Scientific and technological innovation and intelligent construction practice of TB hydropower project

Zhi LI , Wei ZENG , Jinshan LIU , Liqiao LU

Water Resources and Hydropower Engineering ›› 2025, Vol. 56 ›› Issue (S1) : 970 -975.

PDF (3599KB)
Water Resources and Hydropower Engineering ›› 2025, Vol. 56 ›› Issue (S1) :970 -975. DOI: 10.13928/j.cnki.wrahe.2025.S1.143
research-article
Scientific and technological innovation and intelligent construction practice of TB hydropower project
Author information +
History +
PDF (3599KB)

Abstract

As the landmark project of Lancang River Company to achieve the medium and long-term development strategic goal, TB hydropower project shoulders the important mission of innovation and development for hydropower engineering construction in the new era. On the basis of summarizing the hydropower engineering construction management of Lancang River Company for 20 years, this paper puts forward the “1+3+N” system of scientific and technological innovation and green intelligent construction. The proposed system which is guided by the key technology innovation and supported by the intelligent construction platform, tries to build TB hydropower benchmarking project and realize the comprehensive application of intelligent construction technology in hydropower engineering. Through innovative technology, intelligent construction and management function module, the “1+3+N” system has played a vital role in the safe, green, high-quality and efficient construction of the project, and finally enables TB hydropower project to put into operation and generate electricity one year ahead of the schedule of feasibility, creating huge economic and social benefits, and vividly explaining the concept of innovation-driven development.

Keywords

TB Hydropower Project / intelligent construction / scientific and technological innovation / management innovation

Cite this article

Download citation ▾
Zhi LI, Wei ZENG, Jinshan LIU, Liqiao LU. Scientific and technological innovation and intelligent construction practice of TB hydropower project. Water Resources and Hydropower Engineering, 2025, 56(S1): 970-975 DOI:10.13928/j.cnki.wrahe.2025.S1.143

登录浏览全文

4963

注册一个新账户 忘记密码

References

Funding

PDF (3599KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/