Computation of Energy Absorption and Residual Voltage in a Fourth Rail LRT Station Arresters in EMTP-RV: A Comparative Study
Farah Asyikin Abd Rahman , Mohd Zainal Abidin Ab Kadir , Ungku Anisa Ungku Amirulddin , Miszaina Osman
Urban Rail Transit ›› 2021, Vol. 7 ›› Issue (2) : 71 -83.
Computation of Energy Absorption and Residual Voltage in a Fourth Rail LRT Station Arresters in EMTP-RV: A Comparative Study
This paper presents a study on the performance of a fourth rail direct current (DC) urban transit affected by an indirect lightning strike. The indirect lightning strike was replicated and represented by a lightning-induced overvoltage by means of the Rusck model, with the sum of two Heidler functions as its lightning channel base current input, on a perfect conducting ground. This study aims to determine whether an indirect lightning strike has any influence with regard to the performance of the LRT Kelana Jaya line, a fourth rail DC urban transit station arrester. The simulations were carried out using the Electromagnetic Transients Program–Restructured Version (EMTP–RV), which includes the comparison performance results between the 3EB4-010 arrester and PDTA09 arrester when induced by a 90 kA (9/200 µs). The results demonstrated that the PDTA09 arrester showed better coordination with the insulated rail bracket of the fourth rail. It allowed a lower residual voltage and a more dynamic response, eventually resulting in better voltage gradient in the pre-breakdown region and decreased residual voltage ratio in the high current region.
DC transit / Electromagnetic Transients Program–Restructured Version / Fourth rail / Indirect lightning / Lightning-induced overvoltage / Surge arrester
| [1] |
Siemens Industry Inc Insulation Coordination Studies-Selection of Insulation Strength for System Equipment, 2014, Germany: Erlangen |
| [2] |
Woodworth J “Insulation Coordination FAQ,” Arrester Works, 2010. [Online]. Available: http://www.arresterworks.com/services/insulation_studies.php. [Accessed: 17-Nov-2019]. |
| [3] |
Shahan Z “History of Wind Turbines,” Renewable Energy World, 2014. [Online]. Available: https://www.renewableenergyworld.com/2014/11/21/history-of-wind-turbines/#gref. [Accessed: 23-Nov-2019]. |
| [4] |
Energy Matters Webmaster “Solar Panel Brief History and Overview,” Energy Matters, 2018. [Online]. Available: https://www.energymatters.com.au/panels-modules/. [Accessed: 23-Nov-2019]. |
| [5] |
UITP (2018) “World Metro Figures 2018,” Brussels, Belgium. |
| [6] |
Li B, Qi R, Du Y, and Chen M (2018) “Lightning surge analysis in light rail transit using the FDTD method.” 34th Int Conf Light Prot ICLP 2018(152100): 1–6 |
| [7] |
|
| [8] |
Fichera F, Mariscotti A, and Ogunsola A (2013) “Evaluating stray current from DC electrified transit systems with lumped parameter and multi-layer soil models.” In IEEE EuroCon 2013: 1187–1192. |
| [9] |
|
| [10] |
Team Railway Technology, “DEHN Protects the Railway Infrastructure,” DEHN SE + Co KG. [Online]. Available: https://www.dehn-international.com/en/dehn-protects-railway-technology. [Accessed: 03-Sep-2019]. |
| [11] |
Morita G et al. (2016) “Experimental study on new type earth mesh in railway substations aimed at lightning protection.” In 2016 33rd International Conference on Lightning Protection, ICLP 1–6. |
| [12] |
Hayashiya H, Koguchi N, Yamamoto H, Ozaki T, Sakurai T and Inoue R (2012) “Improvement of grounding system of DC traction substation in railway power supply system: Advansed attempts of East Japan Railway Company.” 31st Int Conf Light Prot ICLP, 1–6 |
| [13] |
|
| [14] |
|
| [15] |
Zhou Q and Du Y (2006) “Analysis of Lightning Transients in a DC traction power system of electrified railway using EMTP.”4: 1831–1835 |
