Dynamic squeezing behavior of tamping machine in railway maintenance

Liang Gao , Shunwei Shi , Chang Liu , Yixiong Xiao , Chunyu Wang , Yuze Wang

High-speed Railway ›› 2024, Vol. 2 ›› Issue (4) : 241 -247.

PDF (6429KB)
High-speed Railway ›› 2024, Vol. 2 ›› Issue (4) : 241 -247. DOI: 10.1016/j.hspr.2024.11.001
Research article

Dynamic squeezing behavior of tamping machine in railway maintenance

Author information +
History +
PDF (6429KB)

Abstract

Tamping squeeze is essential for maintaining ballasted tracks. Previous studies have simulated squeezing behavior as a linear motion with a constant squeezing distance, which is unsuitable for various ballast beds in the field. This study aims to develop realistic formulas for squeezing behavior in tamping maintenance. First, a universal expression for the squeezing behavior of tamping operation was proposed through theoretical derivation. Subsequently, a custom testing method for squeezing distance with high accuracy was designed. Finally, the parameters of the universal expression were obtained from testing results using the response surface method and novel formulas for squeezing behavior were innovatively developed. This study can lead to greatly improved simulation accuracy and effective maintenance of tamping squeeze.

Keywords

Ballast bed / Tamping maintenance / Squeezing behavior / Compacting motion / Releasing motion

Cite this article

Download citation ▾
Liang Gao, Shunwei Shi, Chang Liu, Yixiong Xiao, Chunyu Wang, Yuze Wang. Dynamic squeezing behavior of tamping machine in railway maintenance. High-speed Railway, 2024, 2(4): 241-247 DOI:10.1016/j.hspr.2024.11.001

登录浏览全文

4963

注册一个新账户 忘记密码

Declaration of Competing Interest

The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.

Acknowledgements

This work was supported by the Postdoctoral Fellowship Program of China Postdoctoral Science Foundation under Grant Number GZC20240099 and the Fundamental Research Funds for the Central Universities under Grant Number 2024XKRC034 and 2022JBQY009.

References

[1]

X. Bian, W. Cai, Z. Luo, et al., Image-aided analysis of ballast particle movement along a high-speed railway, Engineering 27 (2023) 161-177.

[2]

H. Wang, V. Markine, Dynamic behaviour of the track in transitions zones considering the differential settlement, J. Sound Vib. 459 (2019) 114863.

[3]

Y. Zhang, J. Shi, S. Tan, et al., Optimizing maintenance of vertical curves in high- speed railways, Autom. Constr. 152 (2023) 104947.

[4]

G. Zhao, L. Zhao, Y. Liu, Incompatible thermal deformation of interlayers and corresponding damage mechanism of high-speed railway track structure, High. -Speed Railw. 1 (2023) 37-46.

[5]

X. Cai, W. Liu, L. Gao,et, et al., Mechanical deformation properties of continuous welded rail on kilometer-span suspension bridge for high-speed railway, High. -Speed Railw. 1 (2023) 97-109.

[6]

Y. Guo, V. Markine, G. Jing, Review of ballast track tamping: mechanism, challenges and solutions, Constr. Build. Mater. 300 (2021) 123940.

[7]

L. Gao, S. Shi, Y. Zhong, et al., Real-time evaluation of mechanical qualities of ballast bed in railway tamping maintenance, Int. J. Mech. Sci. 248 (2023) 108192.

[8]

M. Przybyłowicz, M. Sysyn, U. Gerber, et al., Comparison of the effects and efficiency of vertical and side tamping methods for ballasted railway tracks, Constr. Build. Mater. 314 (2022) 125708.

[9]

S. Aingaran, L. Le Pen, A. Zervos, et al., Modelling the effects of trafficking and tamping on scaled railway ballast in triaxial tests, Transp. Geotech. 15 (2018) 84-90.

[10]

M. Sol-Sánchez, F. Moreno-Navarro, M.C. Rubio-Gámez, Analysis of ballast tamping and stone-blowing processes on railway track behaviour: the influence of using USPs, Géotech. 66 (2016) 481-489.

[11]

H. Xiao, Z. Zhang, Y. Zhu, et al., Experimental analysis of ballast bed state in newly constructed railways after tamping and stabilizing operation, Constr. Build. Mater. 362 (2023) 129772.

[12]

J. Liu, P. Wang, G. Liu, et al., Influence of a tamping operation on the vibrational characteristics and resistance-evolution law of a ballast bed, Constr. Build. Mater. 239 (2020) 117879.

