Study on the Tensioning Scheme for Construction Monitoring of Asymmetric Single-Tower Cable-Stayed Bridges

Quan Zhang , Xianjing Li , Jishu Wu , Chao Liu

Prestress Technology ›› 2023, Vol. 1 ›› Issue (3) : 70 -81.

PDF (1343KB)
Prestress Technology ›› 2023, Vol. 1 ›› Issue (3) :70 -81. DOI: 10.59238/j.pt.2023.03.006
Design and Construction
research-article
Study on the Tensioning Scheme for Construction Monitoring of Asymmetric Single-Tower Cable-Stayed Bridges
Author information +
History +
PDF (1343KB)

Abstract

Cable-stayed bridges, due to their unique mechanical structure, have the ability to span larger distances, therefore, they are increasingly emphasized in modern bridge construction. With the continuous improvement of engineering requirements, cable-stayed bridges have gradually become a primary bridge type for long-span structures. Due to the complexity of cable-stayed bridge structures, to ensure that the actual construction state of the bridge is close to optimal, the bridge must be strictly monitored and controlled during construction. In this paper, Jinwu Bridge in Jinhua, Zhejiang Province, is taken as the research background. This bridge is an asymmetric single-tower cable-stayed bridge. The spans and materials of the main girders on both sides of the bridge pylons are different. During the tensioning of stay cables, the space effect of the main girder is prone to generating an unbalanced moment. Herein, a study on the tensioning scheme of stay cables is carried out. The results show that, compared with those of the one-time tensioning scheme for stay cables, the stress state and cable force of the bridge are better when the two-time tensioning scheme is used, meeting the construction monitoring requirements.

Keywords

Asymmetric cable-stayed bridge / finite element calculation / construction monitoring

Cite this article

Download citation ▾
Quan Zhang, Xianjing Li, Jishu Wu, Chao Liu. Study on the Tensioning Scheme for Construction Monitoring of Asymmetric Single-Tower Cable-Stayed Bridges. Prestress Technology, 2023, 1 (3) : 70-81 DOI:10.59238/j.pt.2023.03.006

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Zhan, J.; Zhang, M. Prestressed Concrete Partial Cable-stayed Bridge ; China Communications Press Co., Ltd.: 2016.

[2]

Wang, J.; Xu, J.; Dai, Z. Construction Techniques for Stay Cables of Xichang Cable-Stayed Bridge in Tonghua. Bridge Construction 2006, 77-80, doi: 10.3969/j.issn.1003-4722.2006.z1.025.

[3]

Zhou, H.; Xiong, S. Optimization Scheme of Stay Cable Adjustment for Main Bridge of Nancang Avenue Interchange in Tianjin. Bridge Construction 2010, 36-39.

[4]

Liang, P.; Xiao, R.; Xu, Y. Random Simulation Analysis of Construction Process for Super-Long-Span Cable-Stayed Bridges. China Journal of Highway and Transport 2006, 52-58, doi: 10.19721/j.cnki.1001-7372.2006.04.010.

[5]

Zheng, Z.; Xiang, Y.; Zhu, W. Determination and Optimization of Cable Stresses during Construction for Cable-stayed Bridge. China Municipal Engineering 2002, 28-31, doi: 10.3969/j.issn.1004-4655.2002.03.009.

[6]

Duan, R.; Ran, Z.; Wang, X.; Bai, Y. Study of the Backfill Effect on Tunnel Lining Segments Property. Journal of Xi'an University of Architecture & Technology(Natural Science Edition) 2019, 51, 59-66+82, doi: 10.15986/j.1006-7930.2019.01.010.

[7]

Wei, D.; Peng, X.; Tao, L.; Yin, G. Optimization and Analysis of Tensioned Stay Cable Forces in Construction of Liuguang River Bridge. Bridge Construction 2017, 47, 36-41, doi: 10.3969/j.issn.1003-4722.2017.06.007.

PDF (1343KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