Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network

Zhi-min Lü , Tian-ru Jiang , Zai-wei Li

International Journal of Minerals, Metallurgy, and Materials ›› 2021, Vol. 28 ›› Issue (8) : 1343 -1352.

PDF
International Journal of Minerals, Metallurgy, and Materials ›› 2021, Vol. 28 ›› Issue (8) : 1343 -1352. DOI: 10.1007/s12613-021-2310-6
Article

Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network

Author information +
History +
PDF

Abstract

This research attempts to devise a multistage and multiproduct short-term integrative production plan that can dynamically change based on the order priority and virtual occupancy for application in steel plants. Considering factors such as the delivery time, varietal compatibility between different products, production capacity of variety per hour, minimum or maximum batch size, and transfer time, we propose an available production capacity network with varietal compatibility and virtual occupancy for enhancing production plan implementation and quick adjustment in the case of dynamic production changes. Here available means the remaining production capacity after virtual occupancy. To quickly build an available production capacity network and increase the speed of algorithm solving, constraint selection and cutting methods with order priority were used for model solving. Finally, the genetic algorithm improved with local search was used to optimize the proposed production plan and significantly reduce the order delay rate. The validity of the proposed model and algorithm was numerically verified by simulating actual production practices. The simulation results demonstrate that the model and improved algorithm result in an effective production plan.

Keywords

short-term integrated plan / constraint satisfaction model / available production capacity / varietal compatibility / virtual capacity occupancy

Cite this article

Download citation ▾
Zhi-min Lü, Tian-ru Jiang, Zai-wei Li. Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network. International Journal of Minerals, Metallurgy, and Materials, 2021, 28(8): 1343-1352 DOI:10.1007/s12613-021-2310-6

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Zheng Z, Huang SP, Long JY, Gao XQ. Synergetic method between materials flow and energy flow in iron and steel intelligent manufacturing. Chin. J. Eng., 2017, 39(1): 115

[2]

Kusiak A. Smart manufacturing. Int. J. Prod. Res., 2018, 56(1–2): 508.

[3]

Y.N. Qi, Z.G. Mao, M. Zhang, and H.F. Guo, Manufacturing practices and servitization: The role of mass customization and product innovation capabilities, Int. J. Prod. Econ., 228(2020), art. No. 107747.

[4]

Long JY, Zheng Z, Gao XQ. Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown. Int. J. Prod. Res., 2017, 55(11): 3197.

[5]

Xu ZJ, Zheng Z, Gao XQ. Operation optimization of the steel manufacturing process: A brief review. Int. J. Miner. Metall. Mater., 2021, 28(8): 1274

[6]

Yin RY. Yin RY. Case study. Theory and Methods of Metallurgical Process Integration, 2016, London, Academic Press, 179.

[7]

Zhang B, Wang GS, Yang Y, Zhang S. Solving the order planning problem at the steelmaking shops by considering logistics balance on the plant-wide process. IEEE Access, 2019, 7, 139938.

[8]

Lin JH, Liu M, Hao JH, Gu P. Many-objective harmony search for integrated order planning in steelmaking-continuous casting-hot rolling production of multi-plants. Int. J. Prod. Res., 2017, 55(14): 4003.

[9]

S. Lu, H.Y. Su, C. Johnsson, H.S. Shao, and L. Xie, A chance constrained programming approach for multi-product multistage integrated production planning under internal and external uncertainties, [in] 2015 IEEE International Conference on Automation Science and Engineering (CASE), Gothenburg, 2015, p. 880.

[10]

Witt A, Voss S. Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software. Eur. J. Ind. Eng., 2011, 5(1): 81.

[11]

Altendorfer K, Minner S. Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates. Eur. J. Oper. Res., 2011, 213(1): 134.

[12]

Lin JH, Liu M, Hao JH, Jiang SL. A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry. Comput. Oper. Res., 2016, 72, 189.

[13]

S. Wang, Y.R. Shi, and S.X. Liu, Integrated scheduling for steelmaking continuous casting—hot rolling processes considering hot chain logistics, Math. Probl. Eng., 2020(2020), art. No. 6902934.

[14]

Yuan SP, Li TK, Wang BL. Improved fast elitist non-dominated sorting genetic algorithm for multi-objective steelmaking-continuous casting production scheduling. Comput. Integr. Manuf. Syst., 2019, 25(1): 115

[15]

Xu WJ, Tang LX, Pistikopoulos EN. Modeling and solution for steelmaking scheduling with batching decisions and energy constraints. Comput. Chem. Eng., 2018, 116, 368.

[16]

Lv ZM, Du JZ. Dou RL. Order acceptance and capacity balance for steel plant based on production capacity network flow. Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012), 2013, Berlin, Heidelberg, Springer, 97

[17]

Ball MO, Chen CY, Zhao ZY. Simchi-Levi D, Wu SD, Shen ZJ. Available to promise. Handbook of Quantitative Supply Chain Analysis, 2004, Boston, MA, Springer, 447.

[18]

Liu Q, Liu Q, Yang JP, Zhang JS, Gao S, Li QD, Wang B, Wang BL, Li TK. Progress of research on steelmaking-continuous casting production scheduling. Chin. J. Eng., 2020, 42(2): 144

[19]

Spearman ML, Zazanis MA. Push and pull production systems: Issues and comparisons. Oper. Res., 1992, 40(3): 521.

[20]

Wang WB, Qin HL. Parallel test using natural coding genetic algorithm. Syst. Eng. Electron., 2010, 32(6): 1343

[21]

Ruttkay Z. Constraint satisfaction-A survey. CWI Q., 1998, 11(2–3): 123

[22]

Isoherranen V, Kess P. Production planning optimisation and challenges in steel production: SSAB process review. Int. J. Modell. Oper. Manage., 2016, 6(1–2): 19

AI Summary AI Mindmap
PDF

139

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/