Investigation and characterization of mining subsidence in Kaiyang Phosphorus Mine
Jian Deng , Li Bian
Journal of Central South University ›› 2007, Vol. 14 ›› Issue (3) : 413 -417.
Investigation and characterization of mining subsidence in Kaiyang Phosphorus Mine
In Kaiyang Phosphorus Mine, serious environmental and safety problems are caused by large scale mining activities in the past 40 years. These problems include mining subsidence, low recovery ratio, too much dead ore in pillars, and pollution of phosphorus gypsum. Mining subsidence falls into four categories: curved ground and mesa, ground cracks and collapse hole, spalling and eboulement, slope slide and creeping. Measures to treat the mining subsidence were put forward: finding out and managing abandoned stopes, optimizing mining method (cut and fill mining method), selecting proper backfilling materials (phosphogypsum mixtures), avoiding disorder mining operation, and treating highway slopes. These investigations and engineering treatment methods are believed to be able to contribute to the safety extraction of ore and sustainable development in Kaiyang Phosphorus Mine.
mining subsidence / ground cracking / safety, Kaiyang Phosphorus Mine / cut and fill mining method
| [1] |
’Mining Handbook’ Editing Committee.Mining Handbook[M], 1999, Beijing, Metallurgical Industry Press |
| [2] |
|
| [3] |
|
| [4] |
|
| [5] |
|
| [6] |
|
| [7] |
|
| [8] |
|
| [9] |
Central South University, Kaiyang Phosphorus Mine. Report on mining method under highway in Yongshaba Phosphorus Mine[R]. 2004. (in Chinese) |
| [10] |
Central South University, Kaiyang Phosphorus Mine. Report on general mining techniques under highway in Kaiyang Phosphorus Mine[R]. 2004. (in Chinese) |
| [11] |
|
| [12] |
|
| [13] |
|
| [14] |
|
| [15] |
LIU Bao-chen. Ground surface movement due to underground excavation in P. R. China[C]// HUDSON J A. Comprehensive Rock Engineering. Pergamon Press, 1993: 781–817. |
/
| 〈 |
|
〉 |