EMU Circulation Rescheduling Considering Standby EMU Activation and Deadhead Repositioning under Long-Duration Disruptions

Yunteng Qu , Xiangming Yao , Shirui Yang , Jiaxin Niu , Peng Zhao , Jie Zhang

Urban Rail Transit ›› 2026, Vol. 12 ›› Issue (4) : 621 -633.

PDF
Urban Rail Transit ›› 2026, Vol. 12 ›› Issue (4) :621 -633. DOI: 10.1007/s40864-026-00293-9
Original Research Papers
research-article
EMU Circulation Rescheduling Considering Standby EMU Activation and Deadhead Repositioning under Long-Duration Disruptions
Author information +
History +
PDF

Abstract

Long-duration disruptions on high-speed railways can substantially disturb train operations. Standby EMUs, defined as trainsets kept available at EMU depots for short-notice emergency deployment, and deadhead repositioning are important recovery resources. Considering train-formation compatibility, connection time requirements, operating mileage, and deadhead-line feasibility, this study constructs an EMU connection network and develops an EMU circulation rescheduling model. The model minimizes train cancellations, EMU connection deviation, total EMU operating mileage, and total EMU operating time. A case study based on Wuhan EMU Depot considers eight section-blockage scenarios. All scenarios are solved within 40 s, indicating that the method satisfies the timeliness requirements of emergency dispatching. The model automatically inserts feasible deadhead lines into the adjusted timetable and coordinates standby EMU activation with return repositioning. Coordinating standby EMU activation with deadhead repositioning reduces train cancellations in three of the four paired scenarios with standby EMU deployment, with reductions of up to two trains. The proposed method provides practical decision support for EMU circulation rescheduling during long-duration disruptions.

Keywords

EMU circulation rescheduling / Mixed-integer linear programming / High-speed railway / Standby EMU / Deadhead repositioning

Cite this article

Download citation ▾
Yunteng Qu, Xiangming Yao, Shirui Yang, Jiaxin Niu, Peng Zhao, Jie Zhang. EMU Circulation Rescheduling Considering Standby EMU Activation and Deadhead Repositioning under Long-Duration Disruptions. Urban Rail Transit, 2026, 12 (4) : 621-633 DOI:10.1007/s40864-026-00293-9

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Zhang P, Zhao P, Qiao K, et al.A multistage decision optimization approach for train timetable rescheduling under uncertain disruptions in a high-speed railway network. IEEE Trans Intell Transp Syst, 2023, 24: 6307-6321

[2]

Ren Y, Zhang Q, Yuan Z, et al.Research on dynamic adjustment of arrival and departure tracks in high-speed railway station based on rolling horizon optimization. Railw Transp Econ, 2021, 43: 96-102

[3]

Zhou M, Gu H, Dong H, Liu R, Liu X. Multi-plan collaborative rescheduling of high-speed train operation considering the utilization of rolling stock and arrival and departure tracks. Acta Autom Sinica, 2024, 50(8): 1577-1588

[4]

Xu P, Zhang D, Peng H, et al.Train rescheduling for high-speed railway under multiple disturbances. J Railw Sci Eng, 2021, 18: 1723-1731

[5]

Zhang C, Gao Y, Cacchiani V, Yang L, Gao Z. Train rescheduling for large-scale disruptions in a large-scale railway network. Transp Res B Methodol, 2023, 174: 102786

[6]

Zhan S, Wong SC, Shang P, et al.Integrated railway timetable rescheduling and dynamic passenger routing during a complete blockage. Transp Res Part B Methodol, 2021, 143: 86-123

[7]

Zhang P, Zhao P, Qiao K, et al.Research on high-speed railway timetable rescheduling considering passenger transfer. J China Railw Soc, 2022, 44: 8-15

[8]

Wen P, Zhao P, Yao X, et al.Timetable rescheduling during the last-train period in a high-speed rail network considering passenger transfer connections. J China Railw Soc, 2022, 44: 1-9

[9]

Zhu Y, Goverde RMP. Dynamic railway timetable rescheduling for multiple connected disruptions. Transp Res C Emerg Technol, 2021, 125: 103080

[10]

Li D, Zhao J, Peng Q, Wang D, Zhong Q. Rolling stock rescheduling in high-speed railway networks via a nested benders decomposition approach. Transp Res C Emerg Technol, 2025, 171: 105001

[11]

Zhan S. Real-time high-speed train rescheduling considering multiple-unit connections. J Transp Eng Inf, 2020, 18(1–9):38

[12]

Li Q, Peng Q, Zhang Y, et al.A column generation approach for high-speed railway rolling stock rescheduling. J Transp Eng Inf, 2025, 23(2): 136-149

[13]

Zhou L, Peng Q, Zhang Z, et al.Research on collaborative rescheduling for rolling stock and crew on high-speed railways. Railw Transp Econ, 2021, 43: 1-7

[14]

Li Z, Duan J, Zeng Y. Train operation adjustment model based on intelligent application. China Railw Sci, 2021, 42: 173-182

[15]

Long S, Luan X, Corman F. Passenger-oriented rescheduling of trains and rolling stock for handling large passenger demand: linearized models with train capacity constraint. Transp B Transp Dyn, 2021, 9: 641-672

[16]

Su B, D’Ariano A, Su S, Wang X, Tang T. Integrated train timetabling and rolling stock rescheduling for a disturbed metro system: a hybrid deep reinforcement learning and adaptive large neighborhood search approach. Comput Ind Eng, 2023, 186: 109742

[17]

Y. Tan, 2023 Integrated optimization of train rescheduling and rolling stock circulation rescheduling based on logic benders decomposition, M.S. thesis, Beijing Jiaotong University, Beijing, China, https://doi.org/10.26944/d.cnki.gbfju.2023.002418

[18]

Peng Q, Jiang S, Liu S, et al.Integrated metro train timetabling and rolling stock rescheduling under multiple disturbances. J Transp Syst Eng Inf Technol, 2024, 24: 113-125

[19]

Niu J, Qiao K, Zhao P. Reliability improvement of rolling stock planning with maintenance requirements for high-speed railway. Reliab Eng Syst Saf, 2025, 259: 110972

[20]

Wen P, Zhao P, Qiao K, Zhang P, Li P. Integrated optimization approach for high-speed railway rescheduling with passenger transfer and compensation mechanisms. IEEE Trans Intell Transp Syst, 2025, 26(12): 21651-21666

[21]

Chen Z, Chen J, Zheng H, Gao T. Enhancing high-speed railway timetable resilience: a two-level spatiotemporal network model focused on disturbance absorption. Urban Rail Transit, 2025, 11: 67-89

Funding

National Natural Science Foundation of China(U2268207)

Natural Science Foundation of Beijing Municipality(L2601029)

Rights & permissions

The Author(s)

PDF

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