Settlement characteristics of large-diameter shield excavation below existing subway in close vicinity

Qian Fang , Jian-ming Du , Jian-ye Li , Ding-li Zhang , Li-qiang Cao

Journal of Central South University ›› 2021, Vol. 28 ›› Issue (3) : 882 -897.

PDF
Journal of Central South University ›› 2021, Vol. 28 ›› Issue (3) : 882 -897. DOI: 10.1007/s11771-021-4628-7
Article

Settlement characteristics of large-diameter shield excavation below existing subway in close vicinity

Author information +
History +
PDF

Abstract

A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented. The new Qinghuayuan tunnel, part of the Beijing-Zhangjiakou High-speed Railway, was excavated by a shield machine with an outer diameter of 12.2 m. The existing subway was excavated by shallow tunnelling method. The project layout, geological conditions, reinforcement measures, operational parameters of shield machine and monitoring results of the project are introduced. During the Qinghuayuan tunnel excavation below the existing subway, total thrust, shield driving speed, cutterhead rotation speed and torque were manually controlled below the average values obtained from the previous monitoring of this project, which could effectively reduce the disturbance of the surrounding soil induced by shield excavation. The Gaussian fitting function can appropriately fit both the ground and the existing subway settlements. The trough width is influenced not only by the excavation overburden depth, but also by the forepoling reinforcement and tail void grouting measures.

Keywords

adjacent excavation / shield method / operational parameters / settlement characteristics

Cite this article

Download citation ▾
Qian Fang, Jian-ming Du, Jian-ye Li, Ding-li Zhang, Li-qiang Cao. Settlement characteristics of large-diameter shield excavation below existing subway in close vicinity. Journal of Central South University, 2021, 28(3): 882-897 DOI:10.1007/s11771-021-4628-7

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

LiX-g, YuanD-jun. Response of a double-decked metro tunnel to shield driving of twin closely under-crossing tunnels [J]. Tunnelling and Underground Space Technology, 2012, 28: 18-30

[2]

LiX-g, ZhangC-p, YuanD-jun. An in-tunnel jacking above tunnel protection methodology for excavating a tunnel under a tunnel in service [J]. Tunnelling and Underground Space Technology, 2013, 34: 22-37

[3]

LiQ-q, ZhangD-l, FangQ, LiDong. Study of deformation characteristics of tunnels traversing adjacently under shield tunnels by shallow tunnelling method [J]. Chinese Journal of Rock Mechanics & Engineering, 2014, 33(S2): 3911-3918(in Chinese)

[4]

WangS-m, WangX-m, ChenB, FuY-b, JianY-q, LuX-xi. Critical state analysis of instability of shield tunnel segment lining [J]. Tunnelling and Underground Space Technology, 2020, 96: 103180

[5]

ZhangQ-f, XiaT-d, DingZ, HuangX-b, LinC-gang. Effect of nearby undercrossing tunneling on the deformation of existing metro tunnel and construction control [J]. Rock and Soil Mechanics, 2016, 37(12): 3561-3568(in Chinese)

[6]

XieX-y, WangQ, QiY, LiJ, YuX-guo. Settlement control of slurry shield tunneling crossing adjacent buildings in mixed ground of round gravel and mudstone [J]. Chinese Journal of Geotechnical Engineering, 2017, 39(9): 1951-1959(in Chinese)

[7]

ZhangC-p, ZhangX, FangQian. Behaviors of existing twin subway tunnels due to new subway station excavation below in close vicinity [J]. Tunnelling and Underground Space Technology, 2018, 81121-128

[8]

BaiH-w, WangJ-c, LiuY-l, ZhangD-li. Safety control and mechanical response of existing underground structures induced by excavation of new tunnels under construction [J]. Chinese Journal of Geotechnical Engineering, 2019, 41(5): 874-884(in Chinese)

[9]

LaiH-p, ZhengH-w, ChenR, KangZ, LiuYang. Settlement behaviors of existing tunnel caused by obliquely under-crossing shield tunneling in close proximity with small intersection angle [J]. Tunnelling and Underground Space Technology, 2020, 97: 103258

[10]

LiS-h, LiP-f, ZhangM-ju. Analysis of additional stress for a curved shield tunnel [J]. Tunnelling and Underground Space Technology, 2021, 107103675

[11]

NgC W W, BoonyarakT, MašínD. Three-dimensional centrifuge and numerical modeling of the interaction between perpendicularly crossing tunnels [J]. Canadian Geotechnical Journal, 2013, 50(9): 935-946

[12]

ChenR-p, LinX-t, KangX, ZhongZ-q, LiuY, ZhangP, WuH-na. Deformation and stress characteristics of existing twin tunnels induced by close-distance EPBS under-crossing [J]. Tunnelling and Underground Space Technology, 2018, 82468-481

[13]

LiuT, XieY, FengZ-h, LuoY-b, WangK, XuWei. Better understanding the failure modes of tunnels excavated in the boulder-cobble mixed strata by distinct element method [J]. Engineering Failure Analysis, 2020, 116: 104712

[14]

CooperM L, ChapmanD N, RogersC D F, ChanA H C. Movements in the Piccadilly line tunnels due to the Heathrow express construction [J]. Geotechnique, 2002, 52(4): 243-257

[15]

