Structural Design of a Novel Longitudinally Split Precast Segmental Cap Beam

Zhen Wang

Prestress Technology ›› 2026, Vol. 4 ›› Issue (3) : 21 -32.

PDF (1402KB)
Prestress Technology ›› 2026, Vol. 4 ›› Issue (3) :21 -32. DOI: 10.59238/j.pt.20260422001
Scientific Research
research-article
Structural Design of a Novel Longitudinally Split Precast Segmental Cap Beam
Author information +
History +
PDF (1402KB)

Abstract

Based on an expressway project in Shanghai, the structural behavior, construction procedure, and engineering applicability of a novel longitudinally split precast segmental cap beam were investigated. The proposed cap beam is divided longitudinally into two precast segments for lifting and erection. After erection, the segments are connected by a cast-in-place wet joint placed on a specially designed bottom formwork, while the cap beam is connected to the columns through grouted sleeve connections. For the two-column portal-frame cap beam commonly used in urban viaducts, two tendon-layout schemes were developed. In Scheme 1, all the prestressing tendons are arranged within the precast segments; the wet joint is 500 mm wide, and the single-lift weight is 143 t. In Scheme 2, some of the prestressing tendons are arranged within the wet joint; the joint width is 700 mm, and the single-lift weight is 126 t, approximately 12% lower than that of Scheme 1. The results show that the wet-joint width is strongly coupled with the single-lift weight, available construction space, and tendon arrangement and is therefore a key parameter governing the applicability of the system. Compared with the conventional transversely segmented precast cap beam, the proposed longitudinally split scheme increases tendon consumption by approximately 20% and requires more cast-in-place work but reduces the single-lift weight by approximately 30% and eliminates temporary support and traffic diversion, minimizing disruption to under-bridge traffic. The proposed system therefore demonstrates good engineering applicability and provides technical support for the prefabricated and rapid construction of urban viaducts.

Keywords

longitudinally split precast cap beam / two-column portal-frame cap beam / engineering applicability / urban viaduct

Cite this article

Download citation ▾
Zhen Wang. Structural Design of a Novel Longitudinally Split Precast Segmental Cap Beam. Prestress Technology, 2026, 4 (3) : 21-32 DOI:10.59238/j.pt.20260422001

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Lu, Y.; Chen, M.; Wang, G. Technology and Practice of Prefabricated Highway Bridge. In Proceedings of the The 26th East China Civil Engineering and Construction Technology Conference, Hangzhou, 2020; pp. 709-713.(in Chinese)

[2]

Sha, L.; Li, G. Research on Key Technologies of Inverted T Pier Cap Prefabricated Design of Typical Urban Viaduct. China Municipal Engineering 2017, 16-19, doi: 10.3969/j.issn.1004-4655.2017.03.005.(in Chinese)

[3]

Xu, Y.; Li, J. Applications of Quick Construction Steel Cover Beam Scheme in Beijing New Airport Expressway Project. Special Structures 2019, 36, 77-82, doi: 10.19786/j.tzjg.2019.04.014.(in Chinese)

[4]

Li, L.; Ye, M.; Hu, F.; Liao, R.; Tang, J.; Shao, X. Experimental study on the flexural behavior of a prefabricated large-cantilevered prestressed UHPC thin-walled bent cap. China Civil Engineering Journal 2020, 53, 92-104.(in Chinese)

[5]

Li, L.; Tang, J.; Hu, F.; Liao, R.; Ye, M.; Shao, X. Experimental on Shear Behavior of Prefabricated Light Weight Thin-walled UHPC Bent Cap. China Journal of Highway and Transport 2020, 33, 144-158.(in Chinese)

[6]

Ye, M.; Yao, Z. Experimental Study on Shear Behavior of Prestressed UHPC-T Beam. Highway Engineering 2021, 46, 84-90,109, doi: 10.19782/j.cnki.1674-0610.2021.04.012.(in Chinese)

[7]

Ye, M.; Li, L.; Hu, F.; Shao, X.; Tang, J. Flexural Behavior of a Fully Prefabricated Lightweight UHPC Bent Cap. Journal of Bridge Engineering 2020, 25, 4020085.4020081-4020085.4020012, doi: 10.1061/(asce)be.1943-5592.0001605.

[8]

Wu, X.; HU, F.; Liu, Z. Construction Technology Research on Prefabricated Bridge Bent Cap Made with Ultra High Performance Concrete(UHPC). Journal of China & Foreign Highway 2022, 42, 138-141, doi: 10.14048/j.issn.1671-2579.2022.02.024.(in Chinese)

[9]

Li, J.; Xia, Z.; Sun, M.; Xia, J. Experimental Study on Mechanical Performance of UHPC Formwork-RC Composite Cap Beam. China Journal of Highway and Transport 2021, 34, 157-167, doi: 10.3969/j.issn.1001-7372.2021.08.014.(in Chinese)

[10]

Zhou, Q.; Li, Y.; Liu, S.; Liu, Y. Shear Mechanism of a Novel Precast Composite Pier Cap. Progress in Steel Building Structures 2022, 24, 7-14, doi: 10.13969/j.cnki.cn31-1893.2022.04.002.(in Chinese)

[11]

Zuo, W.; Li, C.; Sun, Z.; Xiao, Z.; Lin, Z.; Huang, X. Experiment on Static Behavior of Segmental Precast PC Cap Beam. Journal of Tongji University(Natural Science) 2022, 50, 1752-1760, doi: 10.11908/j.issn.0253-374x.21376.(in Chinese)

[12]

Yuan, H. Prefabrication and Assembly Design of Bridges in the Middle Section Project of Lianggang Avenue. Urban Roads Bridges & Flood Control 2021, 86-89, doi: 10.16799/j.cnki.csdqyfh.2021.11.023.(in Chinese)

[13]

Zhang, J. Construction Application of Dry-Jointed Precast Cap-Beam Assembly Technology. Urban Roads Bridges & Flood Control 2022, 160-162, doi: 10.16799/j.cnki.csdqyfh.2022.02.046.(in Chinese)

[14]

Huang, B.; Huang, Y.; Zhang, S. Research on Shear Performance of Dry Joint in Precast Inverted T-Type Pier Cap. Journal of China & Foreign Highway 2021, 41, 215-220, doi: 10.14048/j.issn.1671-2579.2021.04.043.(in Chinese)

[15]

Xia, Y.; Yu, X.; Chen, G. Design and Key Technology Study of Super Large Prefabricated Assembly Cap Beam. Highway 2022, 67, 156-159,(in Chinese)

[16]

Wu, Z. Jingyu Qiao. Mechanical Performance of Novel Split Precast Cap Beams. Prestress Technology 2025, 3, 1-15, doi: 10.59238/j.pt.2025.02.001.

[17]

Dong, X.; Li, G.; Yi, d.; Chen, X.; Wang, J.; Li, X. Strength Calculation Method of U-Shaped Reinforcement Joint Based on Shear Friction Theory. China Municipal Engineering 2019, 84-88+142.(in Chinese)

[18]

Shen, W.; Lu, Y. Prefabricated Bridge Technology for the Guoding East Road Off-Ramp of the Shanghai Middle Ring Road. Urban Roads Bridges & Flood Control 2017, 68-73, doi: 10.16799/j.cnki.csdqyfh.2017.09.020.(in Chinese)

PDF (1402KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