Assessing Disaster Preparedness and Recovery from Tropical Cyclones in Zimbabwe: Insights from Cyclone Ana in Nyanga
Decide Mabumbo , Nombulelo Kitsepile Ngulube
International Journal of Disaster Risk Science ›› : 1 -15.
Tropical cyclones pose increasing risks in Southern Africa, with impacts shaped not only by hazard intensity but also by underlying vulnerabilities and disaster risk management (DRM) capacity. This study examines preparedness, response, and recovery following Cyclone Ana (2022) in Nyanga District, Zimbabwe, drawing on qualitative data from focus group discussions, key informant interviews, and field observations. Findings reveal persistent gaps in community preparedness, early warning communication, and institutional coordination, with DRM systems remaining largely reactive, centralized, and unevenly implemented. Although warning information was widely disseminated, its technical and generalized nature limited local interpretation and did not consistently prompt protective action. Recovery efforts were similarly constrained by short-term funding cycles and uneven targeting, resulting in variable outcomes across communities. At the same time, strong local capacity for collective action was evident, with communities mobilizing indigenous knowledge, social networks, and mutual support to address immediate needs. Building on these findings, the article positions Cyclone Ana as a baseline for assessing subsequent reforms, including the introduction of impact-based forecasting, anticipatory action frameworks, and strengthened contingency planning. While these developments represent important progress, significant challenges remain in operationalizing them at the local level. The study identifies a critical implementation gap between policy commitments and practice, underscoring the need to better align legislative reform, financing mechanisms, and institutional capacity with community-centered approaches. By linking empirical insights to broader debates on disaster risk governance, the article contributes to understanding how DRM systems can transition from reactive response toward more adaptive, inclusive, and resilience-oriented pathways.
Community-based disaster risk management / Disaster risk management / Early warning systems / Tropical cyclones / Zimbabwe
| [1] |
|
| [2] |
Ashraf, F. 2024. Bridging hazard risk perception: Enhancing knowledge in public health. In Proceedings of the Nineteenth Midwest Association for Information Systems Conference, 16–17 May 2024, Peoria, Illinois, USA. |
| [3] |
|
| [4] |
|
| [5] |
|
| [6] |
|
| [7] |
|
| [8] |
|
| [9] |
|
| [10] |
|
| [11] |
|
| [12] |
|
| [13] |
GoZ (Government of Zimbabwe). 2018. Nyanga District disaster risk management plan (2019–2024). Harare: GoZ. |
| [14] |
GoZ (Government of Zimbabwe). 2021. The 2022 national budget statement: Reinforcing sustainable economic recovery and resilience. Presented to the Parliament of Zimbabwe, 25 November 2021. https://www.veritaszim.net/node/5386. Accessed 17 Jul 2025. |
| [15] |
GoZ (Government of Zimbabwe). 2022a. Assessment report on Tropical Storm Ana: Nyanga District. Harare: GoZ. |
| [16] |
GoZ (Government of Zimbabwe). 2022b. Fifteenth post-Cabinet press briefing: 7 June 2022. Harare: GoZ. Accessed 17 Jul 2025. |
| [17] |
Gutiérrez, G., Z. Stalhandske, E. Mühlhofer, D.N. Bresch, and S. Brönnimann. 2024. Impact-based forecast for critical infrastructure during tropical cyclones. In Proceedings of EGU General Assembly Conference 2024, 14–19 April 2024, Vienna, Austria. |
| [18] |
|
| [19] |
|
| [20] |
Hossain, M.Z., M.T. Islam, T. Sakai, and M. Ishida. 2008. Impact of tropical cyclones on rural infrastructures in Bangladesh. Agricultural Engineering International: The CIGR Ejournal X.https://cigrjournal.org/index.php/Ejounral/article/view/1036. |
| [21] |
|
| [22] |
IMF (International Monetary Fund). 2020. Updated common evaluation framework for IMF capacity development and guidance note. Washington, DC: IMF. https://www.imf.org/-/media/Files/Publications/PP/2020/English/PPEA2020040.ashx. Accessed 15 Jul 2025. |
| [23] |
International Federation of Red Cross and Red Crescent Societies. 2022. Emergency plan of action (EPoA): Zimbabwe/Africa—Tropical depression Ana (MDRZW017). https://go.ifrc.org/reports/15213. Accessed 15 Jul 2025. |
| [24] |
|
| [25] |
|
| [26] |
|
| [27] |
|
| [28] |
|
| [29] |
|
| [30] |
|
| [31] |
Mabumbo, D., N. Nohayi, J.C. Sanchez Ramirez, M. Dessalegn, S. Ruckstuhl. 2024. Navigating climate resilience in fragile settings: A retrospective analysis of the 2023 flood impacts, early warning, and response in Ethiopia’s Somali Region. Colombo, Sri Lanka: IWMI (International Water Management Institute). |
| [32] |
|
| [33] |
|
| [34] |
|
| [35] |
Matveeva, A. 2006. Early warning and early response: Conceptual and empirical dilemmas. The Hague, the Netherlands: Global Partnership for the Prevention of Armed Conflict. |
| [36] |
|
| [37] |
|
| [38] |
MSD (Meteorological Services Department of Zimbabwe). 2022. Alert: Tropical Storm Ana (moving towards the coast of Mozambique). Public weather alert issued 24 Jan 2022. Harare, Zimbabwe: MSD. |
| [39] |
|
| [40] |
|
| [41] |
Norton, R., B.R. Jacobson, K. Venkateswaran, K. MacClune, and D. Hillier. 2023. Towards transformative action: The unfulfilled promise of resilient recovery. The Hague, the Netherlands: Zurich Climate Resilience Alliance.https://zcralliance.org/resources/item/towards-transformative-action-the-unfulfilled-promise-of-resilient-recovery. Accessed 8 Aug 2025. |
| [42] |
|
| [43] |
|
| [44] |
|
| [45] |
|
| [46] |
|
| [47] |
|
| [48] |
|
| [49] |
UNDP (United Nations Development Programme). 2022. ZRBF-BRACT crisis modifier end of project report: September 2022. New York: UNDP. |
| [50] |
UNDRR (United Nations Office for Disaster Risk Reduction). 2019. Global assessment report on disaster risk reduction 2019. Geneva: UNDRR.https://www.undrr.org/publication/global-assessment-report-disaster-risk-reduction-2019. Accessed 25 Jul 2025. |
| [51] |
UNDRR (United Nations Office for Disaster Risk Reduction). 2023. Cyclone Freddy puts Mozambique’s early warning system to the test. Geneva: UNDRR.https://www.undrr.org/feature/cyclone-freddy-puts-mozambique-s-early-warning-system-to-the-test. Accessed 25 Mar 2026. |
| [52] |
UNISDR (United Nations International Strategy for Disaster Reduction). 2009. Global assessment report on disaster risk reduction: Risk and poverty in a changing climate. Geneva: UNISDR.https://www.undrr.org/publication/global-assessment-report-disaster-risk-reduction-2009. Accessed 24 Mar 2026. |
| [53] |
|
| [54] |
WMO (World Meteorological Organization). 2025. Tropical cyclone. https://wmo.int/topics/tropical-cyclone. Accessed 28 Jul 2025. |
| [55] |
|
| [56] |
|
The Author(s)
/
| 〈 |
|
〉 |