Construction Technology and Application of Bonded Prestressed Tendons in Wind Turbine Mixed Towers
Heming Zhang , Bin Wei
Prestress Technology ›› 2024, Vol. 2 ›› Issue (2) : 70 -80.
Construction Technology and Application of Bonded Prestressed Tendons in Wind Turbine Mixed Towers
The post-tensioned bonded prestressing technology has been widely applied in wind power support structures due to its safety, reliability, economic efficiency, and durability. This paper provides a comprehensive introduction and explanation of the construction technology of post-tensioned bonded prestressed tendons based on an actual engineering case. Starting from key procedures such as construction preparation, tendon cutting and fabrication, placement of duct, tendon threading, tensioning and anchoring, and grouting and sealing, this paper details the critical points and precautions based on practical engineering experience. This work can serve as a reference for similar projects, aiming to promote the application and adoption of post-tensioned bonded prestressing technology in the wind power industry.
wind turbine tower / post-tensioned bonded prestressing / construction technology
| [1] |
Ministry of Housing and Urban-Rural Development of the People's Republic of China. GB 50666—2011 Code for Construction of Concrete Structures. China Architecture Publishing & Media Co., Ltd.: Beijing, 2011. |
| [2] |
China Association for Engineering Construction Standardization. CECS 180: 2005 Specification for Prestressed Construction of Building Engineering. 2005. |
| [3] |
Ministry of Transport of the People's Republic of China. JTG 3650—2020 Technical Specifications for Construction of Highway Bridges and Culverts. China Communications Press: Beijing, 2020. |
| [4] |
Ministry of Transport of the People's Republic of China. JTG 3362—2018 Specifications for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts. China Communications Press: Beijing, 2018. |
/
| 〈 |
|
〉 |