Multi-objective optimization of rolling schedule based on cost function for tandem cold mill

Shu-zong Chen , Xin Zhang , Liang-gui Peng , Dian-hua Zhang , Jie Sun , Yin-zhong Liu

Journal of Central South University ›› 2014, Vol. 21 ›› Issue (5) : 1733 -1740.

PDF
Journal of Central South University ›› 2014, Vol. 21 ›› Issue (5) : 1733 -1740. DOI: 10.1007/s11771-014-2117-y
Article

Multi-objective optimization of rolling schedule based on cost function for tandem cold mill

Author information +
History +
PDF

Abstract

In terms of tandem cold mill productivity and product quality, a multi-objective optimization model of rolling schedule based on cost function was proposed to determine the stand reductions, inter-stand tensions and rolling speeds for a specified product. The proposed schedule optimization model consists of several single cost functions, which take rolling force, motor power, inter-stand tension and stand reduction into consideration. The cost function, which can evaluate how far the rolling parameters are from the ideal values, was minimized using the Nelder-Mead simplex method. The proposed rolling schedule optimization method has been applied successfully to the 5-stand tandem cold mill in Tangsteel, and the results from a case study show that the proposed method is superior to those based on empirical formulae.

Keywords

tandem cold mill / multi-object optimization / rolling schedule / cost function / simplex algorithm

Cite this article

Download citation ▾
Shu-zong Chen, Xin Zhang, Liang-gui Peng, Dian-hua Zhang, Jie Sun, Yin-zhong Liu. Multi-objective optimization of rolling schedule based on cost function for tandem cold mill. Journal of Central South University, 2014, 21(5): 1733-1740 DOI:10.1007/s11771-014-2117-y

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

FiebigE, ZanderH. Automation of cold-rolling tandem mills [J]. Metallurgical Plant and Technology, 1982, 5(3): 88-97

[2]

LinS, NanY-rong. Optimization of rolling schedule in tandem cold mill based on QPSO Algorithm [J]. Advanced Materials Research, 2011, 145: 165-170

[3]

WeiL-x, LiX-q, LiY, YangJ-ming. Optimization of tandem cold rolling schedule based on improved adaptive genetic algorithm [J]. Journal of Mechanical Engineering, 2010, 46(16): 136-141

[4]

PengP, YangQuan. Generalized shape and gauge decoupling load distribution optimization based on IGA for tandem cold mill [J]. Journal of Iron and Steel Research International, 2009, 16(2): 30-34

[5]

YangJ-m, ZhangQ, CheH-j, HanX-yan. Multi-objective optimization for tandem cold rolling schedule [J]. Journal of Iron and Steel Research International, 2010, 17(11): 34-39

[6]

WangD D, TieuA K, De BoerF G. Toward a heuristic optimum design of rolling schedules for tandem cold rolling mills [J]. Engineering Applications of Artificial Intelligence, 2000, 13(4): 397-406

[7]

LiuX-xing. Fuzzy multi-object optimization design of rolling schedule on cold continuous rolling mill [J]. Iron and Steel, 2008, 35(8): 34-36

[8]

NelderJ A, MeadR. A simplex method for function minimization [J]. Computer Journal, 1965, 7: 308-313

[9]

BemporadA, BernardiniD, AlessandroF, SpinelliA. Optimization-based automatic flatness control in cold tandem rolling [J]. Journal of Process Control, 2010, 20(4): 396-407

[10]

CaoJ-g, WeiG-c, ZhangJ, ChenX-l, ZhouY-zhong. VCR and ASR technology for profile and flatness control in hot strip mills [J]. Journal of Central South University of Technology, 2008, 15(2): 264-270

[11]

LiXuStudy and application of strategy to improve gauge accuracy for tandem cold mill [D], 2008, Shenyang, Northeastern University

[12]

FerreiraH C, SalesR M, De Ávila PiresC T. Set-up generation system for a tandem cold mill [C]. IEEE Industry Applications Conference Fortieth IAS Annual Meeting, 2005, Hong Kong, China, IEEE Press: 508-514

[13]

BlandD R, FordH. An approximate treatment of the elastic compression of the strip in rolling mills [J]. Journal of the Iron and Steel Institute, 1952, 172: 245-249

[14]

GuoL-w, YangQuan. Optimization method for load distribution of tandem cold rolling [J]. Journal of Iron and Steel Research, 2007, 19(12): 31-34

[15]

LiuS-j, WuB-cheng. Optimum design of rolling schedule for tandem cold mill using SLPSO [J]. Applied Mechanics and Materials, 2012, 101: 443-446

[16]

AbidoM A. Multi-objective particle swarm optimization of environmental/economic dispatch problem [J]. Electric Power System Research, 2009, 79: 1105-1113

[17]

WaltersF H, ParkerL R, MorganS L, DemingS N. Sequential simplex optimization [M]. Boca Raton: CRC Press, 1991108-115

[18]

GuoR-min. Application of PC and LAN for a level 2 setup model of a single-stand reversing mill [J]. Iron and Steel Engineer, 1997, 74(8): 41-46

AI Summary AI Mindmap
PDF

120

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/