Analyzing the safety of removal sequences for piles of an offshore jacket platform

Xin-ying Pan , Zhao-de Zhang

Journal of Marine Science and Application ›› 2009, Vol. 8 ›› Issue (4) : 311 -315.

PDF
Journal of Marine Science and Application ›› 2009, Vol. 8 ›› Issue (4) : 311 -315. DOI: 10.1007/s11804-009-8050-z
Article

Analyzing the safety of removal sequences for piles of an offshore jacket platform

Author information +
History +
PDF

Abstract

An inevitable consequence of the development of the offshore petroleum industry is the eventual obsolescence of large offshore structures. Proper methods for removal of decommissioned offshore platforms are becoming an important topic that the oil and gas industry must pay increasing attention to. While removing sections from a decommissioned jacket platform, the stability of the remaining parts is critical. The jacket danger indices D σ and D s defined in this paper are very useful for analyzing the safety of any procedure planned for disassembling a jacket platform. The safest piles cutting sequence can be determined easily by comparing every column of D σ and D s or simply analyzing the figures of every row of D σ and D s.

Keywords

jacket platform / removal / safety analysis / stress

Cite this article

Download citation ▾
Xin-ying Pan, Zhao-de Zhang. Analyzing the safety of removal sequences for piles of an offshore jacket platform. Journal of Marine Science and Application, 2009, 8(4): 311-315 DOI:10.1007/s11804-009-8050-z

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Schroeder D. M., Love M. S. Ecological and political issues surrounding decommissioning of offshore oil facilities in the Southern California Bight[J]. Ocean & Coastal Management, 2004, 47: 21-48

[2]

Yang H., Gao H., Han C. The project decision-making research of the decommissioning offshore patform removing[J]. Ocean Technology, 2004, 23: 81-84

[3]

Eicher J. A., Guan H., Jeng D. S. Stress and deformation of offshore piles under structural and wave loading[J]. Ocean Engineering, 2003, 30: 1791-1806

[4]

Gjerde P., Parsons S. J., Igbenabor S. C. Assessment of jack-up boat impact analysis methodology[J]. Marine Structures, 1999, 12: 371-401

[5]

Zhou S., Zhang T. A study on the decommissioning and abandonment technology and engineering of offshore oil platform[J]. China Offshore Platform, 2002, 16: 1-6

[6]

Virginia P., Doneivan F., dos Santos E. M., et al. Offshore decommissioning issues: Deductibility and transferability[J]. Energy Policy, 2006, 34: 1992-2001

[7]

Jin W., Song J., Gong S., et al. Evaluation of damage to offshore platform structures due to collision of large barge[J]. Engineering Structures, 2005, 27: 1317-1326

AI Summary AI Mindmap
PDF

146

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/