Take JH reservoir as an example to analyze the implementation of resettlement of migrants in reservoirs under construction difficulties and countermeasures

Longbin TAN , Chunlin LIU , Tao WANG

Water Resources and Hydropower Engineering ›› 2025, Vol. 56 ›› Issue (S2) : 91 -95.

PDF (1785KB)
Water Resources and Hydropower Engineering ›› 2025, Vol. 56 ›› Issue (S2) :91 -95. DOI: 10.13928/j.cnki.wrahe.2025.S2.021
research-article
Take JH reservoir as an example to analyze the implementation of resettlement of migrants in reservoirs under construction difficulties and countermeasures
Author information +
History +
PDF (1785KB)

Abstract

In the construction of the reservoir resettlement work is to promote the smooth implementation of the fundamental prerequisite for the construction of the hub project, through the implementation stage of the resettlement of immigrants to implement the analysis of the difficulties in the implementation of the resettlement of immigrants to the implementation of the whole process of the formation of the resettlement of immigrants to effectively control.The JH Reservoir Project was taken as an example, and makes a comprehensive analysis of the implementation of immigrant resettlement after the approval of the preliminary design report of the project, from the perspectives of the construction of organizations, implementation of immigrant resettlement, management of immigrant funds, acceptance of immigrant resettlement, immigrant petitions and rights and interests of the immigrants, and so on, so as to distill the important points of the immigrant resettlement and to put forward the corresponding measures and suggestions according to the local conditions.The result show that: JH Reservoir resettlement implementation difficulties are mainly reflected in the resettlement implementation of the preparatory stage, resettlement implementation stage, resettlement acceptance of the three stages of the 10 aspects, a comprehensive rationalization measures proposed 10 recommendations. The result show that: analyzing the difficulties and proposing countermeasures for the implementation of resettlement of immigrants in under-construction reservoirs and grasping the key points and core of the resettlement implementation work in the outline are of good reference significance for the resettlement of immigrants in similar large and medium-sized water conservancy projects.

Keywords

immigrant resettlement / implementation management / analysis of key difficulties / countermeasures / work recommendations

Cite this article

Download citation ▾
Longbin TAN, Chunlin LIU, Tao WANG. Take JH reservoir as an example to analyze the implementation of resettlement of migrants in reservoirs under construction difficulties and countermeasures. Water Resources and Hydropower Engineering, 2025, 56(S2): 91-95 DOI:10.13928/j.cnki.wrahe.2025.S2.021

登录浏览全文

4963

注册一个新账户 忘记密码

References

PDF (1785KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/