Replenishment policy and inventory optimization for supply-hub with liability period consideration

Guo Li , Kun Huang , Qi Yao , Shi-hua Ma

Journal of Central South University ›› 2013, Vol. 20 ›› Issue (10) : 2914 -2921.

PDF
Journal of Central South University ›› 2013, Vol. 20 ›› Issue (10) : 2914 -2921. DOI: 10.1007/s11771-013-1813-3
Article

Replenishment policy and inventory optimization for supply-hub with liability period consideration

Author information +
History +
PDF

Abstract

A replenishment decision-making model for supply-hub is firstly established from the angle of supplier, and optimal replenishment decision of the supplier is analyzed. Then, inventory optimization model for supply-hub is formulated from the angle of the manufacturer, and the optimization algorithm for obtaining optimal inventory levels is given. The result shows that liability period decides the share of the inventory cost between two sides in supply chain. With the increase of liability period, the service level has been quickly reduced even though the manufacturer’s cost has been cut down by transferring the inventory cost to the supplier. As to the safety inventory, if the lower bound of components safety inventory increases, the supplier’s cost will rise up more slowly than the liability period does, while the service levels increases as the safety inventory’s lower bound is raised.

Keywords

liability period / supply-hub / replenishment policy / inventory optimization / lead time

Cite this article

Download citation ▾
Guo Li, Kun Huang, Qi Yao, Shi-hua Ma. Replenishment policy and inventory optimization for supply-hub with liability period consideration. Journal of Central South University, 2013, 20(10): 2914-2921 DOI:10.1007/s11771-013-1813-3

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

BarnesE, DaiJ, DengS, DownD, GohM, ChuinL H. On the strategy of supply hubs for cost reduction and responsiveness [R]. The Logistics Institute-Asia Pacific Report, Georgia Institute of Technology and National University of Singapore, 2000

[2]

QetinkayaS, LeeC Y. Stock replenishment and shipment scheduling for vendor-manage inventory systems [J]. Management Science, 2000, 46(2): 217-232

[3]

DisneyS M, TowillD R. The effect of vendor managed inventory (VMI) dynamics on bullwhip effect in supply chains [J]. International Journal of Production Economics, 2003, 85(2): 199-215

[4]

SongJ S, YanoC A, LerssrisuriyaP. Contract assembly: Dealing with combined supply lead time and demand quantity uncertainty [J]. Manufacturing & Service Operations Management, 2000287-296

[5]

GulerM G, BilgiT. On coordinating an assembly system under random yield and random demand [J]. European Journal of Operational Research, 2009, 196(1): 342-350

[6]

YanoC A, LeeH L. Lot sizing with random yields: A review [J]. Operations Research, 1995331-334

[7]

GerchakY, WangY, YanoC A. Lot sizing in assembly systems with random component yields [J]. IIE Transactions, 1994, 26(2): 19-24

[8]

TangO, GrubbstromR W. The detailed coordination problem in a two-level assembly system with stochastic leadtimes [J]. International Journal of Production Economics, 2003, 81/82: 415-429

[9]

YanoC A. Stochastic leadtimes in two-level assembly systems [J]. IIE Transactions, 1987, 19(4): 371-378

[10]

GurnaniH, AkellaR, LehoczkyJ. Optimal order policies in assembly systems with random demand and random supplier delivery [J]. IIE Transactions, 1996865-878

[11]

GurnaniH, GerchakY. Coordination in decentralized assembly systems with uncertain component yields [J]. European Journal of Operational Research, 20071559-1576

[12]

KwonH D, LippmanS A, MccardleK, TangC SManaging time-based contracts with delayed payments [D], 2008Los Angles, USAUCLA Anderson School

[13]

IyerA V, BergenM E. Quick response in manufacturer-retailer channels [J]. Management Science, 1997, 43(4): 559-570

[14]

GroutJ R, ChristyD P. A model of incentive contracts for just-in-time delivery [J]. European Journal of Operational Research, 1996139-147

[15]

GUI_RidaA L, NagiR. Cost characterizations of supply chain delivery performance [J]. International Journal of Production Economics, 2006, 102(1): 22-36

[16]

GroutJ R. Influencing a supplier using delivery windows: Its effect on the variance of flow time and on-time delivery [J]. Decision Science, 1998, 29(3): 747-764

[17]

DisneyS M, TowillD R. The effect of vendor managed inventory (VMI) dynamics on the bullwhip effect in supply chains [J]. International Journal of Production Economics, 2003, 85(2): 199-215

[18]

RungtusanathamM, RabinovichE, AshenbaumB, WallinC. Vendor-owned inventory management arrangements in retail: An agency theory perspective [J]. Journal of Business Logistics, 2007, 28(1): 111-135

[19]

LeeC, ChuW. Who should control inventory in a supply chain? [J]. European Journal of Operational Research, 2005, 164(1): 158-172

[20]

DongX, XuK. A supply chain model of vendor managed inventory [J]. Transportation Research Part E: Logistics and Transportation Review, 2002, 38(2): 75-95

[21]

RuJ, WangY Z. Consignment contracting: Who should control inventory in the supply chain? [J]. European Journal of Operational Research, 2010, 201(3): 760-769

AI Summary AI Mindmap
PDF

79

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/