New Durability Assurance Technologies for the Shenzhen-Zhongshan Cross-Sea Bridge

Huanyong Chen , Di Wang

Prestress Technology ›› 2025, Vol. 3 ›› Issue (1) : 35 -47.

PDF (2516KB)
Prestress Technology ›› 2025, Vol. 3 ›› Issue (1) : 35 -47. DOI: 10.59238/j.pt.2025.01.003
Product Research and Development
research-article

New Durability Assurance Technologies for the Shenzhen-Zhongshan Cross-Sea Bridge

Author information +
History +
PDF (2516KB)

Abstract

The Shenzhen-Zhongshan Link (Shenzhong Link) is the world's first integrated cross-sea cluster project featuring a "bridge-island-tunnel-undersea interchange", and it is a key national project. The main structures include a 17-kilometer-long sea-crossing bridge and a 6.8-kilometer-long submarine tunnel. The project officially opened to traffic on June 30, 2024, with an average daily traffic volume of approximately 90,000 vehicles. Owing to the alternating loads from vehicles as well as wind, waves, and currents, fatigue issues are prominent. Moreover, the structures are exposed long-term to a marine environment characterized by high temperature, high humidity, and high salinity (fog), leading to severe corrosion problems. Considering that both corrosion and fatigue, as well as their coupled effects, significantly impact structural durability, this paper conducts research on key technologies for ensuring the durability of the Shenzhen-Zhongshan Cross-Sea Bridge, with a particular focus on marine concrete, steel beams, and main cables.

Keywords

Shenzhen-Zhongshan Link / cross-sea bridge / durability / marine concrete / steel beams / main cables

Cite this article

Download citation ▾
Huanyong Chen, Di Wang. New Durability Assurance Technologies for the Shenzhen-Zhongshan Cross-Sea Bridge. Prestress Technology, 2025, 3(1): 35-47 DOI:10.59238/j.pt.2025.01.003

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Song, S.S.; Chen, W.; Jin, W.; Xia, F.; Fu, B. Key Technologies and Challenges of Shenzhong Link. Tunnel Construction 2020, 40,143-152, doi:10.3973/j.issn.2096-4498.2020.01.019.

[2]

Chen, H.; Song, S.; Zhang, H.; Huang, D. Key Manufacturing Technology of 2060 MPa Zn-Al-Mg Alloy Coated Steel Wire Strands Utilized in Lingdingyang Bridge. Bridge Construction 2022, 52,21-27, doi:10.3969/j.issn.1003-4722.2022.05.004.

[3]

Wang, K.; Su, Z.; Song, S.; Liu, J.; Xiong, J. Shrinkage Crack Control and Durability Guarantee Technologies for Mass Concrete In Marine Environment, 1 ed.; China Communication Press Co., Ltd.: 2023.

[4]

Chen, H.; Xu, J.; Li, P.; Zhang, X. Optimization of Main Cable Dehumidification and Corrosion Resistance of Ling-dingyang Bridge of Shenzhen-Zhongshan Link. Bridge Construction 2023, 53,1-7, doi:10.20051/j.issn.1003-4722.2023.04.001.

AI Summary AI Mindmap
PDF (2516KB)

119

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/