Hierarchical decomposition based optimization method for production and inventory planning in steel galvanizing operations

Yuming Zhao , Yang Yang , Lijie Su , Gongshu Wang , Lixin Tang

International Journal of Minerals, Metallurgy and Materials ›› 2026, Vol. 33 ›› Issue (10) : 3448 -3461.

PDF
International Journal of Minerals, Metallurgy and Materials ›› 2026, Vol. 33 ›› Issue (10) :3448 -3461. DOI: 10.1007/s12613-026-3506-6
Research Article
research-article
Hierarchical decomposition based optimization method for production and inventory planning in steel galvanizing operations
Author information +
History +
PDF

Abstract

Galvanizing operations in steel manufacturing face significant challenges in balancing setup and inventory costs while maintaining customer satisfaction. Frequent zinc bath changes not only cause production downtime but also disrupt process continuity due to repeated thermal rebalancing. In addition, destination-specific storage locations impose release capacity limits that restrict dispatch quantities in each period, thereby tightly coupling production planning, inventory allocation, and order fulfillment decisions across multiple periods. The intricate interactions among setup continuity, time-window constraints, and storage-release limitations create a structurally interdependent planning environment, rendering fragmented decision-making ineffective. These structural complexities underscore the necessity of integrated and intelligent planning methodologies within modern smart manufacturing systems. To address these challenges, this study proposes an intelligent planning framework grounded in mathematical modeling and optimization algorithm. A mixed-integer programming (MIP) model is developed to comprehensively capture setup carryover, order-specific time windows, multi-period capacity constraints, and storage-release restrictions, while explicitly representing the trade-offs among setup switching, inventory holding, and unmet-demand penalties. To overcome the computational difficulty of directly solving large-scale MIP instances, a hierarchical decomposition-based matheuristic is introduced. The method exploits the underlying problem structure by performing family-level aggregation for dimensionality reduction, coordinating inter-period carryover decisions within a hierarchical optimization stage, and restoring feasibility through order-level re-optimization. This abstraction–refinement mechanism significantly reduces computational complexity while preserving global coordination. Computational experiments based on real industrial data demonstrate that the proposed approach consistently achieves higher solution quality and shorter solution times than both baselines and planning practices, confirming its effectiveness as a practical decision-support tool for intelligent production planning in continuous galvanizing line operations.

Keywords

continuous galvanizing / production and inventory planning / mixed integer programming / hierarchical decomposition / optimization

Cite this article

Download citation ▾
Yuming Zhao, Yang Yang, Lijie Su, Gongshu Wang, Lixin Tang. Hierarchical decomposition based optimization method for production and inventory planning in steel galvanizing operations. International Journal of Minerals, Metallurgy and Materials, 2026, 33 (10) : 3448-3461 DOI:10.1007/s12613-026-3506-6

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Tang LX, Meng Y. Data analytics and optimization for smart industry. Front. Eng. Manag., 2021, 8(2):157

[2]

Abdurakipov SS, Butakov EB. Study of dross formation in hot dip galvanizing line using machine learning. Optoelectron. Instrument. Data. Proc., 2025, 61(2):193

[3]

Lv ZM, Jiang TR, Li ZW. Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network. Int. J. Miner. Metall. Mater., 2021, 28(8):1343

[4]

G.W. Dallin, Continuous Hot-Dip Galvanizing–Process and Products, GalviNFO Center, [2026-09-22]. https://www.galv-info.com/wp-content/uploads/sites/8/2022/01/Galvanizing-2022.pdf.

[5]

Xu ZJ, Zheng Z, Gao XQ. Operation optimization of the steel manufacturing process: A brief review. Int. J. Miner. Metall. Mater., 2021, 28(8):1274

[6]

Yang JP, Liu Q, Guo WD, Zhang JG. Quantitative evaluation of multi-process collaborative operation in steelmaking-continuous casting sections. Int. J. Miner. Metall. Mater., 2021, 28(8):1353

[7]

Wang YZ, Zheng Z, Guo L, et al. Advancements in production planning and scheduling within steel manufacturing: A review and its intelligent development. Int. J. Miner. Metall. Mater., 2025, 32(10):2322

[8]

Valls Verdejo V, Alarcó MAP, Sorlí MPL. Scheduling in a continuous galvanizing line. Comput. Oper. Res., 2009, 36(1):280

[9]

Tang LX, Gao C. A modelling and tabu search heuristic for a continuous galvanizing line scheduling problem. ISIJ Int., 2009, 49(3):375

[10]

Fernandez S, Alvarez S, Díaz D, Iglesias M, Ena B, et al. Dorigo M, Birattari M, Garnier S, et al. Scheduling a galvanizing line by ant colony optimization. Swarm Intelligence., 2014, Cham: Springer Cham146

[11]

Gao C, Qu DG. A modelling and a new hybrid MILP/CP decomposition method for parallel continuous galvanizing line scheduling problem. ISIJ Int., 2018, 58(10):1820

[12]

N. Álvarez-Gil, S. Álvarez García, R. Rosillo, and D. de la Fuente, Sequencing jobs with asymmetric costs and transition constraints in a finishing line: A real case study, Comput. Ind. Eng., 165(2022), art. No. 107908.

[13]

S. Álvarez-García, N. Álvarez-Gil, R. Rosillo, and D. de la Fuente, An effective graph-analysis method to schedule a continuous galvanizing line with campaigning boundary constraints, Comput. Ind. Eng., 192(2024), art. No. 110206.

[14]

S. Álvarez-García, N. Álvarez-Gil, and R. Rosillo, Path bridging: A novel local search methodology for optimizing scheduling in highly constrained continuous galvanizing line operations, Expert Syst. Appl., 276(2025), art. No. 127209.

