Optimization of integrated resource utilization in railway hubs with mixed high-speed and conventional operations at shared stations

Sitong Xiang , Feng Lin , Zhigang Le , Datong Song , Ershuai Nie

Railway Sciences ›› 2026, Vol. 5 ›› Issue (4) : 489 -504.

PDF (2584KB)
Railway Sciences ›› 2026, Vol. 5 ›› Issue (4) :489 -504. DOI: 10.1108/RS-01-2026-0003
Research article
research-article
Optimization of integrated resource utilization in railway hubs with mixed high-speed and conventional operations at shared stations
Author information +
History +
PDF (2584KB)

Abstract

Purpose-With the continuous expansion of railway hubs, increasing functional complexity and growing capacity constraints, the coordinated and efficient utilization of transportation resources-such as stations, lines and maintenance facilities-has become a critical issue for improving hub operational efficiency. This study focuses on the division of functions within railway hubs that incorporate shared stations operating under mixed high-speed and conventional train services.

Design/methodology/approach-An optimization model for hub functional allocation is developed to achieve efficient resource utilization in hubs containing mixed-operation stations. A node–arc network representation combined with an improved multi-commodity flow model is employed, taking train dwell and operation time within the hub as the optimization objective. A case study is conducted to derive optimized solutions, followed by both qualitative and quantitative analyses.

Findings-The results indicate that optimizing train operation routes and station assignments within the hub can effectively reduce the total occupation time of train flows and significantly improve resource utilization efficiency.

Originality/value-The proposed model demonstrates both scientific rigor and practical effectiveness. In real-world operations, it can provide operators with preliminary and proactive functional allocation schemes, help identify key constraints limiting hub capacity utilization and offer decision support for transport plan adjustments or infrastructure and facility upgrades.

Keywords

Mixed high-speed and conventional operations / Railway hub / Hub functional allocation / Route optimization / ILOG CPLEX

Cite this article

Download citation ▾
Sitong Xiang, Feng Lin, Zhigang Le, Datong Song, Ershuai Nie. Optimization of integrated resource utilization in railway hubs with mixed high-speed and conventional operations at shared stations. Railway Sciences, 2026, 5 (4) : 489-504 DOI:10.1108/RS-01-2026-0003

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Bi, M., He, S., Li, T., & Li, H. (2016). Optimization of train blockings and shunting lines in a railway marshalling yard. Journal of Transportation Systems Engineering and Information Technology, 16(05), 123-128. doi: 10.16097/j.cnki.1009-6744.2016.05.019.

[2]

Bi, M., He, S., Yin, W., Li, Z., & An, J. (2018). Research on resource and capacity utilization of high-speed railway hub. Journal of the China Railway Society, 40(06), 11-20.

[3]

Borndörfer, R., Klug, T., Lamorgese, L., Mannino, C., Reuther, M., & Schlechte, T. (2017). Recent success stories on integrated optimization of railway systems. Transportation Research Part C: Emerging Technologies, 74, 196-211. doi: 10.1016/j.trc.2016.11.015.

[4]

Gong, X., Guo, X., & Jiang, X. (2012). Access road planning and traffic operation for high-speed railway hub. In CICTP 2012: Multimodal Transportation Systems-Convenient, Safe, Cost-Effective, Efficient (pp. 191-199).

[5]

Ji, L., Lin, B., Qiao, G., & Wang, J. (2011). Car flow assignment and routing optimization model of railway network based on multi-commodity flow model. China Railway Science, 32(3), 107-110.

[6]

Kou, J. (2024). Research on southwest passenger capacity and gap solutions in Puxi area of Shanghai railway terminal. Railway Construction Technology, 12, 80-83+ 92.

[7]

Leng, Y., He, S., Zhang, J., Liu, J., & Liu, J. (2024). Labor division and resource utilization in high-speed railway hub considering passenger preference. China Transportation Review, 46(01), 92-99+133. doi: 10.20164/j.cnki.cn11-1197/u.2024.01.016.

[8]

Liu, Y., He, S. W., & Bi, M. K. (2018). Research on allocation of passenger station and capacity flexibility of high-speed railway hub. Journal of Dalian Jiaotong University, 6, 13-18.

[9]

Luo, X. (n.d.). Optimization software and applications[EB/OL]. Available from: http://wenkubaidu.com/view/f3954605b52acfc789ebc95dhtml

[10]

Mao, W. (2021). Research on optimization of work division of high-speed railway hub stations considering the use of stock and the overhaul of EMUs. (Master’s thesis, Beijing Jiaotong University). doi: 10.26944/d.cnki.gbfju.2021.001664.

[11]

Martinelli, D. R., & Teng, H. (1996). Optimization of railway operations using neural networks. Transportation Research Part C: Emerging Technologies, 4(1), 33-49. doi: 10.1016/0968-090x(95)00019-f.

[12]

Nold, M. (2025). System analysis of technological and operational improvements for the future railway system (Doctoral dissertation, ETH Zurich).

[13]

Wang, Y. (2022). Research on optimization of division of labor scheme in high-speed railway hub considering track allocation in passenger stations. (Doctoral dissertation, Beijing Jiaotong University). doi: 10.26944/d.cnki.gbfju.2022.000154.

[14]

Yusuf, H., Olamide, J., & David, S. (2024). Digitalization and smart infrastructure for high-speed rail.

[15]

Zhang, J., He, S., Zhao, R., Chen, M., & Liu, J. (2024). Study on comprehensive utilization of high-speed railway hub stations. Shandong Science, 37(4), 121-130.

[16]

Zhou, K., He, S. W., Song, R., & Li, H. D. (2015). Decision scheme optimization for empty pallets dispatching based on pallet pool mode. Control and Decision, 30(11), 2009-2013.

PDF (2584KB)

4

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