Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints
Bing-hai Zhou , Xin Li
Journal of Central South University ›› 2012, Vol. 19 ›› Issue (1) : 187 -192.
Try and error-based scheduling algorithm for cluster tools of wafer fabrications with residency time constraints
To improve the productivity of cluster tools in semiconductor fabrications, on the basis of stating scheduling problems, a try and error-based scheduling algorithm was proposed with residency time constraints and an objective of minimizing Makespan for the wafer jobs in cluster tools. Firstly, mathematical formulations of scheduling problems were presented by using assumptions and definitions of a scheduling domain. Resource conflicts were analyzed in the built scheduling model, and policies to solve resource conflicts were built. A scheduling algorithm was developed. Finally, the performances of the proposed algorithm were evaluated and compared with those of other methods by simulations. Experiment results indicate that the proposed algorithm is effective and practical in solving the scheduling problem of the cluster tools.
cluster tools / residency constraints / scheduling model / algorithm / simulation experiments
| [1] |
|
| [2] |
|
| [3] |
|
| [4] |
LEE T E. A review of scheduling theory and methods for semiconductor manufacturing cluster tools [C]// Proceedings of 2008 Winter Simulation Conference. Austin, America, 2008: 2127–2135. |
| [5] |
WU Nai-qi, CHU Cheng-bin, CHU Feng, ZHOU Meng-chu. Modeling and schedulability analysis of single-arm cluster tools with wafer residency time constraints using petri net [C]// Proceedings of 2008 IEEE International Conference on Networking, Sensing and Control. Sanya, China, 2008: 84–89. |
| [6] |
|
| [7] |
MORRISON J R. Regular flow line models for semiconductor cluster tools: A case of lot dependent process times [C]// Proceedings of the 5th Annual IEEE Conference on Automation Science and Engineering. Bangalore, India, 2009: 465–470. |
| [8] |
|
| [9] |
|
| [10] |
|
| [11] |
LEE J H, LEE T E. An open scheduling architecture for cluster tools [C]// Proceedings of the 6th Annual IEEE Conference on Automation Science and Engineering. Toronto, Canada, 2010: 420–425. |
| [12] |
|
| [13] |
|
| [14] |
|
| [15] |
TZENG J, LIU T, CHOU J. Applications of multi-objective evolutionary algorithms to cluster tool scheduling [C]// Proceedings of the First International Conference on Innovative Computing, Information and Control. Beijing, China, 2006: 531–534. |
| [16] |
|
/
| 〈 |
|
〉 |