[15]

As’ad R, Demirli K. A bilinear programming model and a modified branch-and-bound algorithm for production planning in steel rolling mills with substitutable demand. Int. J. Prod. Res., 2011, 49(12):3731

[16]

J. Wu, L.J. Su, G.S. Wang, and Y. Yang, Approximated dynamic programming for production and inventory planning problem in cold rolling process of steel production, Mathematics, 12(2024), No. 24, art. No. 3922.

[17]

G.S. Wang, J. Wu, Y. Yang, and L.J. Su, Robust optimization for a steel production planning problem with uncertain demand and product substitution, Comput. Oper. Res., 165(2024), art. No. 106569.

[18]

Liu GL. Lagrangian-based solutions for the multi-level production-inventory problem in iron and steel production with reverse logistics. Eur. J. Ind. Eng., 2025, 19(4):502

[19]

Mattik I, Amorim P, Günther HO. Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: A block planning application. Int. J. Prod. Res., 2014, 52(9):2576

[20]

Saupe J, Fath P, Sayah D, Nickel S. Mixed-integer programming models for mid-term production planning in integrated steel production. Int. J. Prod. Res., 2026, 64(8):3119

[21]

Allahverdi A, Gupta JND, Aldowaisan T. A review of scheduling research involving setup considerations. Omega, 1999, 27(2):219

[22]

Xue GS, Offodile OF, Zhou H, Troutt MD. Integrated production planning with sequence-dependent family setup times. Int. J. Prod. Econ., 2011, 131(2):674

[23]

Bayley T, Süral H, Bookbinder JH. A hybrid Benders approach for coordinated capacitated lot-sizing of multiple product families with set-up times. Int. J. Prod. Res., 2018, 56(3):1326

[24]

Kalay S, Taşkın ZC. Single machine campaign planning under sequence dependent family setups and co-production. J. Oper. Res. Soc., 2021, 72(9):2091

[25]

Pinheiro JCSN, Arroyo JEC. Effective IG heuristics for a single-machine scheduling problem with family setups and resource constraints. Ann. Math. Artif. Intell., 2020, 88(1–3):169

[26]

C.L. Chen, A novel disruptive innovation-like algorithm for single-machine scheduling with sequence-dependent family setup times, Appl. Sci., 11(2021), No. 3, art. No. 986.

[27]

A. Singh, On the intractability of preemptive single-machine job scheduling with release times, deadlines, and family setup times, Inf. Process. Lett., 179(2023), art. No. 106305.

[28]

Jeong S, Kwon C, Kim HJ. Self-supervised job grouping for parallel machine scheduling with family setups. IFAC-PapersOnLine, 2025, 59(10):1017

[29]

Suerie C, Stadtler H. The capacitated lot-sizing problem with linked lot sizes. Manag. Sci., 2003, 49(8):1039

[30]

Quadt D, Kuhn H. Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over. Nav. Res. Logist., 2009, 56(4):366

[31]

Fiorotto DJ, Jans R, de Araujo SA. An analysis of formulations for the capacitated lot sizing problem with setup crossover. Comput. Ind. Eng., 2017, 106338

[32]

Gören H G, Tunali S. Fix-and-optimize heuristics for capacitated lot sizing with setup carryover and backordering. J. Enterpr. Inf. Manag., 2018, 31(6):879

[33]

Mahdieh M, Clark A, Bijari M. A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations. Flex. Serv. Manuf. J., 2018, 30(4):884

[34]

Şafak CU, Yılmaz G, Albey E. A hierarchical approach for solving simultaneous lot sizing and scheduling problem with secondary resources. IFAC-PapersOnLine, 2019, 52(13):1931

[35]

J. Kang, Capacitated lot-sizing problem with sequence-dependent setup, setup carryover and setup crossover, Processes, 8(2020), No. 7, art. No. 785.

[36]

S. Wang, J.Z. Hui, B. Zhu, and Y. Liu, Adaptive genetic algorithm based on fuzzy reasoning for the multilevel capacitated lot-sizing problem with energy consumption in synchronizer production, Sustainability, 14(2022), No. 9, art. No. 5072.

[37]

N.T. Chowdhury, M.F. Baki, and A. Azab, A modeling and hybridized decomposition approach for the multi-level capacitated lot-sizing problem with setup carryover, backlogging, and emission control, Oper. Res. Forum, 5(2024), No. 3, art. No. 68.

[38]

F.T. Muñoz and J. Ulloa-Navarro, A make-to-order capacitated lot-sizing model with parallel machines, eligibility constraints, extra shifts, and backorders, Mathematics, 13(2025), No. 11, art. No. 1798.

[39]

Lee CY, Çetinkaya S, Wagelmans APM. A dynamic lot-sizing model with demand time windows. Manag. Sci., 2001, 47(10):1384

[40]

Jaruphongsa W, Çetinkaya S, Lee CY. Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain. Int. J. Prod. Econ., 2004, 92(2):169

[41]

Wolsey LA. Lot-sizing with production and delivery time windows. Math. Program., 2006, 107(3):471

[42]

Brahimi N, Dauzère-Pérès S, Najid NM. Capacitated multi-item lot-sizing problems with time windows. Oper. Res., 2006, 54(5):951

[43]

Pan TY, Zhang ZH, Cao H. Collaborative production planning with production time windows and order splitting in make-to-order manufacturing. Comput. Ind. Eng., 2014, 671

[44]

Akartunalı K, Miller AJ. A heuristic approach for big bucket multi-level production planning problems. Eur. J. Oper. Res., 2009, 193(2):396

[45]

Helber S, Sahling F. A fix-and-optimize approach for the multi-level capacitated lot sizing problem. Int. J. Prod. Econ., 2010, 123(2):247

Rights & permissions

University of Science and Technology Beijing

PDF

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