Stress analysis of the subsea dynamic riser baseprocess piping

Xuanze Ju , Wei Fang , Hanjun Yin , Ying Jiang

Journal of Marine Science and Application ›› 2014, Vol. 13 ›› Issue (3) : 327 -332.

PDF
Journal of Marine Science and Application ›› 2014, Vol. 13 ›› Issue (3) : 327 -332. DOI: 10.1007/s11804-014-1264-8
Research Papers

Stress analysis of the subsea dynamic riser baseprocess piping

Author information +
History +
PDF

Abstract

Thesubsea dynamic riser base (SDRB) is an important piece of equipment for the floating production platform mooring system. One end is connected to the rigid pipeline, carrying a rigid pipeline thermal expansion load and the other end is connected to a flexible riser, carrying the dynamic load of the flexible riser, so its function is a transition connection between the flexible riser and the rigid pipeline which fixes the flexible riser on the seabed. On the other hand, as a typical subsea product, the design will satisfy the requirements of the standards for subsea products. By studying the stress analysisphilosophy of the topside piping and subsea pipeline, a physical model and procedure for piping stress analysis of the SDRB have been established. The conditions of the adverse design load have been considered, and a combination of the static load from the rigid pipeline and the dynamic load flexibility has also been optimized. And a comparative analysis between the AMSE, DNV and API standards for piping stress with the checking rules has been done. Because the SDRB belongs to the subsea pipeline terminal product, the use of DNV standards to check its process piping stress is recommended. Finally, the process piping stress of the SDRB has been calculated, and the results show that the jacket pipe and the carrier pipe stress of the SDRB process piping satisfy the DNV standards as a whole.The bulkhead cannot be accurately simulated by the AutoPIPE software which uses the FEA software ANSYS in the detailed analysis, but the checking results will still meet the requirements of the DNV standards.

Keywords

subsea product design / subsea dynamic riser base(SDRB) / process piping stress analysis / flexible riser / rigid pipeline

Cite this article

Download citation ▾
Xuanze Ju, Wei Fang, Hanjun Yin, Ying Jiang. Stress analysis of the subsea dynamic riser baseprocess piping. Journal of Marine Science and Application, 2014, 13(3): 327-332 DOI:10.1007/s11804-014-1264-8

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

American Petroleum Institute Design, construction, operation, and maintenance of offshore hydrocarbon pipelines, recommended practice, 2009, 12-18

[2]

American Petroleum Institute Design of risers for floating production systems (FPSs) and tension-leg platforms (TLPs), 2009, 47-110

[3]

American Society of Mechanical Engineers Process piping, 2008, 12-40

[4]

American Society of Mechanical Engineers Pipeline transportation systems for liquid hydrocarbons and other liquids, 2009, 83-84

[5]

American Society of Mechanical Engineers Gas transmission and distribution piping systems, 2010, 104-105

[6]

Antaki GA. Piping and pipeline engineering, 2003, New York: Marcel Dekker Inc., 104-174

[7]

Antani JK, Dick WT, Balch D, Van Der Leij T. Fabrication and installation of the Neptune export lateral PLEMs. Offshore Technology Conference, Houston, USA, OTC 19688, 2008

[8]

Bai Y, Bai Q. Subsea pipelines and risers, 2005, Oxford: Elsevier, 497-508

[9]

Bai Y, Bai Q. Subsea engineering handbook, 2010, Oxford: Elsevier, 572-604

[10]

Bernt T, Smedsrud E. Ormen lange subsea production system. Offshore Technology Conference, Houston, USA, OTC 18965, 2007

[11]

Chen J, Guo H, Qu Y, Liu X, Yan J, Yue Q, Tang M. Dynamic analysis of BTM mooring FPSO of subsea riser & cable system. The Fifteenth Session of China Ocean (Coast) Engineering Symposium, Beijing, 2011, 1: 117-121

[12]

Det Norske Veritas Submarine pipeline systems, 2005, 37-39

[13]

Ellenberger JP. Piping and pipeline calculations manual, 2014, Boston: Butterworth-Heinemann, 123-150

[14]

Fang X. The installation of stp system of wenchang project. China Offshore Oil & Gas (Engineering), 2003, 15(1): 1-11

[15]

International Organization for Standardization Petroleum and natural gas industries—Design and operation of subsea production systems—Part 15: Subsea structures and manifolds, 2010

[16]

Li P, Li T, Zhang H, Liu Z, Zhu P, Lan Q. Fexible riser in deep water FPSO. Shipbuilding of China, 2010, 51(Special2): 378-385

[17]

Robinson R, Grass J. Design chalhnges of a 48-inch pipeline subsea manifold. Offshore Technology Conference, Houston, USA, OTC l55275, 2003

[18]

Robleto R, Williams J. Efficiency and economy of automating displacements for FPSO pipe stress analysis. Offshore Technology Conference, Houston, USA, OTC 20868, 2010

[19]

Schwarz MM. Flexibility analysis of the vessel-piping interface. International Journal of Pressure Vessels and Piping, 2004, 81(2): 181-189

[20]

Triolo D, Mosness T, Jennings J, Rezende J. Liwan gas project: First South China Sea deepwater completion campaign. Offshore Technology Conference, Houston, USA, OTC 23934, 2010

AI Summary AI Mindmap
PDF

145

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/