In order to construct the data mining frame for the generic project risk research, the basic definitions of the generic project risk element were given, and then a new model of the generic project risk element was presented with the definitions. From the model, data mining method was used to acquire the risk transmission matrix from the historical databases analysis. The quantitative calculation problem among the generic project risk elements was solved. This method deals with well the risk element transmission problems with limited states. And in order to get the limited states, fuzzy theory was used to discrete the historical data in historical databases. In an example, the controlling risk degree is chosen as P(Rs⩾2) ⩽0.1, it means that the probability of risk state which is not less than 2 in project is not more than 0.1, the risk element R3 is chosen to control the project, respectively. The result shows that three risk element transmission matrix can be acquired in 4 risk elements, and the frequency histogram and cumulative frequency histogram of each risk element are also given.
Keywords
data mining
/
risk element
/
risk management
/
project management
Cite this article
Download citation ▾
Cun-bin Li, Jian-jun Wang.
Model of generic project risk element transmission theory based on data mining.
Journal of Central South University, 2008, 15(1): 132-135 DOI:10.1007/s11771-008-0026-7
| [1] |
WangH.-c., TaoL.-y., ZhangY.-fu.. Research and management on project risk[J]. Chinese Journal of Management Science, 1998, 6(4): 15-21(in Chinese)
|
| [2] |
PerryJ. G.. Risk management—An approach for project managers[J]. International Journal of Project Management, 1987, 4(4): 211-126
|
| [3] |
KrauplS., WieckertC.. Economic evaluation of the solar carbothermic reduction of ZnO by using a single sensitivity analysis and a Monte-Carlo risk analysis[J]. Energy, 2007, 32(7): 1134-1147
|
| [4] |
AuS. K., WangZ. H., LoS. M.. Compartment fire risk analysis by advanced Monte Carlo simulation[J]. Engineering Structures, 2007, 29(9): 2381-2390
|
| [5] |
ChanF. T. S., KumarN.. Global supplier development considering risk factors using fuzzy extended AHP-based approach[J]. Omega, International Journal of Management Science, 2007, 35(4): 417-431
|
| [6] |
LI C B, WANG J J. The research of hierarchical risk element transmission theory based on fuzzy extended AHP[C]// International Conference on Management. Shanghai: 2007, 129–133.
|
| [7] |
ChangD. Y.. Applications of the extent analysis method on fuzzy AHP[J]. European Journal of Operational Research, 1996, 95(3): 649-655
|
| [8] |
HenryE. J., LuY.-z.Reliability engineering and risk analysis[M], 1988, Beijing, Atomic Energy Press
|
| [9] |
WuC.. Fault tree analysis of spontaneous combustion of sulphide ores and its risk assessment[J]. Journal of Central South University of Technology, 1995, 2(2): 77-80
|
| [10] |
XuZ.-s., SunZ.-dong.. Priority method for a kind of multi-attribute decision-making problems[J]. Journal of Management Sciences in China, 2002, 5(3): 35-39(in Chinese)
|
| [11] |
LiC.-b., QuB., WangK.-cheng.. The research on three-dimensional structure model of Generalized project risk element transmission[C]. Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, 2006, Beijing, Chinese Research Institute of Construction Management: 285-290
|
| [12] |
MaT. T., LiC. B.. The applications of risk analysis in the comprehensive evaluation of construction projects[C]. Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, 2006, Beijing, Chinese Research Institute of Construction Management: 448-453
|
| [13] |
GlobersonS.. Impact of Various Work-breakdown Structures on Project Conceptualization[J]. International Journal of Project Management, 1994, 12(3): 165-171
|
| [14] |
Project Management Institute Standards Committee.A guild to the project management body of knowledge[M], 2000, New York, Project Management Institute Press
|
| [15] |
ChenX.-h., LaiB.-c., LuoDing.. Mining association rule efficiently based on data warehouse[J]. Journal of Central South University of Technology, 2003, 10(4): 375-380
|
| [16] |
BelacelN.. Multicriteria assignment method PROAFTN: methodology and medical applications[J]. European Journal of Operational Research, 2000, 1(16): 175-183
|
| [17] |
BelacelN., RavalH. B., PunnenA. P.. Learning multicriteria fuzzy classification method PROAFTN from data[J]. Computers and Operations Research, 2007, 34(7): 1885-1898
|