Abstract

The core goal of the prefabricated construction of urban prestressed concrete bridges is to improve structural performance and construction efficiency. To improve the construction convenience and load-bearing performance of the connection between precast columns and pile caps, a novel connection structure for upper-anchored grouted corrugated ducts is proposed in this study. By comparing the pushover damage process of the integral casting column, the column connected by the grouting sleeve and the column connected by the upper-anchored grouted corrugated duct, the effects of the column height and the axial compression ratio on the performance of the column connected by the grouted corrugated duct were analyzed. Research results indicate that columns with upper-anchored grouted corrugated ducts exhibit superior static performance and ductility, with horizontal load-carrying capacities 23% greater than those of integrally cast columns and ductility performances 98% greater than those of integrally cast columns. Additionally, the primary concrete damage areas of these structures are farther from the bottom joint interface, featuring a wider distribution range of damaged areas and higher plastic hinge heights. When designing connections for columns with upper-anchored grouted corrugated ducts, controlling the elastic curvature ratio at section locations (sections with enlarged dimensions and sections at the base of columns) to be no less than 1.8 is recommended.

Keywords

precast columns / upper-anchored grouted corrugated duct connection method / pushover analysis

Cite this article

Download citation ▾
Jie Zhang, Chenxi Fu, Yuanhong Fu, Siyuan Li. Performance of Column with Upper-Anchored Grouted Corrugated Duct Connections Under Load. Prestress Technology, 2025, 3(1): 1-13 DOI:10.59238/j.pt.2025.01.001

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Tazarv, M.; Shrestha, G.; Saiidi, M.S. State-of-the-Art Review and Design of Grouted Duct Connections for Precast Bridge Columns. Structures 2021, 30,895-909, doi:10.1016/j.istruc.2020.12.091.

[2]

Wang, J.Q.; Shen, Y.; Li, G.P.; Chen, M.; Fan, C.X. Quasi-Full-Scale Experimental Study on Bridge Precast Concrete Columns under Static Loading. J Bridge Eng 2021, 26,doi:10.1061/(Asce)Be.1943-5592.0001725.

[3]

GE, J.; YAN, X.; WANG, Z. Seismic Performance of Prefabricated Assembled Pier with Grouted Sleeve and Prestressed Reinforcements. Journal of Traffic and Transportation Engineering 2018, 18,42-52, doi:10.3969/j.issn.1671-1637.2018.02.005.

[4]

Haber, Z.B.; Saiidi, M.S.; Sanders, D.H. Seismic Performance of Precast Columns with Mechanically Spliced Column-Footing Connections. Aci Struct J 2014, 111,639-650.

[5]

Tazarv, M.; Saiidi, M.S. Low-Damage Precast Columns for Accelerated Bridge Construction in High Seismic Zones. J Bridge Eng 2016, 21,doi:10.1061/(Asce)Be.1943-5592.0000806.

[6]

K., P.J.B.; P., S.K.; L., C.; etc. Rapidly Constructible Large-Bar Precast Bridge-Bent Seismic Connection; University of Washington: Seattle, America, 2008.

[7]

Restrepo, J.I.; Tobolski, M.J.; Matsumoto, E.E. Development of a Precast Bent Cap System for Seismic Regions. NCHRP Report 2011, doi:10.17226/14484.

[8]

Jiang, H.; Wang, Z.; Shen, J. Anti-seismic Performance Testing of Prefabricate Assembly Pillars Connected with Grouting Metal Corrugated Pipe. Structural Engineers 2016, 32,132-138.

[9]

Wang, Z.; Wei, Z.; Wei, H.; Wang, H. Influences of Precast Segmental Connector Forms on Seismic Performance of Bridge Pier. China Journal of Highway and Transport 2017, 30,74-80, doi:10.3969/j.issn.1006-3897.2017.05.010.

[10]

Jia, J.; Guo, Y.; Song, N.; Zhu, Y.; Du, X.; Geng, L. Seismic Testing of Precast RC Bridge Pier Columns Anchored by Grouted Corrugated Ducts. China Journal of Highway and Transport 2018, 31,211-220, doi:10.3969/j.issn.1001-7372.2018.12.021.

[11]

Saiidi, M.S.; Mehraein, M.; Shrestha, G.; Jordan, E.; Itani, A. Proposed AASHTO Seismic Specifications for ABC Column Connections; Transportation Research Board: Washington, 2020.