Potential Benefits and Obstacles of Implementing Driverless Train Operation on the Tyne and Wear Metro: A Simulation Exercise

Jonathan Peter Powell , Anna Fraszczyk , Chun Nok Cheong , Ho Ki Yeung

Urban Rail Transit ›› 2016, Vol. 2 ›› Issue (3-4) : 114 -127.

PDF
Urban Rail Transit ›› 2016, Vol. 2 ›› Issue (3-4) : 114 -127. DOI: 10.1007/s40864-016-0046-9
Original Research Papers

Potential Benefits and Obstacles of Implementing Driverless Train Operation on the Tyne and Wear Metro: A Simulation Exercise

Author information +
History +
PDF

Abstract

Metro systems around the world have many differences in their design and operation, one aspect of which is the level of automation. The most advanced technology available allows for unattended train operation with no staff on-board, which can bring a number of benefits. As a result, this is becoming increasingly common for new-build metro systems (such as the Dubai Metro), as well as for upgrades of traditional driver-led systems (such as Paris Métro Line 1). This paper uses the Tyne and Wear Metro as a case study to highlight the potential benefits and obstacles of implementing driverless trains on an existing metro system. This investigation has two parts: a review of the challenges of implementing increasing levels of automation for the existing Metro infrastructure and a simulation exercise to compare automatic train operation with manual driving on the core section of the Metro network. The results of the simulation exercise show that significant increases in the capacity of the Tyne and Wear Metro system are possible when automatic train operation is implemented in conjunction with resignalling. However, low adhesion conditions represent a significant risk to achieving this capacity increase reliably, and additional measures to mitigate low adhesion conditions would be required. The study also discusses the infrastructure upgrades required to convert an existing system to unattended train operation. The most significant obstacle for the Metro is that it mostly runs at ground level, with some sections shared with main line services. The costs associated with securing the tracks and ensuring compatibility with main line trains mean that the Metro is not a particularly promising application for driverless train operation at this time. Nonetheless, the issues discussed in the paper are very much relevant for other metro systems, and the methodology of this study is easily transferrable.

Keywords

Metro / Automation / Driverless train / Simulation

Cite this article

Download citation ▾
Jonathan Peter Powell, Anna Fraszczyk, Chun Nok Cheong, Ho Ki Yeung. Potential Benefits and Obstacles of Implementing Driverless Train Operation on the Tyne and Wear Metro: A Simulation Exercise. Urban Rail Transit, 2016, 2(3-4): 114-127 DOI:10.1007/s40864-016-0046-9

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Mew GM. The Post Office railway. Proc Inst Mech Eng, 1964, 179(3A): 39-56.

[2]

Dell R, Manser AW. Automatic driving of passenger trains on London Transport. Proc Inst Mech Eng, 1964, 179(3A): 24-38.

[3]

Duffy MC. Electric railways 1880–1990, 2003, London: IET

[4]

Barwell FT, Coales JP, Barton HHC. Application of automatic control theory to railways. Proc Inst Mech Eng, 1964, 179(3A): 8-23.

[5]

Nelson DO (2013) Automated metro operations: challenges and opportunities. Paper presented at the 3rd international conference on urban public transportation systems, Paris, 17–20 Nov 2013

[6]

Ruhlmann H. Automatic driving of trains. Proc Inst Mech Eng, 1964, 179(3A): 106-112.

[7]

METPO Info International (2015) Moscow Subway History, 1935–2015. METPO Info International (2015 digest):8–15

[8]

Kekonius O, Kallberg NO. The automatic pilot for underground trains in Stockholm. Proc Inst Mech Eng, 1964, 179(3A): 71-79.

[9]

La Vanguardia Española (1966) Presente y Futuro del Metropolitano de Barcelona. La Vanguardia Española 18 Aug:19

[10]

Ito T, Ebihara H. Automatic train operation by programme control. Proc Inst Mech Eng, 1964, 179(3A): 57-61.

[11]

UITP World Report on Metro Automation, 2016, Brussels: UITP

[12]

Malla R (2013) The trend to automation. Paper presented at the 4th Automated Metro Seminar, London, 6 Sept 2013

[13]

European Rail Research Advisory Council (2012) Metro, light rail and tram systems in Europe

[14]

Howard DF. Tyne and Wear Metro—a modern rapid transit system. Proc Inst Mech Eng, 1976, 190: 121-136

[15]

Howard DF, Layfield P. Tyne and Wear Metro: concept, organization and operation. Proc Inst Civ Eng, 1981, 70(4): 651-668.

[16]

Davoudi S, Gillard A, Healey P, Pullen B, Raybould S, Robinson F, Silcock D, Usher D, Wymer C. The longer term effects of the Tyne and Wear Metro, 1993, Crowthorne: Transport Research Laboratory

[17]

Mackay KR. Sunderland metro—challenge and opportunity. Proc ICE–Munic Eng, 1999, 133(2): 53-63.

