Pump-lockage ore transportation system for deep sea flexible mining system
Hai-liang Xu , Ping-wei Yin , Shao-jun Xu , Fang-qiong Yang
Journal of Central South University ›› 2008, Vol. 15 ›› Issue (4) : 540 -544.
Pump-lockage ore transportation system for deep sea flexible mining system
Based on characteristics of deep sea flexible mining system, a new pump-lockage ore transportation system was designed. According to Bernoulli equation and two-phase hydrodynamics theory, parameters of the new system were obtained and four ore transportation systems were analyzed. The results indicate that the pump head of 1 000 m mining system is 100–150 m and that of 5 000 m mining system is 660–750 m. In addition, based on similarity theory, a model of the new transportation system was made, which can simulate more than 5 000 m actual ore transportation system. So both theory and experiment prove that the new pump-lockage ore transportation system is an ideal design for deep sea flexible mining system.
flexible mining system / ore transportation system / pump-lockage
| [1] |
CHUNG J S, CHENG B. Application of thrusts to elastic joints on long vertical pipe in 3-D nonlinear motions (Part II): Numerical examples by MSE and FEM results [C]// Proc 8th Int Offshore and Polar Eng Conf. Montactual: ISOPE, 1998: 189–198. |
| [2] |
CHUNG J S, CHENG B. 3-D responses of vertical pipe bottom pin-joined to a horizontal pipe to ship motion and thrust on pipe (Part I): MSE and FEM modeling [C]// Proc 9th Int Offshore and Polar Eng Conf. Brest: ISOPE, 1999: 265–271. |
| [3] |
|
| [4] |
|
| [5] |
|
| [6] |
|
| [7] |
|
| [8] |
|
| [9] |
|
| [10] |
|
| [11] |
|
| [12] |
ENGLMANN H E. Vertical hydraulic transportation of large-size—A contribution to marine mining. OCT 3137 [C]// The 10th Annual Offshore Technology Conference. Louisiana: 1978: 216–219. |
| [13] |
|
| [14] |
|
| [15] |
XU Hai-liang, HE Qing-hua. Deep sea mining ore expulsion system: China, 20004200360 74.2 [P]. 2004. (in Chinese) |
| [16] |
|
| [17] |
|
/
| 〈 |
|
〉 |