SCGM(1,m)c model with time-lag and its application in deformation analysis

Zhi-wei Li , Tao Li , Jian-jun Zhu , Ren-qian Wang

Journal of Central South University ›› 2001, Vol. 8 ›› Issue (1) : 40 -44.

PDF
Journal of Central South University ›› 2001, Vol. 8 ›› Issue (1) : 40 -44. DOI: 10.1007/s11771-001-0022-7
Article

SCGM(1,m)c model with time-lag and its application in deformation analysis

Author information +
History +
PDF

Abstract

Originated in the early 1990s, SCGM(1,m)c model has enjoyed widespread application in the fields of urban planning, society economy prediction and modal control in recent years. However, none of these applications have taken account of time-lag effects in the modeling process. Aiming at overcoming the defect, the authors introduced time-lag items into SCGM(1,m)c model and developed a SCGM(1,m)c model with time-lag, then discusses in detail some principal problems in the model, such as parameters estimation, model verifying, model prediction, etc. The model was used on a real slope monitoring project and compared with the conventional SCGM(1,m)c model. The results show an improvement of average models precision from 1.321 to 0.238 and total average of relative prediction errors from 12.41% to 7.98% when the modeling data length ranges from 29 to 48 in the slope monitoring case.

Keywords

grey system / SCGM(1,m)c / time-lag / deformation analysis

Cite this article

Download citation ▾
Zhi-wei Li,Tao Li,Jian-jun Zhu,Ren-qian Wang. SCGM(1,m)c model with time-lag and its application in deformation analysis. Journal of Central South University, 2001, 8(1): 40-44 DOI:10.1007/s11771-001-0022-7

登录浏览全文

4963

注册一个新账户 忘记密码

References

AI Summary AI Mindmap
PDF

96

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/