Two-stage optimization model for renewing warranty considering warranty deadline

Chun Su , Xiao-tian Yang

Journal of Central South University ›› 2019, Vol. 26 ›› Issue (10) : 2845 -2853.

PDF
Journal of Central South University ›› 2019, Vol. 26 ›› Issue (10) : 2845 -2853. DOI: 10.1007/s11771-019-4218-0
Article

Two-stage optimization model for renewing warranty considering warranty deadline

Author information +
History +
PDF

Abstract

Renewing warranty can provide customers with better service, and thus help manufacturers to gain market opportunities. In engineering practice, the cost for replacement is usually higher than the cost for maintenance, hence manufacturers often face huge challenge to reduce the warranty service cost. With consideration of the warranty deadline, we propose a two-stage optimization model for renewing warranty. In the first stage, a renewing warranty with deadline (RWD) policy is implemented, where the deadline represents the cumulative uptime threshold. When the cumulative uptime exceeds the deadline, the product will be minimally repaired and kept to the residual warranty period. When RWD is expired, the replacement warranty with limited repairs (RWLR) policy is applied. Under the free replacement and pro-rata warranty policy, the corresponding two-stage cost optimization model is established from the manufacturer’s perspective, the aim is to minimize the cost rate and obtain the optimal warranty period. A numerical example is provided to illustrate the validity of the proposed model, and the sensitivity analysis is also carried out.

Keywords

renewing warranty with deadline / limited repairs / minimal repair / warranty cost rate

Cite this article

Download citation ▾
Chun Su, Xiao-tian Yang. Two-stage optimization model for renewing warranty considering warranty deadline. Journal of Central South University, 2019, 26(10): 2845-2853 DOI:10.1007/s11771-019-4218-0

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

ZhaoX-j, XieMin. Using accelerated life tests data to predict warranty cost under imperfect repair [J]. Computers & Industrial Engineering, 2017, 107: 223-234

[2]

MoS-m, ZengJ-c, XuW-bin. A new warranty policy based on a buyer’s preventive maintenance investment [J]. Computers & Industrial Engineering, 2017, 111: 433-444

[3]

SuC, WangX-lin. Modeling flexible two-dimensional warranty contracts for used products considering reliability improvement actions [J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2016, 230(2): 237-247

[4]

YangD, HeZ, HeS-guang. Warranty claims forecasting based on a general imperfect repair model considering usage rate [J]. Reliability Engineering & System Safety, 2016, 145: 147-154

[5]

ChenC K, LoC C, WengT C. Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period [J]. European Journal of Operational Research, 2017, 259(2): 401-412

[6]

ParkM, JungK M, ParkD H. Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty [J]. Reliability Engineering & System Safety, 2018, 170: 1-9

[7]

VahdaniH, MahloojiH, JahromiA E. Warranty servicing for discretely degrading items with non-zero repair time under renewing warranty [J]. Computers & Industrial Engineering, 2013, 65(1): 176-185

[8]

MondalS, PalS, MannaD K. Cost estimation under renewing warranty policy?An application [J]. Quality Engineering, 2003, 16(1): 93-98

[9]

LiX-y, JiaY-x, WangP, XieJ, GaoQ-h, SiX-sheng. Renewable warranty policy for multiple-failure-mode product considering different maintenance options [J]. Eksploatacja i Niezawodnosc-Maintenance and Reliability, 2015, 17(4): 551-560

[10]

ShafieeM, ChukovaS. Maintenance models in warranty: A literature review [J]. European Journal of Operational Research, 2013, 229(3): 561-572

[11]

ShangL-j, CaiZ-qiang. Optimal replacement policy of products with repair-cost threshold after the extended warranty [J]. Journal of Systems Engineering and Electronics, 2017, 28(4): 725-731

[12]

SahinI, PolatogluH. Maintenance strategies following the expiration of warranty [J]. IEEE Transactions on Reliability, 1996, 45(2): 220-228

[13]

JungG M, ParkD H. Optimal maintenance policies during the post-warranty period [J]. Reliability Engineering & System Safety, 2003, 82(2): 173-185

[14]

JungK M, HanS S, ParkD H. Optimization of cost and downtime for replacement model following the expiration of warranty [J]. Reliability Engineering & System Safety, 2008, 93(7): 995-1003

[15]

YehR H, ChenG C, ChenM Y. Optimal age-replacement policy for nonrepairable products under renewing free-replacement warranty [J]. IEEE transactions on reliability, 2005, 54(1): 92-97

[16]

ChienY H. A general age-replacement model with minimal repair under renewing free-replacement warranty [J]. European Journal of Operational Research, 2008, 186(3): 1046-1058

[17]

JungK M, ParkM, ParkD H. System maintenance cost dependent on life cycle under renewing warranty policy [J]. Reliability Engineering & System Safety, 2010, 95(7): 816-821

[18]

WuC C, ChouC Y, HuangC. Optimal burn-in time and warranty length under fully renewing combination free replacement and pro-rata warranty [J]. Reliability Engineering & System Safety, 2007, 92(7): 914-920

[19]

ChienY H. A new warranty strategy: Combining a renewing free-replacement warranty with a rebate policy [J]. Quality and Reliability Engineering International, 2008, 24(7): 807-815

[20]

ChienY H. Optimal age for preventive replacement under a combined fully renewable free replacement with a pro-rata warranty [J]. International Journal of Production Economics, 2010, 124(1): 198-205

[21]

LiuF-m, ZhuH-p, LiuB-xing. Maintenance decision-making method for manufacturing system based on cost and arithmetic reduction of intensity model [J]. Journal of Central South University, 2013, 20(6): 1559-1571

[22]

ParkM, JungK M, ParkD H. Optimal post-warranty maintenance policy with repair time threshold for minimal repair [J]. Reliability Engineering & System Safety, 2013, 111: 147-153

[23]

ParkM, JungK M, ParkD H. A generalized age replacement policy for systems under renewing repair-replacement warranty [J]. IEEE Transactions on Reliability, 2016, 65(2): 604-612

[24]

ParkM, JungK M, ParkD H. Optimal maintenance strategy under renewable warranty with repair time threshold [J]. Applied Mathematical Modelling, 2017, 43: 498-508

[25]

TangS-j, YuC-q, FengY-b, XieJ, GaoQ-h, SiX-sheng. Remaining useful life estimation based on wiener degradation processes with random failure threshold [J]. Journal of Central South University, 2016, 23(9): 2230-2241

[26]

BaiJ, PhamH. Repair-limit risk-free warranty policies with imperfect repair[J]. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans, 2005, 35(6): 765-772

[27]

Samatli-PaçG, TanerM R. The role of repair strategy in warranty cost minimization: An investigation via quasi-renewal processes [J]. European Journal of Operational Research, 2009, 197(2): 632-641

[28]

LiW-j, PhamH. An inspection-maintenance model for systems with multiple competing processes [J]. IEEE Transactions on Reliability, 2005, 54(2): 318-327

[29]

ChenJ A, ChienY H. Renewing warranty and preventive maintenance for products with failure penalty post-warranty [J]. Quality and Reliability Engineering International, 2007, 23(1): 107-121

AI Summary AI Mindmap
PDF

117

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/