Study on common problems in the use and management of migrant resettlement funds for large and medium-sized water conservancy projects

Longbin TAN , Chunlin LIU , Tao WANG

Water Resources and Hydropower Engineering ›› 2025, Vol. 56 ›› Issue (S2) : 86 -90.

PDF (1785KB)
Water Resources and Hydropower Engineering ›› 2025, Vol. 56 ›› Issue (S2) :86 -90. DOI: 10.13928/j.cnki.wrahe.2025.S2.020
research-article
Study on common problems in the use and management of migrant resettlement funds for large and medium-sized water conservancy projects
Author information +
History +
PDF (1785KB)

Abstract

The smooth implementation of the resettlement work in the reservoir under construction is a fundamental prerequisite to promote the construction of the hub project, through the implementation stage of the resettlement work of immigrants to implement the analysis of the key difficulties, in order to implement the resettlement work of immigrants to form an effective control of the whole process. The JH reservoir project was taken as an example, analyzes the implementation of resettlement work after the approval of the preliminary design report of the project from the perspectives of organization construction, resettlement implementation, resettlement fund management, resettlement acceptance, resettlement petition and rights and interests of the immigrants, etc., and refines the key points of resettlement work, and puts forward the corresponding measures and suggestions according to the local conditions. The result show that: JH Reservoir immigrant resettlement implementation difficulties are mainly reflected in the immigrant resettlement implementation of the preparatory stage, the immigrant resettlement implementation stage, the immigrant resettlement acceptance of the three stages of the 10 aspects, a comprehensive proposed rationalization measures and recommendations for the 10. The result show that: the implementation of resettlement in reservoirs under construction to analyze the difficulties and put forward countermeasures, the outline of the implementation of resettlement to seize the key points and the core of the work of resettlement, similar to large and medium-sized water conservancy projects resettlement work has a good reference significance.

Keywords

resettlement / implementation management / problem analysis / countermeasures / safety and efficiency

Cite this article

Download citation ▾
Longbin TAN, Chunlin LIU, Tao WANG. Study on common problems in the use and management of migrant resettlement funds for large and medium-sized water conservancy projects. Water Resources and Hydropower Engineering, 2025, 56(S2): 86-90 DOI:10.13928/j.cnki.wrahe.2025.S2.020

登录浏览全文

4963

注册一个新账户 忘记密码

References

PDF (1785KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/