Lot sizing with non-zero setup times for rework
Rasoul Haji , Alireza Haji , Mehdi Sajadifar , Saeed Zolfaghari
Journal of Systems Science and Systems Engineering ›› 2008, Vol. 17 ›› Issue (2) : 230 -240.
Lot sizing with non-zero setup times for rework
In this paper we consider a single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. In each cycle after the normal production of each product the machine is setup for the rework of the defectives of the same product and then the rework process starts. We assume that the setup time for the normal production process as well as the rework process is non-zero. Further we consider the waiting time cost of defectives for rework. This paper has two objectives. The first objective is to obtain the economic batch quantity (EBQ) for a single product. The second objective is to extend the result of the first objective to the multi-product case. Adopting the common cycle scheduling policy we obtain optimal batch sizes for each product such that the total cost of the system per unit time is minimized.
Inventory control / rework / lot scheduling / production control
| [1] |
|
| [2] |
|
| [3] |
|
| [4] |
|
| [5] |
|
| [6] |
|
| [7] |
|
| [8] |
Gunter, S.I. & Swanson, L.A. (1986). A heuristic for zero setup cost lot sizing and scheduling problems. In: ORSA-TIMS Conference, 27-28, October 1986, Miami, Florida, USA |
| [9] |
|
| [10] |
|
| [11] |
Haji, R., Rahmati Tavakol, A. & Haji, B. (2006). Economic production quantity with accumulated rework. In: 36th CIE Conference on Computers and Industrial Engineering, 4196–4203, Taiwan, China |
| [12] |
|
| [13] |
|
| [14] |
|
| [15] |
|
| [16] |
|
| [17] |
|
| [18] |
|
| [19] |
|
| [20] |
|
| [21] |
Roundy, R. (1988). Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems. Technical Report, College of Engineering, Cornell University |
| [22] |
Zipkin, P.H. (1988). Computing optimal lot sizes in the economic lot scheduling problem. Working Paper, Graduate School of Business, Columbia University |
/
| 〈 |
|
〉 |