[18]

Nexus (2014) Metro strategy 2030 background information

[19]

Milroy IP (1980) Aspects of automatic train control. Dissertation, Loughborough University

[20]

Gunselmann W (2005) Technologies for increased energy efficiency in railway systems. Paper presented at the 2005 European conference on power electronics and applications, Dresden, 11–14 Sept 2005

[21]

Thomas P. Allan J, Brebbia CA, Rumsey AF, Scuitto G, Sone S, Goodman CJ. The feasibility case for converting existing heavy metro systems to driverless operation. Computers in railways X, 2006, Ashurst: WIT Press 363-372

[22]

Georgescu MP. Allan J, Brebbia CA, Rumsey AF, Scuitto G, Sone S, Goodman CJ. Driverless CBTC—specific requirements for CBTC systems to overcome operation challenges. Computers in railways X, 2006, Ashurst: WIT Press 401-409

[23]

Vuchic VR (2014) Maintaining performance with full automation. Metro Report International (March):36–39

[24]

Cohen JM, Barron AS, Anderson RJ, Graham DJ. Impacts of unattended train operations on productivity and efficiency in metropolitan railways. Transp Res Rec, 2015, 2534: 75-83

[25]

Hernandez M, Malla R (2016) Metro automation: a safe and flexible solution. Pub Transp Int (1/2016):24–25

[26]

Lockyear MJ. Changing track: moving-block railway signalling. IEE Rev, 1996, 42(1): 21-25

[27]

Fabbian F. Allan J, Brebbia CA, Rumsey AF, Scuitto G, Sone S, Goodman CJ. Converting existing service to fully automatic operation. Computers in railways X, 2006, Ashurst: WIT Press 373-379

[28]

Ossent T (2010) Paris experience in driverless metro: increasing capacity, reducing costs. Paper presented at the World Metrorail Congress, London, 22–25 March 2010

[29]

Chiusolo S, Dicembre A, Ricci S, Sorace F (2011) Automation of high density metro lines: Rome line A case study. Paper presented at automated people movers and transit systems 2011, Paris, 22–25 May 2011

[30]

Karvonen H, Aaltonen I, Wahlström M, Salo L, Savioja P, Norros L. Hidden roles of the train driver: a challenge for metro automation. Interact Comput, 2011, 23(4): 289-298

[31]

Fraszczyk A, Brown P, Duan S. Public perception of driverless trains. Urban Rail Transit, 2015, 1(2): 78-86

[32]

Gill DC (1998) The impact of moving block train control on heavy metros. Paper presented at the international conference on developments in mass transit systems, London, 20–23 April 1998

[33]

Thomas PD (1980) Longitudinal control for guided transport. Dissertation, Loughborough University

[34]

Malavasi G, Palleschi P, Ricci S. Driving and operation strategies for traction-energy saving in mass rapid transit systems. Proc Inst Mech Eng Part F, 2011, 225(5): 475-482

[35]

Domínguez M, Fernández A, Cucala AP, Lukaszewicz P. Optimal design of metro automatic train operation speed profiles for reducing energy consumption. Proc Inst Mech Eng Part F, 2011, 225(5): 463-474

[36]

Powell JP, Palacín R. Passenger stability within moving railway vehicles: limits on maximum longitudinal acceleration. Urban Rail Transit, 2015, 1(2): 95-103

[37]

McKenna D. Operating requirements of an automatic railway. Proc Inst Mech Eng, 1964, 179(3A): 3-7.

[38]

Mancone P (2011) Automation of Line 1: a real opportunity for the Parisian Metro. Paper presented at automated people movers and transit systems 2011, Paris, 22–25 May 2011

[39]

BBC (2014) Driverless Tube trains: unions vow ‘war’ over plan. BBC News, 28 Feb 2014. http://www.bbc.co.uk/news/uk-england-london-26381175. Accessed 21 Sept 2016

[40]

Shirres D (2016) Subway revival. Rail Engineer 143 (Sept):16–21

[41]

Morton D, Litterst R (2013) Optimizing headway with ETCS and ATO. Paper presented at the 10th world congress on railway research, Sydney, 25–27 Nov 2013

[42]

Bienfait B, Zoetardt P, Barnard B (2012) Automatic train operation: the mandatory improvement for ETCS applications. Paper presented at aspect 2012, London, 10–12 Sept 2012

[43]

Powell JP, Palacín R (2015) Benchmarking suburban, regional and freight train driving styles in a mixed-traffic railway. Paper presented at the RailNewcastle international conference, Newcastle upon Tyne, 15–17 July 2015

[44]

Rowe G (2009) Leaves, Adhesion and ATO. Paper presented at modern train braking—further development in stopping, Derby, 19 Nov 2009

[45]

Wales J, Marinov M. Analysis of delays and delay mitigation on a metropolitan rail network using event based simulation. Simul Model Pract Theory, 2015, 52: 52-77

[46]

Motraghi A, Marinov MV. Analysis of urban freight by rail using event based simulation. Simul Model Pract Theory, 2012, 25: 73-89

[47]

Landex A (2008) Methods to estimate railway capacity and passenger delays. Dissertation, Technical University of Denmark

[48]

UIC Capacity, 2004, Paris: UIC

[49]

Dicembre A, Ricci S. Railway traffic on high density urban corridors: capacity, signalling and timetable. J Rail Transp Plan Manag, 2011, 1(2): 59-68

[50]

Martínez I, Vitriano B, Fernández A, Cucala AP. Brebbia CA. Statistical dwell time model for metro lines. Urban transport XIII. Urban transport and the environment in the 21st century, 2007, Ashurst: Wessex Institute of Technology 223-232

[51]

Vollenwyder K (2002) Linear motor propulsion for urban transit. Paper presented at the 17th international conference on magnetically levitated systems and linear drives, Lausanne

[52]

Adhesion Working Group (2004) Managing low adhesion

[53]

Kessel C (2015) LU Northern line goes CBTC. Rail Engineer 127 (May):74–77

AI Summary AI Mindmap
PDF

776

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/