| [16] |
Polimac V, Jhutty A and Fraser M (1999) “Application of HV Insulation Coordination Techniques to DC Railway Systems.” In High Voltage Engineering Symposium, 2.372-2.376. |
| [17] |
Zoro R, Pakki RR, and Komar R (2017) “Lightning protection for electric railway in Indonesia telecommunication and signalling system.” Int Conf High Volt Eng Power Syst ICHVEPS 2017-Janua: 476–478 |
| [18] |
|
| [19] |
Hanekom A “Session Eleven: Lightning Protection of Rail and Related Industries The rail environment.” In Earthing, Lightning & Surge Protection Conference–IDC Technologies, 1–5. |
| [20] |
|
| [21] |
Konsortium CMC-COLAS-Uniway, “Kelana jaya line extension project: Power supply overall traction system description,” 2019. |
| [22] |
Railway Technology Webmaster, “Railway Technology Kuala Lumpur,” 2019. [Online]. Available: https://www.railway-technology.com/projects/kuala-lumpur-driverless-metro/. [Accessed: 24-Oct-2019]. |
| [23] |
|
| [24] |
Citizen Journalist Malaysia (2010)“Putra LRT subway service delayed after lightning,” Citizen Journalist Malaysia |
| [25] |
Joibi N “LRT service breaks down during peak hour.” The Star, 11-Feb-2013. |
| [26] |
|
| [27] |
|
| [28] |
Synthane Taylor, “Cast Epoxy Insulators,” Synthane Taylor, 2018. [Online]. Available: http://www.synthanetaylor.com/cast-epoxy-insulators/. [Accessed: 29-Jul-2020]. |
| [29] |
|
| [30] |
|
| [31] |
IEEE Power Engineering Society (1997) IEEE Std 1243-1997: IEEE Guide for Improving the Lightning Performance of Transmission Lines |
| [32] |
Whitehead JT et al. (1993) “IEEE Working Group Report Estimating Lightning Performance of Transmission Lines II-Updates to Analytical Models.” |
| [33] |
The Lightning Performance of Overhead Lines Working Group for IEEE and 1410 (2011) IEEE STD 1410-2010: Guide for Improving the Lightning Performance of Electric Power Overhead Distribution Lines 2010 |
| [34] |
|
| [35] |
Hileman AR (2001) Insulation Coordination for Power Systems 17(2) |
| [36] |
Abu Bakar H (2015) “Fast Transient Simulation of IEEE Recommended Surge Arrester Model on a Transmission Line Using Alternative Transient Program (ATP),” Universiti Tun Hussien Onn, Malaysia |
| [37] |
Muhamad Y (2015) “Fast Transient Simulation of Pinceti Surge Arrester Model on a Transmission Line Using ATP Software,” Universiti Tun Hussein Onn Malaysia |
| [38] |
Acer Voltage Ltd., “Surge Arresters Overvoltage Limiters,” Hradec Kralove, Czech Reoublic. |
| [39] |
Hsiao S (2012) “Simulation and Analysis of Metal-Oxide Surge Block Arrester Dynamic Characteristics,” J Chinese Inst Eng 2013, 1–11 |
| [40] |
|
| [41] |
|
| [42] |
|
| [43] |
|
| [44] |
|
| [45] |
|
| [46] |
|
| [47] |
Mottola F (2007) “Methods and Techniques for the Evaluation of Lightning Induced Overvoltages on Power Lines. Application To Mv Distribution Systems for Improving the Quality of Power Supply.” 158 |
| [48] |
Praneeth KN, Chandrasekaran K, Kumar S, and Punekar GS, “Estimation of Steep Fronted and Full Wave Lightning Channel-Base-Current Function Parameters using Genetic Algorithm.” 1–7. |
| [49] |
|
| [50] |
|
| [51] |
|
| [52] |
ABB Switzerland Ltd Overvoltage Protection Metal-Oxide Surge Arresters in Medium-Voltage Systems (Application Guidelines), 2018 6 Wettingen, Switzerland: ABB Switzerland Ltd |
| [53] |
|
| [54] |
|
| [55] |
WG C4.407 (2013) Lightning Parameters for Engineering Applications. Cigre, 2013 |
| [56] |
|
| [57] |
Izadi M, Ab Kadir MZA and Hajikhani M (2015) On the lightning electromagnetic fields due to channel with variable return stroke velocity. Math Probl Eng, vol. 2015, no. April 2016, 2015 |
| [58] |
|
/
| 〈 |
|
〉 |