journal.hep.com.cn/fsce/EN/10.1007/s11709-009-0047-9
http://journal.hep.com.cn/fsce/EN/Y2009/V3/I3/339
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
Hongbin YU
Zeping LIAN
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed