Normalized Source-Storage-Load Flexibility-Loss Indicators for Day-Ahead Scheduling of Renewable Virtual Power Plants

Lai Jiang , Yufeng Guo , Rui Bao , Qi Wang , Wei Xu , Yihang Ouyang , Yuxin Jiang , Lichaozheng Qin

Smart Energy Syst. Res. ›› 2026, Vol. 2 ›› Issue (3) : 10010

PDF (975KB)
Smart Energy Syst. Res. ›› 2026, Vol. 2 ›› Issue (3) :10010 DOI: 10.70322/sesr.2026.10010
Article
research-article
Normalized Source-Storage-Load Flexibility-Loss Indicators for Day-Ahead Scheduling of Renewable Virtual Power Plants
Author information +
History +
PDF (975KB)

Abstract

Renewable virtual power plants (VPPs) require day-ahead schedules that coordinate renewable generation, storage, gas turbines, and demand-side flexibility while retaining interpretable operating signals. This paper develops a normalized source-storage-load flexibility-loss-indicator (FLI) framework for renewable VPP scheduling. The indicators are engineering proxies for renewable-curtailment value loss, storage availability loss, and interruptible-load activation burden, rather than market-settled opportunity costs or a complete uncertainty-risk measure. The scalar objective combines net operating cost, operating coordination cost, and normalized FLI terms with reference scales fixed within each comparative setting. In a PJM-scaled day-ahead scheduling case, the baseline, scalarized multi-term reference, and proposed FLI schedules achieved net operating profits of 69,590.98 USD, 60,377.26 USD, and 66,856.81 USD. The proposed schedule reduced SOC boundary contacts from 9 to 3 and equivalent full cycles from 1.7253 to 1.6647, with a 3.93% profit concession relative to the baseline. Weight sensitivity, channel ablation, and eight representative operating and stress-test scenarios show state-dependent effects: the storage channel was active in seven scenarios, the interruptible-load channel under peak and flexibility-stressed conditions, and the renewable channel remained weak because curtailment was nearly zero. The framework provides a diagnostic coordination signal for renewable VPP operation.

Keywords

Virtual power plant / Renewable energy integration / Energy storage system / Demand-side flexibility / Flexibility-loss indicator / Coordinated scheduling

Cite this article

Download citation ▾
Lai Jiang, Yufeng Guo, Rui Bao, Qi Wang, Wei Xu, Yihang Ouyang, Yuxin Jiang, Lichaozheng Qin. Normalized Source-Storage-Load Flexibility-Loss Indicators for Day-Ahead Scheduling of Renewable Virtual Power Plants. Smart Energy Syst. Res., 2026, 2 (3) : 10010 DOI:10.70322/sesr.2026.10010

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Zhu J, Gao M, Xiao P, Dong H, Zhu H, Lin K . Review of offshore wind power grid integration and operation in new energy systems. Smart Energy Syst. Res. 2026, 2, 10002. DOI: 10.70322/sesr.2026.10002

[2]

Zhang S, Lu Y, Huang Q, Liu M . Hybrid encoder-decoder model for ultra-short-term prediction of wind farm power. Smart Energy Syst. Res. 2025, 1, 10004. DOI: 10.70322/sesr.2025.10004

[3]

Nassreddine G, Hellany A, Al-Khatib O, Rammal A, Nassereddine M. Feature selection technique using multiple linear regression for accurate electricity demand forecasting. Smart Energy Syst. Res. 2025, 1, 10003. DOI: 10.70322/sesr.2025.10003

[4]

Shafiekhani M, Ahmadi A, Homaee O, Shafie-khah M, Catalao JPS . Optimal bidding strategy of a renewable-based virtual power plant including wind and solar units and dispatchable loads. Energy 2022, 239, 122379. DOI: 10.1016/j.energy.2021.122379

[5]

Shui J, Peng D, Zeng H, Song Y, Yu Z, Yuan X, et al. Optimal scheduling of multiple entities in virtual power plant based on the master-slave game. Appl. Energy 2024, 376, 124286. DOI: 10.1016/j.apenergy.2024.124286

[6]

Fang F, Yu S, Xin X. Data-driven-based stochastic robust optimization for a virtual power plant with multiple uncertainties. IEEE Trans. Power Syst. 2022, 37, 456-466. DOI: 10.1109/TPWRS.2021.3091879

[7]

Naughton J, Wang H, Cantoni M, Mancarella P . Co-optimizing virtual power plant services under uncertainty: A robust scheduling and receding horizon dispatch approach. IEEE Trans. Power Syst. 2021, 36, 3960-3972. DOI: 10.1109/TPWRS.2021.3062582

[8]

Zhang Y, Liu F, Wang Z, Su Y, Wang W, Feng S. Robust scheduling of virtual power plant under exogenous and endogenous uncertainties. IEEE Trans. Power Syst. 2022, 37, 1311-1325. DOI: 10.1109/TPWRS.2021.3105418

[9]

Li Z, Hilber P, Li Z, Laneryd T, Ivanell S . Temporally coordinated operation of green multi-energy airport microgrids with climatic correlations and flexible loads via decomposed stochastic programming. IEEE Trans. Sustain. Energy 2026, 17, 1909-1922. DOI: 10.1109/TSTE.2025.3639360

[10]

Zeng X, Zheng X, Chen H, Yin X, Li Z, Chen Y . Deriving the robust operating region for multistage dispatch of power systems: A decision-dependent uncertainties based modeling approach. IEEE Trans. Sustain. Energy 2026, 17, 3019-3032. DOI: 10.1109/TSTE.2026.3663924

[11]

Xiao D, Lin Z, Chen H, Hua W, Yan J . Windfall profit-aware stochastic scheduling strategy for industrial virtual power plant with integrated risk-seeking/averse preferences. Appl. Energy 2024, 357, 122460. DOI: 10.1016/j.apenergy.2023.122460

[12]

Ma Y, Li Z, Liu R, Liu B, Yu SS, Liao X, et al. Data-driven interval robust optimization method of VPP bidding strategy in spot market under multiple uncertainties. Appl. Energy 2025, 384, 125366. DOI: 10.1016/j.apenergy.2025.125366

[13]

She B, Xiao JW, Wang YW, He SY . Decision-driven uncertainty management in multi-energy virtual power plant: A robust multi-market scheduling framework. J. Clean. Prod. 2025, 527, 146688. DOI: 10.1016/j.jclepro.2025.146688

[14]

Zhou Y, Essayeh C, Morstyn T . A novel surrogate polytope method for day-ahead virtual power plant scheduling with joint probabilistic constraints. Electr. Power Syst. Res. 2024, 234, 110623. DOI: 10.1016/j.epsr.2024.110623

[15]

Wei X, Xu Y, Sun H, Bai X, Chang X, Xue Y . Day-ahead optimal dispatch of a virtual power plant in the joint energy-reserve-carbon market. Appl. Energy 2024, 356, 122459. DOI: 10.1016/j.apenergy.2023.122459

[16]

Chen Y, Niu Y, Qu C, Du M, Liu P . A pricing strategy based on bi-level stochastic optimization for virtual power plant trading in multi-market: Energy, ancillary services and carbon trading market. Electr. Power Syst. Res. 2024, 231, 110371. DOI: 10.1016/j.epsr.2024.110371

[17]

Pandey AK, Jadoun VK, Jayalakshmi NS, Malik H, Garcia Marquez FP . Multi-objective price based flexible reserve scheduling of virtual power plant. Renew. Sustain. Energy Rev. 2024, 192, 114218. DOI: 10.1016/j.rser.2023.114218

[18]

Nguyen Hong N, Nguyen Duc H . Virtual power plant’s optimal scheduling strategy in day-ahead and balancing markets considering reserve provision model of energy storage system. Appl. Sci. 2024, 14, 2175. DOI: 10.3390/app14052175

[19]

Feng C, Huang Z, Lin J, Wang L, Zhang Y, Wen F . Aggregation model and market mechanism for virtual power plant participation in inertia and primary frequency response. IEEE Trans. Power Syst. 2026, 41, 2101-2117. DOI: 10.1109/TPWRS.2025.3637538

[20]

Qin W, Li X, Jing X, Zhu Z, Lu R, Han X . Multi-temporal optimization of virtual power plant in energy-frequency regulation market under uncertainties. J. Mod. Power Syst. Clean Energy 2025, 13, 675-687. DOI: 10.35833/MPCE.2024.000118

[21]

Lu X, Qiu J, Zhang C, Lei G, Zhu J . Assembly and competition for virtual power plants with multiple ESPs through a recruitment-participation approach. IEEE Trans. Power Syst. 2024, 39, 4382-4396. DOI: 10.1109/TPWRS.2023.3296738

[22]

Shang Y, Li X, Xu T, Cui L . Uncertainty-output virtual power plant participates in multi-electricity market considering the improved Shapley value distribution method. Int. J. Electr. Power Energy Syst. 2025, 165, 110462. DOI: 10.1016/j.ijepes.2025.110462

[23]

Schiro DA, Zheng T, Zhao F, Litvinov E . Convex hull pricing in electricity markets: Formulation, analysis, and implementation challenges. IEEE Trans. Power Syst. 2016, 31, 4068-4075. DOI: 10.1109/TPWRS.2015.2486380

[24]

Harsh P, Sun H, Das D, Rameshrao AG, Jiang J . Stochastic incentive-based demand response program for virtual power plant with distributed energy resources. IEEE Trans. Ind. Appl. 2025, 61, 4862-4875. DOI: 10.1109/TIA.2025.3535847

[25]

Zhou K, Peng N, Yin H, Hu R . Urban virtual power plant operation optimization with incentive-based demand response. Energy 2023, 282, 128700. DOI: 10.1016/j.energy.2023.128700

[26]

Ryu J, Kim J . Virtual power plant operation strategy under uncertainty with demand response resources in electricity markets. IEEE Access 2022, 10, 62763-62771. DOI: 10.1109/ACCESS.2022.3181163

[27]

Wu JK, Liu ZW, Li C, Zhao Y, Chi M . Coordinated operation strategy of virtual power plant based on two-layer game approach. IEEE Trans. Smart Grid 2025, 16, 554-567. DOI: 10.1109/TSG.2024.3440315

[28]

Yi Z, Xu Y, Wang H, Sang L . Coordinated operation strategy for a virtual power plant with multiple DER aggregators. IEEE Trans. Sustain. Energy 2021, 12, 2445-2458. DOI: 10.1109/TSTE.2021.3100088

[29]

Ren J, Zeng Y, Qin C, Li B, Wang Z, Yuan Q, et al. Characterization and application of flexible operation region of virtual power plant. Appl. Energy 2024, 371, 123733. DOI: 10.1016/j.apenergy.2024.123733

[30]

Finke J, Bertsch V . Implementing a highly adaptable method for the multi-objective optimisation of energy systems. Appl. Energy 2023, 332, 120521. DOI: 10.1016/j.apenergy.2022.120521

[31]

Li Q, Zhou Y, Wei F, Li S, Wang Z, Li J, et al. Multi-time scale scheduling for virtual power plants: Integrating the flexibility of power generation and multi-user loads while considering the capacity degradation of energy storage systems. Appl. Energy 2024, 362, 122980. DOI: 10.1016/j.apenergy.2024.122980

[32]

Yan X, Gao C, Francois B . Multi-objective optimization of a virtual power plant with mobile energy storage for a multi-stakeholders energy community. Appl. Energy 2025, 386, 125553. DOI: 10.1016/j.apenergy.2025.125553

[33]

Ghanuni A, Sharifi R, Farahani HF . A risk-based multi-objective energy scheduling and bidding strategy for a technical virtual power plant. Electr. Power Syst. Res. 2023, 220, 109344. DOI: 10.1016/j.epsr.2023.109344

PDF (975KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