Long-term settlement prediction of high-speed railway bridge pile foundation

Qi Yang , Wu-ming Leng , Sheng Zhang , Ru-song Nie , Li-min Wei , Chun-yan Zhao , Wei-zheng Liu

Journal of Central South University ›› 2014, Vol. 21 ›› Issue (6) : 2415 -2424.

PDF
Journal of Central South University ›› 2014, Vol. 21 ›› Issue (6) : 2415 -2424. DOI: 10.1007/s11771-014-2195-x
Article

Long-term settlement prediction of high-speed railway bridge pile foundation

Author information +
History +
PDF

Abstract

The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis, and the corresponding loading function was presented. One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading. Moreover, the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform. The three-dimensional composite analysis method of bridge pile group was improved, where the actual load conditions of pile foundation could be simulated, and the consolidation characteristics of soil layers beneath pile were also taken into account. Eventually, a corresponding program named LTPGS was developed to improve the calculation efficiency. The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated, and a close agreement is obtained. The error between computed and measured results is less than 1 mm, and it gradually reduces with time. It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation.

Keywords

bridge pile foundation / long-term settlement / consolidation / Laplace numerical inversion transform / multilevel loading / multilayered soils

Cite this article

Download citation ▾
Qi Yang, Wu-ming Leng, Sheng Zhang, Ru-song Nie, Li-min Wei, Chun-yan Zhao, Wei-zheng Liu. Long-term settlement prediction of high-speed railway bridge pile foundation. Journal of Central South University, 2014, 21(6): 2415-2424 DOI:10.1007/s11771-014-2195-x

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

LengW-m, YangQ, NieR-s, YueJian. Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation [J]. Rock and Soil Mechanics, 2011, 32(11): 3341-3348

[2]

MeyerhofG G. Bearing capacity and settlement of pile foundations [J]. Journal of Geotechnical Engineering, 1976, 102(3): 195-228

[3]

PoulosH G. Analysis of the settlement of pile groups [J]. Geotechnique, 1968, 18(4): 449-471

[4]

WeiD G, RandolphM F. An efficient approach for settlement prediction of pile groups [J]. Geotechnique, 1999, 49(2): 161-179

[5]

DungN T, ChungS G, KimS R. Settlement of piled foundations using equivalent raft approach [J]. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering, 2010, 163(2): 65-81

[6]

CastelliF, MaugeriM. Simplified nonlinear analysis for settlement prediction of pile groups [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2002, 128(1): 76-84

[7]

BourgeoisE, BuhanD P, HassenG. Settlement analysis of piled-raft foundations by means of a multiphase model accounting for soil-pile interactions [J]. Computers and Geotechnics, 2012, 46: 26-38

[8]

ChoJ, LeeJ H, JeongS, LeeJ. The settlement behavior of piled raft in clay soils [J]. Ocean Engineering, 2012, 53: 153-163

[9]

YangQ, LengW-m, ZhuW-bing. Study on correlation combination forecast of post-construction settlement of high-speed railway bridge pile foundation [C]. CHEN F. Key Technologies of Railway Engineering-High Speed Railway, Heavy Haul Railway and Urban Rail Transit, 2010, Beijing, China Railway Publishing House: 896-903

[10]

HuD-g, LuoS-x, ZhaoS-rui. Calculation method research on the settlement of pile group foundation beyond construction [J]. Journal of Transportation Engineering and Information, 2004, 3(2): 48-52

[11]

ZengQ-y, ZhouJ, QuJ-tong. Method for long-term settlement prediction of pile-foundation in consideration of time effect of stress-strain relationship [J]. Rock and Soil Mechanics, 2005, 26(8): 1283-1287

[12]

ChengZ-h, LingD-s, ChenY-min. Time effects on piled raft foundation under vertical loading [J]. China Civil Engineering Journal, 2004, 37(2): 73-77

[13]

BookerJ R, PoulosH G. Analysis of creep settlement of pile foundations [J]. Journal of the Geotechnical Engineering Division, 1976, 102(1): 1-14

[14]

BrownP T, BookerJ R. Numerical analysis of rafts on visco-elastic media using eigenvector expansions [J]. International Journal for Numerical and Analytical Methods in Geomechanics, 1979, 3(1): 63-78

[15]

WeiD G. Visco-elastic load transfer models for axially loaded piles [J]. International Journal for Numerical and Analytical Methods in Geomechanics, 2000, 24(2): 135-163

[16]

WuW B, WangK H, ZhangZ Q, ChinJ L. A new approach for time effect analysis of settlement for single pile based on virtual soil pile model [J]. Journal of Central South University, 2012, 19: 2656-2662

[17]

SmallJ C, LiuH L S. Time-settlement behavior of piled raft foundations using infinite elements [J]. Computers and Geotechnics, 2008, 35(2): 187-195

[18]

EdilT, MochtarI. Creep response of model pile in clay [J]. Journal of Geotechnical Engineering, 1988, 114(11): 1245-1260

[19]

BartolomeyA A, OmelchakI M, ShardakovI N. Pile settlements in visco-elasto-plastic medium [C]. Proceedings of the 10th European Conference on Soil Mechanics and Foundation Engineering-Deformation of Soils and Displacements of Structures, 1991, Florence, Balkema A A: 659-660

[20]

DannoK, KimuraM. Evaluation of long-term displacements of pile foundation using coupled fem and centrifuge model test [J]. Soils and Foundations, 2009, 49(6): 941-958

[21]

CuiC Y, LuanM T, LiM GROBERTY L. A study on time-effects of piled raft system by using computational methods [C]. Deep Foundations and Geotechnical In Situ Testing — Proceedings of the 2010 Geo-Shanghai International Conference, 2010, Shanghai, ASCE: 42-51

[22]

LengW-m, WeiL-m, HeQunStudy on the reasonable shape and design for high-speed railway bridge pile foundation on the deep and soft ground [R], 1998, Changsha, Changsha Railway University

[23]

YangQiStudy on deformation behavior test and settlement after acceptance of high-speed railway bridge pile foundation [D], 2011, Changsha, Central South University

[24]

MaL-congAnalysis and computing of settlement beyond construction of pile-group foundation of railway bridge [D], 2006, Chengdu, Southwest Jiaotong University

[25]

LiG-xinAdvanced soil mechanics [M], 2004, Beijing, Tsinghua University Press

[26]

StehfestH. Remark on Algorithm 368: Numerical inversion of Laplace transforms [J]. Communication of the ACM, 1970, 13(10): 624

AI Summary AI Mindmap
PDF

131

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/