Evaluation on cutting performance of novel PDC cutter for pipe jacking machine

Long-Chuan Deng , Yi-Xiang Yuan , Xiao-Zhao Li , Qian-Wei Zhuang , Chi Zhang , Yi-Wei Chen

Underground Space ›› 2024, Vol. 14 ›› Issue (1) : 34 -52.

PDF (5804KB)
Underground Space ›› 2024, Vol. 14 ›› Issue (1) : 34 -52. DOI: 10.1016/j.undsp.2023.06.003

Evaluation on cutting performance of novel PDC cutter for pipe jacking machine

Author information +
History +
PDF (5804KB)

Abstract

It is inevitable to cut reinforced concrete (RC) appeared in cross passage of city metro by cutting tools when constructing in densely populated area. The previous cutters employed to cut RC are insufficient and easily damaged, so a new polycrystalline diamond compact (PDC) cutter is used to solve this question. Based on the theoretical analysis of cutting mechanism, both circular and tapered PDC cutters with cutting edge angle of 90° and negative front rack angle of 10° are used to cut RC. The peeling and breaking patterns of cutting concrete are proposed, the nodular and grainy chips are the preferred modes in cutting steel bars. The LS-DYNA is employed to investigate the cutting performance in advance. The simulation results show that the average and peak cutting forces increase with the growth of penetration depth, cutting speed, and roundness, and subsequently the recommended penetration depth less than 1.2 mm is obtained to cut RC due to the existence of steel bars. Moreover, the linear cutting platform is adopted to investigate the force ability and damage state of PDC cutters. It is concluded that the cutting force increases abruptly and fluctuates heavily when cutting the coarse aggregates. The patterns occurred in both numerical and experimental results are generally similar. Notably, the steel bar is pulled out and the PDC cutter is damaged at the penetration depth of 0.8 mm, while a good cut occurs at the penetration depth of 0.3 mm. The tapered PDC cutter with a relatively low cutting force is prone to be broken compared with circular PDC cutter. It is suggested that the circular PDC cutter at the penetration depth of 0.3 mm should be used to cut RC in practical engineering.

Keywords

PDC cutter / RC / Pipe jacking machine / Linear cutting tests / Damage and wear / LS-DYNA

Cite this article

Download citation ▾
Long-Chuan Deng, Yi-Xiang Yuan, Xiao-Zhao Li, Qian-Wei Zhuang, Chi Zhang, Yi-Wei Chen. Evaluation on cutting performance of novel PDC cutter for pipe jacking machine. Underground Space, 2024, 14(1): 34-52 DOI:10.1016/j.undsp.2023.06.003

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Alnuaim A., Abbas Y. M., & Khan M. I. (2021). Sustainable application of processed TBM excavated rock materialas green structural concrete aggregate. Construction and Building Materials, 274, 121245.

[2]

Abyaneh S. D., Wong H. S., & Buenfeld N. R. (2016). Simulating the effect of microcracks on the diffusivity and permeability of concrete using a three-dimensional model. Computational Materials Science, 119, 130-143.

[3]

Bai J. Z. (2005). In LS-DYNA3D theoretical basis and example analysis (pp. 102). Science Press.

[4]

Cai H. B., Liu Z., Li S., & Zheng T. L. (2019). Improved analytical prediction of ground frost heave during tunnel construction using artificial ground freezing technique. Tunnelling and Underground Space Technology, 92, 103050.

[5]

Chen P., Liu X. R., Deng Z. Y., Liang N. H., Du L. B., Du H.,... Yang G. Y. (2023). Study on the pipe friction resistance in long- distance rock pipe jacking engineering. Underground Space, 9, 173-185.

[6]

Conrads A., Scheffer M., Konig M., & Thewes M. (2018). Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects. Underground Space, 3, 72-85.

[7]

Ding L. Y., Zhou C., Deng Q. X., Luo H. B., Ye X. W., Ni Y. Q., & Guo P. (2013). Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things. Automation in Construction, 36, 25-37.