[13]

S. Ataei, S. Mohammadzadeh, H. Jadidi, et al., Effects of maintenance operations on railway track’s mechanical behaviour by field load testing, Int. J. Pavement Eng. 15 (2014) 215-227.

[14]

J. Sadeghi, M.E. Motieyan-Najar, J.A. Zakeri, et al., Improvement of railway ballast maintenance approach, incorporating ballast geometry and fouling conditions, J. Appl. Geophys. 151 (2018) 263-273.

[15]

J.J. Kumara, K. Hayano, Deformation characteristics of fresh and fouled ballasts subjected to tamping maintenance, Soils Found. 56 (2016) 652-663.

[16]

W. Koc, A. Wilk, P. Chrostowski, et al.,Tests on lateral resistance in railway tracks during the operation of a tamping machine, Proc. Inst. Mech. Eng. Part F. J. Rail Rapid Transit 225 (2011) 325-340.

[17]

S. Offenbacher, B. Antony, O. Barbir, et al., Evaluating the applicability of multi- sensor equipped tamping machines for ballast condition monitoring, Measurement 172 (2021) 108881.

[18]

G. Saussine, É. Azéma, P.E. Gautier, et al., Numerical modeling of the tamping operation by discrete element approach, : World Congr. Railw. Res. (2008) 1-9.

[19]

D.S. Kim, S.H. Hwang, A. Kono, et al.,Evaluation of ballast compactness during the tamping process by using an image-based 3D discrete element method, Proc. Inst. Mech. Eng. Part F. J. Rail Rapid Transit 232 (2018) 1951-1964.

[20]

H. Xiao, J. Fang, Y. Chi, et al., Discrete element analysis of the effect of manual tamping operation on the mechanical properties of ballast bed, Constr. Build. Mater. 361 (2022) 129557.

[21]

Y. Chi, H. Xiao, Z. Zhang, et al., Analysis of the influence of vibration frequency and amplitude on ballast bed tamping operation in railway turnout areas, Comput. Part. Mech. 11 (2024) 771-788.

[22]

S. Shi, L. Gao, X. Cai, et al., Mechanical characteristics of ballasted track under different tamping depths in railway maintenance, Transp. Geotech. 35 (2022) 100799.

[23]

S. Shi, L. Gao, X. Cai, et al., Effect of tamping operation on mechanical qualities of ballast bed based on DEM-MBD coupling method, Comput. Geotech. 124 (2020) 103574.

[24]

S. Kaewunruen, A.M. Remennikov, Effect of improper ballast packing/tamping on dynamic behaviors of on-track railway concrete sleeper, Int. J. Struct. Stab. Dyn. 7 (2007) 167-177.

[25]

N. Docquier, O. Lantsoght, F. Dubois, et al., Modelling and simulation of coupled multibody systems and granular media using the non-smooth contact dynamics approach, Multibody Syst. Dyn. 49 (2020) 181-202.

[26]

C. Shi, Y. Zhou, L. Xu, et al., A critical review on the vertical stiffness irregularity of railway ballasted track, Constr. Build. Mater. 400 (2023) 132715.

[27]

N. Ferreira, T. Viana, B. Henriques, et al., Application of response surface methodology and box-behnken design for the optimization of mercury removal by Ulva, Sp., J. Hazard. Mater. 445 (2023) 130405.

[28]

M. Alsawalha, An approach utilizing the Response Surface Methodology (RSM) to optimize adsorption-desorption of natural saudi arabian diatomite- with the box- behnken design technique, Arab. J. Chem. 16 (2023) 104413.

[29]

J. Ramachander, S.K. Gugulothu, G.R.K. Sastry, et al., Performance and emission predictions of a CRDI engine powered with diesel fuel: a combined study of injection parameters variation and Box-Behnken response surface methodology based optimization, Fuel 290 (2021) 120069.

[30]

Z. Li, D. Lu, X. Gao, Optimization of mixture proportions by statistical experimental design using response surface method - a review, J. Build. Eng. 36 (2021) 102101.

[31]

Z. Feng, X. Wu, H. Chen, et al., An energy performance contracting parameter optimization method based on the response surface method: a case study of a metro in China, Energy 248 (2022) 123612.

[32]

X. Huang, S. Yao, X. Yang, et al., Melting performance assessments on a triplex-tube thermal energy storage system: optimization based on response surface method with natural convection, Renew. Energy 188 (2022) 890-910.

AI Summary AI Mindmap
PDF (6429KB)

502

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/