Managing construction risks of AP1000 nuclear power plants in China

Shufeng Wang , M. I. M. Wahab , Liping Fang

Journal of Systems Science and Systems Engineering ›› 2011, Vol. 20 ›› Issue (1) : 43 -69.

PDF
Journal of Systems Science and Systems Engineering ›› 2011, Vol. 20 ›› Issue (1) : 43 -69. DOI: 10.1007/s11518-011-5157-y
Article

Managing construction risks of AP1000 nuclear power plants in China

Author information +
History +
PDF

Abstract

Large and complex construction projects face risk from various sources and the successful completion of such projects depends on effective risk management. This study investigates the risk faced by Chinese firms participating in constructing AP1000 nuclear power plants in China. AP1000 nuclear reactors are new, Generation III+ reactors designed by Westinghouse and to be built first in China. The semi-structured interview approach is used to elicit information from experts involved in the AP1000 projects in China. Based on the interviews, various sources of risk are identified. In addition to general risks that megaprojects normally face, there are unique risks that arise from various sources such as technological, political, organizational, and individual personnel risks. Risk management strategies are proposed to manage general and unique risks identified in the study. The findings of this study would be helpful for Chinese companies involved in the construction of AP1000 nuclear power plants to mitigate the risks associated with the projects.

Keywords

Risk management / construction risks / nuclear power plants / AP1000 / semi-structured interview

Cite this article

Download citation ▾
Shufeng Wang, M. I. M. Wahab, Liping Fang. Managing construction risks of AP1000 nuclear power plants in China. Journal of Systems Science and Systems Engineering, 2011, 20(1): 43-69 DOI:10.1007/s11518-011-5157-y

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Barber R.B.. Understanding internally generated risks in projects. International Journal of Project Management, 2005, 23(8): 584-590.

[2]

Bing L., Akintoye A., Edwards P.J., Hardcastle C.. The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 2005, 23(1): 25-35.

[3]

Carr V., Tah J.H.M.. A fuzzy approach to construct project risk assessment and analysis: construction project risk management system. Advances in Engineering Software, 2001, 32(10–11): 847-857.

[4]

Chapman C., Ward S.. Project Risk Management: Processes, Techniques and Insights, 1997, First Edition UK: Wiley.

[5]

Chen D., Sha Y.. More market players needed if China is to meet nuclear power target-experts. An Industry Conference on Renewable Energy in Beijing, 2007, 1: 1-2.

[6]

Cohen B.L.. The Nuclear Energy Option, 1990, Pittsburgh, PA, USA: Plenum Press

[7]

Cooke N.J.. Varieties of knowledge elicitation techniques. International Journal of Human Computer Studies, 1994, 41(6): 801-849.

[8]

Corradini, M.L. (2003). Nuclear power: prospects in the 21st century. In: Rohsenow Symposium on Future Trends in Heat Transfer, Massachusetts Institute of Technology, Cambridge, MA

[9]

Cullen J., Bryman A.. The knowledge acquisition bottleneck: a time for reassessment?. Expert Systems, 1988, 5(3): 216-225.

[10]

Dixon H.J., Doores J.W., Joshi L., Sinclair F.L.. Agroecological Knowledge Toolkit for Windows: Methodological Guidelines, Computer Software and Manual for AKT5, 2001, Bangor, UK: School of Agricultural and Forest Sciences, University of Wales

[11]

Drury, C.G. (1990). Methods for direct observation of performance. In: Wilson, J.R., Corlett, E.N. (eds.), Evaluation of Human Work: A Practical Ergonomics Methodology, pp. 35–57. Taylor and Francis

[12]

Dvir D., Sadeh A., Malach-Pines A.. Projects and project managers: the relationship between project managers, personality, project types, and project success. Project Management Journal, 2006, 37(5): 36-48.

[13]

Edwards P.J., Bowen P.A.. Risk and risk management in construction: a review and future directions for research. Engineering, Construction and Architectural Management, 1998, 5(4): 339-349.

[14]

Evans, A.W., Jentsch, F., Hitt, J.M., Bowers, C., & Salas, E. (2001). Mental model assessments: is there convergence among different methods? In: Proceedings of the Human Factors and Ergonomics Society 45th Annual Meeting, 293–296

[15]

Flyvbjerg B., Bruzelius N., Rothengatter W.. Megaprojects and Risk: An Anatomy of Ambition, 2003, Cambridge, UK: Cambridge University Press

[16]

Flyvbjerg B.. From Nobel Prize to project management: getting risks right. Project Management Journal, 2006, 37(3): 5-15.