[8]

Deng L. C., Zhang C., Zhuang Q. W., Li X. Z., & Yuan Y. X. (2022a). Development and application of a full-scale mechanical rock-cutting platform for measuring the cutting performance of TBM cutter. Measurement, 204, 112036.

[9]

Deng L. C., Zhang F. B., Li X. Z., Zhang C., Ji Y. K., & Wu Y. (2022b). Experimental and numerical investigations on rock breaking of TBM disc cutter based on a novel platform with rotational cutting. Rock Mechanics and Rock Engineering, 56, 1415-1436.

[10]

Deng L. C., Li X. Z., Chen Y. W., Zhuang Q. W., Zhu L. H., & Zhang C. (2022c). Investigations on cutting force and temperature field of pick cutter based on single factor and orthogonal test methods. Rock Mechanics and Rock Engineering, 56, 619-645.

[11]

Deng L. C., Yuan Y. X., Zhuang Q. W., Li X. Z., Zhang C., & Li W. Y. (2022d). Novel PDC cutter for reinforced concrete based on linear and rotational cutting tests. Tunnelling and Underground Space Technology., 129, 104681.

[12]

Feng S., Li Y. F., Hou Y. S., Li J. M., & Huang Y. B. (2020). Study on the critical velocity for smoke control in a subway tunnel cross- passage. Tunnelling and Underground Space Technology, 97, 103234.

[13]

Huang K. L., Yang Y. X., Li G., Wang Y. T., Ren H. T., & Niu S. W. (2021). Torsion and vibration reduction mechanism of roller PDC hybrid bit. Journal of Petroleum Science and Engineering, 208, 109491.

[14]

Ishimura T., Metoki M., & Shimizu M. (2006). Development of removed pile method with cutting. Tunnelling and Underground Space Technology, 21(3-4), 411-412.

[15]

Iwasaki Y., Watanabe H., Fukuda M., Hirata A., & Hori Y. (1994). Construction control for underpinning piles and their behavior during excavation. Ge´otechnique, 44(4), 681-689.

[16]

Liu F., Han J. Q., Wang F., Wang Z. H., & Weng M. C. (2021). Experimental study on the temperature profiles in a naturally ventilated metro tunnel with a transverse cross-passage. Tunnelling and Underground Space Technology, 116, 104094.

[17]

Loganathan N., Poulos H. G., & Stewart D. P. (2000). Centrifuge model testing of tunnelling-induced ground and pile deformations. Ge´otechnique, 50(3), 283-294.

[18]

Liu C., Zhang Z., & Regueiro R. A. (2014). Pile and pile group response to tunnelling using a large diameter slurry shield - Case study in Shanghai. Computer and Geotechnics, 59, 21-43.

[19]

Liu C., Zhong M. H., Song S. Y., Xia F. Y., Tian X. L., Yang Y. X., & Long Z. (2020). Experimental and numerical study on critical ventilation velocity for confining fire smoke in metro connected tunnel. Tunnelling and Underground Space Technology, 97, 103296.

[20]

Jiang H., Zhu J. C., Zhang X. Y., Zhang J. X., Li H. L., & Meng L. F. (2022). Wear mechanism and life prediction of the ripper in a 9-m- diametershield machine tunneling project of the Beijing new airport line in a sand-pebble stratum. Deep Underground Science and Engineering, 1, 65-76.

[21]

Li X. G., Yuan D. J., Jiang X. Q., & Wang F. (2021). Damages and wear of tungsten carbide-tipped rippers of tunneling machines used to cutting large diameter reinforced concrete piles. Engineering Failure Analysis, 127, 105533.

[22]

Lu J. W., Gong Q. M., Yin L. J., & Zhou X. X. (2021). Study on the tunneling response of TBM in stressed granite rock mass in Yinhan Water Conveyance tunnel. Tunnelling and Underground Space Technology, 118, 104197.

[23]

Marshall A. M., & Haji T. (2015). An analytical study of tunnelpile interaction. Tunnelling and Underground Space Technology, 45, 43-51.

