Beam-track interaction of high-speed railway bridge with ballast track

Bin Yan , Gong-lian Dai , Hua-ping Zhang

Journal of Central South University ›› 2012, Vol. 19 ›› Issue (5) : 1447 -1453.

PDF
Journal of Central South University ›› 2012, Vol. 19 ›› Issue (5) : 1447 -1453. DOI: 10.1007/s11771-012-1161-8
Article

Beam-track interaction of high-speed railway bridge with ballast track

Author information +
History +
PDF

Abstract

Based on the construction bridge of Xiamen-Shenzhen high-speed railway (9–32 m simply-supported beam + 6×32 m continuous beam), the pier-beam-track finite element model, where the continuous beam of the ballast track and simply-supported beam are combined with each other, was established. The laws of the track stress, the pier longitudinal stress and the beam-track relative displacement were analyzed. The results show that reducing the longitudinal resistance can effectively reduce the track stress and the pier stress of the continuous beam, and increase the beam-track relative displacement. Increasing the rigid pier stiffness of continuous beam can reduce the track braking stress, increase the pier longitudinal stress and reduce the beam-track relative displacement. Increasing the rigid pier stiffness of simply-supported beam can reduce the track braking stress, the rigid pier longitudinal stress and the beam-track relative displacement.

Keywords

high-speed railway / beam-track interaction / ballast track / rail longitudinal force / continuous beam

Cite this article

Download citation ▾
Bin Yan, Gong-lian Dai, Hua-ping Zhang. Beam-track interaction of high-speed railway bridge with ballast track. Journal of Central South University, 2012, 19(5): 1447-1453 DOI:10.1007/s11771-012-1161-8

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

ZhangY.-z., ZhangMin.. Structure and behavior of floor system of two super high-speed railway Changjiang composite bridges [J]. Journal of Central South University of Technology, 2011, 18(2): 542-549

[2]

Bridge Research Institute of Railway Bridge Authority. German Standard DS899/59. Special procedures on railway Shinkansen bridge [S]. 1991.

[3]

YinC.-x., PanJ.-y., ZhuangJ.-sheng.. On nonlinear static and dynamic analysis and emulation of additional forces in railway bridges [J]. China Railway Science, 2001, 22(5): 133-137

[4]

XuQ.-yuan.Static and dynamic 3D finite element analysis of longitudinal forces transmission between CWR and high-speed railway bridges [D], 2005ChangshaCentral South University

[5]

LiB.-you.Study on longitudinal force of CWR on bridge for speed-raising trunk line steel truss girder [D], 2006ChangshaCentral South University

[6]

JiangPeng.Interaction between girder and rail of rail transit viaduct with U-shape girder [D], 2008ShanghaiTongji University

[7]

China Academy of Railway Sciences. [2003]205. Railway construction, interim provisions of CWR design on newly built railway bridge [M]. Beijing: China Railway Press, 2003. (in Chinese).

[8]

BattiniJ., MahirU.. A simple finite element to consider the non-linear influence of the ballast on vibrations of railway bridges [J]. Engineering Structures, 2011, 33(9): 2597-2602

[9]

ReadD., LoprestiJ.. Management of rail neutral temperature and longitudinal rail forces [J]. Railway Track and Structures, 2005, 101(8): 18-19

[10]

ORE. Braking and acceleration force on bridges-Measurement and evaluation methods [R]. 1970.

[11]

BuY.-zhi.Research on the transmission mechanism of longitudinal force for high-speed railway bridges [D], 1998ChengduSouthwest Jiaotong University

[12]

BiondiaB., MuscolinobG., SofibA.. A substructure approach for the dynamic analysis of train-track-bridge system [J]. Computers & Structures, 2005, 83(11): 2271-2281

[13]

TB10002.1-2005. Fundamental code for design on railway bridge and culvert [S]. Beijing: China Railway Press, 2005. (in Chinese)

[14]

LiL.-ying.Discussion of live load design standards on high-speed railway small and medium span bridge [D], 2011ChangshaCentral South University

[15]

Code for railway CWR design (draft) [S]. Beijing: Institute of Economic Planning Ministry of Railways, 2008. (in Chinese)

[16]

YanB., DaiG.-lian.. CWR longitudinal force of cable-stayed bridge on high-speed railway [J]. Journal of the China Railway Society, 2012, 34(3): 83-87

AI Summary AI Mindmap
PDF

91

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/