[17]

Ghosh S., Jintanapakanont J.. Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach. International Journal of Project Management, 2004, 22(8): 633-643.

[18]

Hoffman R.R., Shadbolt N.R., Burton A.M., Klein G.. Eliciting knowledge from experts: a methodological analysis. Organizational Behavior and Human Decision Processes, 1995, 62(2): 129-158.

[19]

Hyvari I.. Success of projects in different organizational conditions. Project Management Journal, 2006, 37(4): 31-41.

[20]

IAEA. (2003). People’s Republic of China, IAEA Energy and Economic Database and Country Information, 210–230. Available via DIALOG. http://www-pub.iaea.org/MTCD/publications/PDF/cnpp2003/CNPP_Webpage/PDF/2002/Documents/Documents/China%20PR%202002.pdf. Cited September 6, 2010

[21]

Kutsch E., Hall M.. Intervening conditions on the management of project risk: dealing with uncertainty in information technology projects. International Journal of Project Management, 2005, 23(8): 591-599.

[22]

Madachy R.J.. Heuristic risk assessment using cost factors. IEEE Software, 1997, 14(3): 51-59.

[23]

Medda F.. A game theory approach for the allocation of risks in transport public private partnerships. International Journal of Project Management, 2007, 25(3): 213-218.

[24]

Nogueira J.C., Raz T.. Structure and flexibility of project teams under turbulent environments: an application of agent-based simulation. Project Management Journal, 2006, 37(2): 5-10.

[25]

Ou Y.. The development tendency of nuclear power technologies in the world and position of the third generation nuclear power technologies. Conference on the Third Generation Nuclear Power Technologies, 2007, 1: 4-9.

[26]

Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide), 2009, 4th Edition Newtown Square, PA, USA: Project Management Institute

[27]

Sasse, M.A. (1991). How to t(r)ap users’ mental models. In: Tauber, M.J., Ackermann, D. (eds.), Mental Models and Human-computer Interaction 2, pp. 59–79. Elsevier

[28]

Schulz T.L.. Westinghouse AP1000 advanced passive plant. Nuclear Engineering and Design, 2006, 236(14–16): 1547-1557.

[29]

Schvaneveldt R.W.. Pathfinder Associative Networks: Studies in Knowledge Organization, 1990, Norwood, NJ, USA: Ablex Publishing

[30]

Shadbolt, N. & Burton, M. (1990). Knowledge elicitation. In: Wilson, J.R., Corlett, E.N. (eds.), Evaluation of Human Work: A Practical Ergonomics Methodology, pp. 321–345. Taylor and Francis

[31]

Shaw M.L.G., Woodward J.B.. Modeling expert knowledge. Knowledge Acquisition, 1990, 2(3): 179-206.

[32]

Sundstrom G.A.. Process tracing of decision making: an approach for analysis of human-machine interactions in dynamic environments. International Journal of Man-machine Studies, 1991, 35(6): 843-858.

[33]

Taylor H.. Risk management and problem resolution strategies for IT projects: prescription and practice. Project Management Journal, 2006, 37(5): 49-63.

[34]

Turner J.R.. The role of pilot studies in reducing risk on projects and programmes. International Journal of Project Management, 2005, 23(1): 1-6.

[35]

Westinghouse Electric Company. (2007). AP1000 design control document, APP-GW-GL-700, Revision 16. Pittsburgh, PA, USA

[36]

World Nuclear Association. (2007). Nuclear power in China. Available via DIALOG. http://www.world-nuclear.org/info/inf63.html. Cited November 2007

[37]

Xiaoliang D.. Program on self-reliance construction of AP1000. Conference on the Third Generation Nuclear Power Technologies, 2007, 1: 34-38.

[38]

Xie G., Zhang J., Lai K.K.. Risks avoidance in bidding for software project based on life cycle management theory. International Journal of Project Management, 2006, 24(6): 516-521.

[39]

Zhang H.. The third generation nuclear power technologies and the development of China’s nuclear energy industry. Conference on the Third Generation Nuclear Power Technologies, 2007, 1: 19-21.

[40]

Zhang L.. The role of the third generation nuclear power technology in China’s nuclear power development. Conference on the Third Generation Nuclear Power Technologies, 2007, 1: 51-54.

AI Summary AI Mindmap
PDF

156

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/