Comparative stability analyses of traditional and selective room-and-pillar mining techniques for sub-horizontal tungsten veins

Vidal Félix Navarro Torres , Carlos Dinis da Gama , Matilde Costa e Silva , Paula Falcão Neves , Qiang Xie

International Journal of Minerals, Metallurgy, and Materials ›› 2011, Vol. 18 ›› Issue (1) : 1 -8.

PDF
International Journal of Minerals, Metallurgy, and Materials ›› 2011, Vol. 18 ›› Issue (1) : 1 -8. DOI: 10.1007/s12613-011-0392-2
Article

Comparative stability analyses of traditional and selective room-and-pillar mining techniques for sub-horizontal tungsten veins

Author information +
History +
PDF

Abstract

The stability and productivity concerning a modification on the traditional room and pillar for a new selective technique at the Portuguese Panasqueira Mine have been described. The traditional room-and-pillar stoping uses 5.0-m wide rooms with 3.0 m ×3.0 m pillars, while the selective room-and-pillar mining technique consists in stoping with rooms of 4.0 m wide and pillars of 4 m ×4 m with a subsequent selective cutting of the quartz veins at the mid pillar of approximately 0.5 m high, to obtain a pillar section with an area of 3.0 m × 3.0 m. The stability and productivity analyses indicate that the selective technique obtains smaller average pillar safety factor, more rock mass displacement, more extraction and selectivity ratios, and ore grade improvement, compared with the traditional technique. These results show that the selective technique is also more convenient. This proposed selective room-and-pillar mining technique is applicable to any sub-horizontal narrow quartz veins with wolfram, gold, etc. such as the famous La Rinconada gold mine in the Peruvian Andes.

Keywords

mines and mining / tungsten deposits / productivity / stability / stoping

Cite this article

Download citation ▾
Vidal Félix Navarro Torres, Carlos Dinis da Gama, Matilde Costa e Silva, Paula Falcão Neves, Qiang Xie. Comparative stability analyses of traditional and selective room-and-pillar mining techniques for sub-horizontal tungsten veins. International Journal of Minerals, Metallurgy, and Materials, 2011, 18(1): 1-8 DOI:10.1007/s12613-011-0392-2

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Navarro Torres V.F., Dinis da Gama C. Underground Environment Engineering and Applications, 2005 Brazil, Rio de Janeiro, 550.

[2]

G.J Hasenfus and D.W.H. Su, Horizontal stress and coal mines: twenty five years of experience and perspective, [in] Proceeding of the 25th International Conference on Ground Control in Mining, Morgantown, 2006, p.256.

[3]

B.F. McGunegle and A. Adu-Acheampong, Stability assessment of an underground limestone mine: a case study, [in] Proceeding of the 40th U.S. Rock Mechanics Symposium, Anchorage, 2005, p.872.

[4]

Peila D., Guardini C., Pelizza S. Geomechanical design of a room and pillar granite mine. J. Univ. Sci. Technol. Beijing, 2008, 15, 97.

[5]

G. Kuhnhein and R. Ramer, The influence of horizontal stress on pillar design and mine layout at two underground limestone mines, [in] Proceeding of the 23rd International Conference on Ground Control in Mining, Morgantown, 2004, p.311.

[6]

T. Hoch, G. Karabin, and J. Kramer, Simple Technique for Predicting the Stress Distribution in a Mine Panel [Technical Report], Mine Safety and Health Administration, 1991, p.69.

[7]

M. Costa e Silva, Improvement of post-pillars behaviour providing its confinement by tailings backfill, [in] A.A. Balkema eds. Mechanics of Jointed and Faulted Rock, Netherlands, 1998, p.479.

[8]

USGS-United States Geological Survey, Minerals Resources Program. Tungsten: World Concentrate Production, by Country, http://minerals.usgs.gov/minerals/pubs/commodity/tungsten/stat/tbl4.txt, Table 4.

[9]

F. Mello Mendes, Mechanical Behaviour of Schist Rocks in Panasqueira Mine [Dissertation], IST Technical University of Lisbon, 1960, p.239.

[10]

Dinis Da Gama C. Geomechanical Monitoring of Panasqueira Mine Exploitation, 2005 Lisbon, Hidromineira Geomechanical and Mining Consultants, Ltd., 27.

[11]

Prakash R.S. Hudson J.A. Design of coal pillar arrays and chain pillars. Comprehensive Rock Engineering: Principles, Practice & Projects, 1993 Oxford, Pergamon Press, 631.

[12]

Y. Xianbin and C. Dinis da Gama, Stability analyses of underground room and pillar stopes by means of convergence, [in] The 8th Geotechnical National Congress, Lisbon, 2002, p.10.

[13]

Tesarik D.R., Seymour J.B., Yanske T.R. Long-term stability of a backfilled room-and-pillar test section at the Buick Mine, Missouri, USA. Int. J. Rock Mech. Min. Sci., 2009, 46, 1182.

[14]

Bogert H., Jung S.J., Lim H.W. Room-and-pillar stope design in highly fractured area. Int. J. Rock Mech. Min. Sci. Geomech. Abstr., 1997, 34, 674.

[15]

V.F. Navarro Torres, Environmental Engineering and Application in Portuguese and Peruvian Mines [Dissertation], IST Technical University of Lisbon, 2003, p.620.

AI Summary AI Mindmap
PDF

144

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/