Shield Attitude Adjustment Induced by Slurry Pressure Balance (SPB) Shield Tunneling Considering the Effects of Overbreak Cutter: A Numerical Simulation by DEM and Engineering Application

Xiang Shen , Dajun Yuan , Dalong Jin , Xiao Wang , Xiangsheng Chen

Urban Rail Transit ›› 2023, Vol. 9 ›› Issue (3) : 221 -232.

PDF
Urban Rail Transit ›› 2023, Vol. 9 ›› Issue (3) : 221 -232. DOI: 10.1007/s40864-023-00189-y
Original Research Papers

Shield Attitude Adjustment Induced by Slurry Pressure Balance (SPB) Shield Tunneling Considering the Effects of Overbreak Cutter: A Numerical Simulation by DEM and Engineering Application

Author information +
History +
PDF

Abstract

Based on a cross-river tunnel of Wuhan Metro Line 8, we present a two-dimensional discrete element model for shield attitude adjustment considering the effect of overbreak cutters. The shield shell mechanics under the influence of over-excavation rate, over-excavation orientations, and overburden load are simulated, and the tunneling mechanics law and the ultimate range during the adjustment of the shield attitude are investigated. The simulation results indicate the following: (1) The greater the over-excavation rate, the smaller the force exerted by the soil layer in the negative direction of the shield movement; therefore, increasing the over-excavation rate is helpful in expanding the range of shield attitude adjustment. (2) The shield is stressed symmetrically while conducting positive and negative horizontal adjustments in the soil layer, which has a symmetrical distribution, but vertical upward adjustment is more difficult than vertical downward adjustment. (3) With the increase in overburden load, the space of the shield attitude adjustment is gradually reduced at the same over-excavation rate. A good engineering application was achieved in this project using the simulation model. It is recommended to use the attitude adjustment method by controlling the tunneling parameters. In difficult situations such as high overlying loads, the over-excavation cutter can be used to assist in adjusting the shield attitude.

Keywords

Subway tunnel / Shield attitude / Overbreak cutter / Discrete element method (DEM)

Cite this article

Download citation ▾
Xiang Shen, Dajun Yuan, Dalong Jin, Xiao Wang, Xiangsheng Chen. Shield Attitude Adjustment Induced by Slurry Pressure Balance (SPB) Shield Tunneling Considering the Effects of Overbreak Cutter: A Numerical Simulation by DEM and Engineering Application. Urban Rail Transit, 2023, 9(3): 221-232 DOI:10.1007/s40864-023-00189-y

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Chen XS. Research on combined construction technology for cross-metro tunnels in underground spaces. Engineering, 2018, 4(1): 103-111

[2]

Qian QH, Lin P. Safety risk management of underground engineering in China: Progress, challenges and strategies. J Rock Mech Geotech, 2016, 8: 423-442

[3]

Geng Z, Jin DL, Yuan D. Face stability analysis of cohesion-frictional soils considering the soil arch effect and the instability failure process. Comput Geotech, 2023, 2023(153):

[4]

Sugimoto M, Sramoon A. Theoretical model of shield behavior during excavation. I: Theory. J Geotech Geoenviron Eng, 2002, 128(2): 138-155

[5]

Wang LT, Yang X, Gong GF Pose and trajectory control of shield tunneling machine in complicated stratum. Autom Constr, 2018, 93: 192-199

[6]

Shen X, Yuan DJ, Jin DL. Influence of shield attitude change on shield–soil interaction. Appl Sci, 2019, 9(9): 1812

[7]

Tang L, Kong XX, Ling XZ Deviation correction strategy for the earth pressure balance shield based on shield–soil interactions. Front Mech Eng, 2022, 17(2): 20

[8]

Yue M, Sun W, Hu P. Dynamic coordinated control of attitude correction for the shield tunneling based on load observer. Autom Constr, 2012, 24: 24-29

[9]

Sugimoto M, Sramoon A, Konishi S Simulation of shield tunneling behavior along a curved alignment in a multilayered ground. J Geotech Geoenviron, 2007, 133(6): 684-694

