Effect of concrete creep on pre-camber of continuous rigid-frame bridge

Guo-jing He , Yuan-yuan Li , Zhong-quan Zou , Liang-liang Duan

Journal of Central South University ›› 2010, Vol. 15 ›› Issue (Suppl 1) : 337 -341.

PDF
Journal of Central South University ›› 2010, Vol. 15 ›› Issue (Suppl 1) : 337 -341. DOI: 10.1007/s11771-008-0376-1
Article

Effect of concrete creep on pre-camber of continuous rigid-frame bridge

Author information +
History +
PDF

Abstract

The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated. The difference of creep coefficients calculated with two Chinese codes was discussed. Based on the calculations, the pre-camber of a pre-stressed concrete continuous rigid-frame box bridge was computed for construction control purpose. The results show that the short-term creep coefficient and long-term creep coefficient calculated with the CC-1985 are larger than those calculated with the CC-2004, while the medium-term creep coefficient calculated with the CC-1985 is smaller than that calculated with the CC-2004. The difference of creep deformation calculated with these two codes is small, and the influences of concrete creep on the pre-camber for most of the segments are negligible. The deflections and stresses of the box girder measured during the construction stages agree very well with the predictions.

Keywords

creep / pre-stressed concrete / continuous rigid-frame bridge / cantilever casting method / pre-camber

Cite this article

Download citation ▾
Guo-jing He, Yuan-yuan Li, Zhong-quan Zou, Liang-liang Duan. Effect of concrete creep on pre-camber of continuous rigid-frame bridge. Journal of Central South University, 2010, 15(Suppl 1): 337-341 DOI:10.1007/s11771-008-0376-1

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

YangF.-l., WangG.-hui.. The study of creep deformation during the construction of long-span concrete bridge without bracket [J]. Journal of Lanzhou Jiaotong University, 2003, 32(3): 145-149

[2]

MaB.-ling.The high-rise pier and long span continuous rigid frame bridge [M], 2001, Beijing, China Communication Press

[3]

JTG 023-1985, Code for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts. [S].

[4]

JTG D62-2004, Code for Design of Highway Reinforced Concrete and Prestressed, Concrete Bridges and Culverts. [S].

[5]

HuiR.-y., HuangG.-x., YiB.-ruo.The creep of concrete [M], 1988, Beijing, China Railway Publishing House

[6]

ZhouL., ChenY.-chun.Creep and shrinkage [M], 1994, Beijing, China Railway Publishing House

[7]

BazantZ. P., PanulaL.. Creep and shrinkage characterization for analyzing prestressed concrete structures [J]. PCI Journal, 1980, 25(3): 86-122

[8]

WangJ.-w., LiJ.-z., SuM.-biao.. Internal forces redistribution and stresses redistribution analysis of continuous and prestressed concrete girder bridges [J]. Journal of Shijiazhuang Railway Institute, 1999, 12(1): 1-6