Material flow control technology of ironmaking and steelmaking interface

Bang-fu Huang , Nai-yuan Tian , Zhe Shi , Yue-hua Ding

Journal of Central South University ›› 2014, Vol. 21 ›› Issue (9) : 3559 -3567.

PDF
Journal of Central South University ›› 2014, Vol. 21 ›› Issue (9) : 3559 -3567. DOI: 10.1007/s11771-014-2336-2
Article

Material flow control technology of ironmaking and steelmaking interface

Author information +
History +
PDF

Abstract

In order to achieve higher efficient cohesion match of procedure and equipment between ironmaking and steelmaking interface, the theory of multi-dimensional material flow control was applied to analyze torpedo ladle-iron ladle transportation process between blast furnace and basic oxygen furnace. Moreover, basic parameters of material flow were analyzed and optimized, such as time, temperature and material quantity. Based on operating principles of material flow, control methods were optimized, such as product organization mode, scheduling discipline and scheduling plan of hot metal ladle. Finally, the material flow control technology of ironmaking and steelmaking interface was integrated. Satisfactory effects are obtained after applying the technology in practice. The total turnover number of torpedo ladle decreases from 20 to 18, the hot metal temperature of 1# BF torpedo ladle decreases from 36 °C to 19.5 °C, the hot metal temperature of 2# BF torpedo ladle decreases from 36.6 °C to 19.8 °C, the temperature drop of desulfurization hot metal decreases by 4 °C, and the temperature drop of non-desulfurization hot metal decreases by 2.8 °C. Furthermore, the ironmaking and steelmaking interface system will realize high-efficiency control by using this control technology.

Keywords

ironmaking and steelmaking interface / torpedo ladle / hot metal ladle / material flow control / control technology

Cite this article

Download citation ▾
Bang-fu Huang, Nai-yuan Tian, Zhe Shi, Yue-hua Ding. Material flow control technology of ironmaking and steelmaking interface. Journal of Central South University, 2014, 21(9): 3559-3567 DOI:10.1007/s11771-014-2336-2

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

YinR-yuMetallurgical process engineering [M], 2005, Beijing, Metallurgical Industry Press: 253-260

[2]

LammR. Laser measurement system for the refractory lining of hot torpedo ladles [J]. Iron and Steel Technology, 2013, 10(3): 87-92

[3]

IseiY, HondaT, AkahaneK, TakahashiH. Development of refractory thickness meter for torpedo ladle car [C]. 19th IMEKO World Congress, 2009, Red Hook, NY, Curran Associates: 2415-2419

[4]

LiS, WangY-q, GaoB, WangLei. The finite element analysis to the reformation structure of 75 ton iron ladle based on ANSYS-workbench [C]. Thomas Wohlbier. Advanced Mechanical Design, 2012, Switzerland, Trans Tech Publications Ltd.: 2120-2123

[5]

LiuS-w, JingK-yu. Analysis of the heat loss in a torpedo ladle during the transport process [J]. InterCeram: International Ceramic Review, 2013, 62(1): 37-39

[6]

WangJ, WangK-y, LiuJ-xin. Analysis of wheel-rail dynamic safety of 320 t torpedo ladle car [J]. Journal of Sichuan University, 2011, 43(s2): 178-182

[7]

MakarovD N, GorbachevY P, AndreevV A, GorbunovG V, KocherginaN F. Use of 140-ton ladles to transport liquid pig iron [J]. Metallurgist, 2007, 51(9): 486-488

[8]

ChengY-r, LiangB, ZhouM-hua. Optimization for vehicle scheduling in iron and steel works based on semi-trailer swap transport [J]. Journal of Central South Universits of Technology, 2010, 17(4): 873-879

[9]

LuY-m, WangL-n, ChenH-z, ZhaoY-l, PanQ-j, XueX-rong. Order planning for iron and steel enterprise considering production organization constraints [J]. Journal of Chongqing University, 2012, 35(11): 86-91

[10]

DimitriG G, AharonG. Optimal job-shop scheduling with random operations and cost objectives [J]. International Journal of Production Economic, 2002, 76(2): 147-157

[11]

BertolissiE. Heuristic algorithm for scheduling in the no-wait flow-shop [J]. Journal of Materials Processing Technology, 2002, 11(3): 459-465

[12]

ParkY B. A hybrid genetic algorithm for the vehicle scheduling problem with due times and time deadlines [J]. International Journal of Production Economics, 2001, 73(2): 175-188

[13]

EsquivelS, FerreroS, GallardR, SaltoC, AlfonsoH, SchutzM. Enhanced evolutionary algorithms for single and multi-objective optimization in the job shop scheduling problem [J]. Knowledge-Based Systems, 2002, 1(2): 13-25

[14]

CahitP, AmirA, HidekiK, KosukeK, MasatoshiS. A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms [J]. European Journal of Operational Research, 2007, 180(7): 292-308

[15]

KlausJ, MonaldoM, RobertoS O. Approximation schemes for job shop scheduling problems with controllable processing times [J]. European Journal of Operational Research, 2005, 167(2): 297-319

[16]

QiuJ, TianN-y, LiuM-l, SunG-w, LuZ-xin. Analysis of mass flow parameters for ironmaking/steelmaking interface at BaoSteel [J]. Journal of University of Science and Technology Beijing, 2004, 26(2): 197-201

[17]

ZhangL-q, TianN-y, XuA-j, ZhangJ, JiangX-d, LuZ-xin. Research on realization of ladle multifunction [J]. Journal of University of Science and Technology Beijing, 2007, 29(4): 426

[18]

HuangB-f, HeD-f, TianN-y, XuA-jun. Operational control of torpedo ladles [J]. Journal of University of Science and Technology Beijing, 2010, 32(7): 936-940

[19]

HuangB-f, TianN-y, ShiY-j, KeF-f, YangYi. Scheduling system of ladle [J]. Metallurgy research, 201074-77

[20]

HuangB-f, HeD-f, TianN-y, XuA-j, LiG-s, QiYan. Design and implementation of torpedo car management system [J]. Metallurgical Industry Automation, 2010, 34(4): 16-21

AI Summary AI Mindmap
PDF

96

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/