The CESuRa System: Allowing Changes in a Rail Track Profile While Maintaining Full Vertical Support
Andy Foan , Travis Thonstad , John F. Stanton
Urban Rail Transit ›› 2018, Vol. 4 ›› Issue (4) : 198 -210.
The CESuRa System: Allowing Changes in a Rail Track Profile While Maintaining Full Vertical Support
A light rail passenger transportation system is being built in Seattle, WA, USA, that traverses Lake Washington over an existing pontoon bridge. The water level in Lake Washington changes throughout the year. This causes rotations of the transition spans, which are needed at each end of the bridge to carry traffic between the fixed, land-based structure, and the floating structure. This paper explains a novel method, the Curved Element Supported Rail (CESuRa) system, that provides rails with the ability to undergo joint rotations at the ends of the transitions spans without risk of damage, while maintaining full vertical support of the track across the joint. The geometric characteristics on which it depends for proper operation, considerations that must be accounted for when using the system for other applications in the future, and an overview of the implementation of the system on the floating bridge are discussed.
Light rail transit / Floating bridges / Pontoon bridges / Expansion joints / Rail hinge / Track bridge
| [1] |
KPFF (2005) Homer Hadley interstate 90 Floating Bridge test program for light rail transit draft test report |
| [2] |
|
| [3] |
UIC (2009) UIC 776-2 design requirements for rail-bridges based on interaction phenomena between train, track, and bridge |
| [4] |
Armitage RA, Sharpe P, Heggie W, Rogers A (2002) Innovative design of transition zones. In: Proceedings, railway engineering 2002: 5th international conference and exhibition, London, UK, p 23 |
| [5] |
Gallage C, Dareeju B, Dhanasekar M (2013) State-of-the-art: track degradation at bridge transitions. In: Proceedings, 4th international conference on structural engineering and construction management, Kandy, Sri Lanka, pp 40–52 |
| [6] |
|
| [7] |
|
| [8] |
Quade PB (2006) Douglas Inc. East Corridor HCT—Summary of I-90 Floating Bridge (Homer Hadley) Studies. In: Final report for sound transit |
| [9] |
Rao RR, Sanghvi S (2000) Design of continuous welded rail on a suspension bridge. In: Proceedings, AREMA annual conference, Dallas, TX, USA |
| [10] |
Hess J (2009) Rail expansion joints—the underestimated track work materials? In: Track-bridge interaction on high-speed railways, CRC Press, London, pp 149–164 |
| [11] |
Cooper T, Foan A, Thonstad T (2013) I-90 track bridge—the challenge of taking light rail vehicles on to the Homer Hadley floating bridge. In: Proceedings, international bridge conference, Pittsburgh, PA, USA |
| [12] |
|
| [13] |
Sedarat H, Talebinejad I, Kozak A, Krimotat A, Cooper T, Harrison JA, Sleavin J, Cornish P (2013) Dynamic response of a floating bridge to a moving light rail train. In: Proceedings, structures congress 2013, Pittsburg, PA, USA |
| [14] |
Thonstad T (2013) Specialized track bridge structure for light rail construction on floating bridges. In: M.S.C.E. Thesis, University of Washington, Seattle |
| [15] |
|
| [16] |
Ketchum C, Cooper T, Foan A, Joy R, Sedarat H, Sleavin J (2015) Dynamic simulations in support of installation of light rail tracks on the Homer H. Hadley Memorial floating bridge. In: Proceedings, the Stephenson conference, London, UK |
| [17] |
|
| [18] |
RSSB (2011) GC/RT5021 Iss 5: track system requirements. Rail safety and standards board, London, UK |
| [19] |
AREMA (2002) Manual for railway engineering. American Railway engineering and maintenance of way association, Lanham, MD, USA |
/
| 〈 |
|
〉 |