[24]

Mukhopadhyay D. (2021). Identifying the causes of residual stress in polycrystalline diamond compact (PDC) cutters by X-Ray diffraction technique. Results in Materials, 11, 100216.

[25]

Mazen A. Z., Rahmanian N., Mujtaba I. M., & Hassanpour A. (2021). Effective mechanical specific energy: A new approach for evaluating PDC bit performance and cutters wear. Journal of Petroleum Science and Engineering, 196, 108030.

[26]

Mazen A. Z., Rahmanian N., Mujtaba I. M., & Hassanpour A. (2020). Prediction of penetration rate for PDC bits using indices of rock drillability, cutting removal, and bit wear. SPE Drilling and Completion, SPE-204231-PA.

[27]

Raymond L. S. (2020). Developments and research directions in pipe jacking and microtunneling. Underground Space, 5, 1-19.

[28]

Song H. Q., Cai H. B., Yao Z. S., Rong C. X., & Wang X. J. (2016). Finite element analysis on 3D freezing temperature field in metro cross passage construction. Procedia Engineering, 165, 528-539.

[29]

She L., Zhang S. R., He S. W., Wang C., Li L., Jing Y., & Liu Y. (2021). Investigation on wear prediction model of TBM disc cutter based on dense core theory. Chinese Journal of Geotechnical Engineering (in Chinese).

[30]

Tian H. P., Ren H. T., Song D. D., & Yang Y. (2021). Research on cutting track and working load of directional drilling PDC bit. Journal of Petroleum Science and Engineering, 208, 109480.

[31]

Wang F., Yuan D. J., Cai R., Mu Y., & Wang M. (2013). Field test study on cutting obstacle piles directly by shield cutters. Applied Mechanics and Materials, 353-356, 1433-1439.

[32]

Wang W. Z., Yang J., Xu G. J., & Liu Y. K. (2021). Determination and evaluation of Holmquist-Johnson-Cook constitutive model parameters for ultra-high-performance concrete with steel fibers. International Journal of Impact Engineering, 156, 103966.

[33]

Wu Z. J., Wei R. L., Chu Z. F., & Liu Q. S. (2021). Real-time rock mass condition prediction with TBM tunneling big data using a novel rock- machine mutual feedback perception method. Journal of Rock Mechanics and Geotechnical Engineering.

[34]

Xiao H. H., Yang W. K., Hu J., Zhang Y. P., Jing L. J., & Chen Z. Y. (2022). Significance and methodology: Preprocessing the big data for machine learning on TBM performance. Underground Space, 7, 680-701.

[35]

Yuan D. J., & Wang F. (2017). Theory and practice of cutting large diameter reinforced concrete cluster piles by shield machine. Science Press (in Chinese).

[36]

Yuan D. J., Wang F., Dong C., Han B., & Wang M. (2016). Study on new-style cutter for shield cutting large-diameter reinforced concrete pile. China Journal of Highway and Transport, 29(3), 89-97 (in Chinese).

[37]

Zhou J., Zhao W. Q., & Tang Y. Q. (2021). Practical prediction method on frost heave of soft clay in artificial ground freezing with field experiment. Tunnelling and Underground Space Technology, 107, 103647.

[38]

Zhang J. C., Yan Q. X., Sun M. H., Li B. J., Chen W. Y., & Chen H. (2021). Experimental study on the vibration damping of two parallel shield tunnels connected by an assembled transverse passage. Tunnelling and Underground Space Technology, 107, 103659.

[39]

Zhang Z. Q., & He C. (2005). Study on construction of cross connection of shield tunnel and connection aisle by freezing method. Chinese Journal of Rock Mechanics and Engineering, 24(18), 3211-3217 (in Chinese).

[40]

Zhu H. Y., Shen J. D., & Zhang F. S. (2019). A fracture conductivity model for channel fracturing and its implementation with Discrete Element Method. Journal of Petroleum Science and Engineering, 172, 149-161.

AI Summary AI Mindmap
PDF (5804KB)

586

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/