FangQ, ZhangD-L, WongL N Y. Shallow tunnelling method (STM) for subway station construction in soft ground [J]. Tunnelling and Underground Space Technology, 2012, 2910-30

[16]

FangQ, ZhangD-l, LiQ-q, WongL N Y. Effects of twin tunnels construction beneath existing shield-driven twin tunnels [J]. Tunnelling and Underground Space Technology, 2015, 45: 128-137

[17]

FangQ, TaiQ-m, ZhangD-l, WongL N Y. Ground surface settlements due to construction of closely-spaced twin tunnels with different geometric arrangements [J]. Tunnelling and Underground Space Technology, 2016, 51: 144-151

[18]

LiuX, FangQ, ZhangD-li. Mechanical responses of existing tunnel due to new tunnelling below without clearance [J]. Tunnelling and Underground Space Technology, 2018, 80: 44-52

[19]

LiuX, FangQ, ZhangD-l, WangZ-ju. Behaviour of existing tunnel due to new tunnel construction below [J]. Computers & Geotechnics, 2019, 110: 71-81

[20]

ZhangD-m, HuangZ-k, LiZ-l, ZongX, ZhangD-ming. Analytical solution for the response of an existing tunnel to a new tunnel excavation underneath [J]. Computers & Geotechnics, 2019, 108: 197-211

[21]

ZhouZ, CehnY, LiuZ-z, MiaoL-wu. Theoretical prediction model for deformations caused by construction of new tunnels undercrossing existing tunnels based on the equivalent layered method [J]. Computers & Geotechnics, 2020, 123: 103565

[22]

LiuB, YuZ-w, HanY-h, WangZ-l, ZhangR-h, WangS-jie. Analytical solution for the response of an existing tunnel induced by above-crossing shield tunnel [J]. Computers & Geotechnics, 2020, 124103624

[23]

ZhangZ-g, HuangM-song. Geotechnical influence on existing subway tunnels induced by multiline tunneling in Shanghai soft soil [J]. Computers & Geotechnics, 2014, 56121-132

[24]

NgC W W, FongK Y, LiuH-long. The effects of existing horseshoe-shaped tunnel sizes on circular crossing tunnel interactions: Three-dimensional numerical analyses [J]. Tunnelling and Underground Space Technology, 2018, 77: 68-79

[25]

YinM-l, JiangH, JiangY-s, SunZ-y, WuQ-li. Effect of the excavation clearance of an under-crossing shield tunnel on existing shield tunnels [J]. Tunnelling and Underground Space Technology, 2018, 78: 245-258

[26]

LiX-t, ChenR-p, WuH-n, ChengH-zhan. Deformation behaviors of existing tunnels caused by shield tunneling undercrossing with oblique angle [J]. Tunnelling and Underground Space Technology, 2019, 89: 78-90

[27]

JiangB, ChenL, YangJ-s, WangS-y, NgC W W. Effects of twin-tunnel excavation on an existing horseshoe-shaped tunnel considering the influence of a settlement joint [J]. Canadian Geotechnical Journal, 2017, 54(9): 1346-1355

[28]

JinD-l, YuanD-j, WeiJ-x, LiX-g, LuPing. Centrifugal model test of group tunneling with small spacing beneath existing tunnels [J]. Chinese Journal of Geotechnical Engineering, 2018, 40(8): 1507-1514(in Chinese)

[29]

JinD-l, YuanD-j, LiX-g, ZhengH-tian. An in-tunnel grouting protection method for excavating twin tunnels beneath an existing tunnel [J]. Tunnelling and Underground Space Technology, 2018, 71: 27-35

[30]

RussoG P, CorboA D, CavuotoF P, AutuoriS L. Artificial ground freezing to excavate a tunnel in sandy soil. Measurements and back analysis [J]. Tunnelling and Underground Space Technology, 2015, 50: 226-238

[31]

CaiH-b, LiuZ, LiS, ZhengT-long. Improved analytical prediction of ground frost heave during tunnel construction using artificial ground freezing technique [J]. Tunnelling and Underground Space Technology, 2019, 92: 103050

[32]

ZhengH-b, LiP-f, MaG-wei. Stability analysis of the middle soil pillar for asymmetric parallel tunnels by using model testing and numerical simulations [J]. Tunnelling and Underground Space Technology, 2021, 108103686

[33]

HeS-y, LaiJ-x, ZhongY-j, WangK, XuW, WangL-x, LiuT, ZhangC-ping. Damage behaviors, prediction methods and prevention methods of rockburst in 13 deep traffic tunnels in China [J]. Engineering Failure Analysis, 2021, 121105178

[34]

HanX, LiN, StandingJ R. An adaptability study of Gaussian equation applied to predicting ground settlements induced by tunneling in China [J]. Rock and Soil Mechanics, 2007, 28(1): 23-30(in Chinese)

[35]

PECK R B. Deep excavations and tunneling in soft ground [C]//Pro 7th Int Conf SMFE. Mexico City, 1969: 225–290.

[36]

O’ReillyM P, NewB M. Settlements above tunnels in the United Kingdom—Their magnitude and prediction [C]. Proc Tunnelling 82, 1982, London, Institution of Mining and Metallurgy, 173-181

AI Summary AI Mindmap
PDF

186

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/