[10]

Hu XT, Huang YA, Yin ZP Optimization-based model of tunneling-induced distributed loads acting on the shield periphery. Autom Constr, 2012, 24: 138-148

[11]

Sugimoto M, Chen J, Sramoon A. Frame structure analysis model of tunnel lining using nonlinear ground reaction curve. Tunn Undergr Space Technol, 2019, 94

[12]

Broere W, Faassen TF, Arends G Modelling the boring of curves in (very) soft soils during microtunnelling. Tunn Undergr Space Technol, 2007, 22(5–6): 600-609

[13]

Festa D, Broere W, Bosch JW. Kinematic behaviour of a tunnel boring machine in soft soil: theory and observations. Tunn Undergr Space Technol, 2015, 49: 208-217

[14]

Sramoon A, Sugimoto M, Kayukawa K. Theoretical model of shield behavior during excavation. II: Application. J Geotech Geoenviron Eng, 2002, 128(2): 156-165

[15]

Xiao HH, Chen ZY, Cao RL Prediction of shield machine posture using the GRU algorithm with adaptive boosting: a case study of Chengdu Subway project. Transp Geotech, 2022, 37

[16]

Shen X, Yuan DJ, Cao LQ Experimental investigation of the failure of shield grease seals under the influence of environmental factors: a case study. Eng Fail Anal, 2022, 133

[17]

Yue M, Sun W, Wei J. Sliding mode robust controller for automatic rectification of shield machine. J Cent South Univ, 2011, 18(2): 536-541

[18]

Deng HS, Fu HL, Yue S Ground loss model for analyzing shield tunneling-induced surface settlement along curve sections. Tunn Undergr Space Technol, 2022, 119

[19]

Zhu HZ, Wang DY, Shi B Performance monitoring of a curved shield tunnel during adjacent excavations using a fiber optic nervous sensing system. Tunn Undergr Space Technol, 2022, 124

[20]

Chen J, Li ZM. Theoretical algorithm for over-excavated volume and articulation angle during shield tunneling along sharp curves. China J Highw Trans, 2017, 30(18): 66-73.

[21]

Guo YD, Jin DL, Li XG Effect of cutting blind zones on the performance of the rectangular pipe jacking machine with multiple cutterheads: a DEM study. Tunn Undergr Space Technol, 2023, 134

[22]

Zhu H, Cheng P, Zhuang X, Li Y, Li P. Assessment and structural improvement on the performance of soil chamber system of EPB shield assisted with DEM modeling. Tunn Undergr Space Technol, 2020, 96

[23]

Johnson KL, Kendall K, Roberts A. Surface energy and the contact of elastic solids. Proc R Soc Lond A Math Phys Sci, 1971, 324(1558): 301-313.

[24]

Jiang MJ, Konrad JM, Leroueil S. An efficient technique for generating homogeneous specimens for DEM studies. Comput Geotech, 2003, 30(7): 579-597

[25]

Liang RZ, Xia TD, Hong Y Effects of above-crossing tunnelling on the existing shield tunnels. Tunn Undergr Space Technol, 2016, 58: 159-176

[26]

Wei S, Liang RZ, Mei GX Experimental investigation on the deformation characteristics of locking-steel-pipe (LSP) pile retaining structure during excavation in sand. Undergr Space, 2022, 7: 1098-1114

[27]

Li YT, Qiao SG, Zhang ZH, Yong LM. Xie L. The construction technology of Earth Pressure Balance shield in sand stratum section. The 6th international conference on applied mechanics and civil engineering (AMCE2016), 2017, Boca Raton: CRC Press-Taylor & Francis Group 137-141.

[28]

Mo HH, Chen JS. Study on inner force and dislocation of segments caused by shield machine attitude. Tunn Undergr Space Technol, 2008, 23: 281-291

Funding

National Natural Science Foundation of China(52108377)

Open fund project of Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province(ZUCC-UST-22-06)

AI Summary AI Mindmap
PDF

266

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/