RESEARCH ARTICLE

How does the improved DB mode degrade the complex integrity of infrastructure mega-projects? Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China

  • Jinwen ZHANG 1 ,
  • Yumin QIU , 2
Expand
  • 1. School of Management and Engineering, Nanjing University, Nanjing 210093, China; Hong Kong-Zhuhai-Macao Bridge Authority, Zhuhai 519060, China
  • 2. School of Management and Engineering, Nanjing University, Nanjing 210093, China

Received date: 31 Oct 2017

Accepted date: 13 Dec 2017

Published date: 21 Mar 2018

Copyright

2018 The Author(s) 2018. Published by Higher Education Press. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0)

Abstract

Complex integrity is one of the main characteristics of infrastructure mega-projects (IMPs). Cost, technology, risk, duration, environmental impact, and other uncertain complexities are interrelated and constitute a challenging and complex management problem. At present, there is no unified understanding of or solutions to these complex integrity problems. This study analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge (HZMB) project and proposes an improved design-build (DB) mode in which the owner provides a preliminary design and has the right to form and manage consortium. This improved DB mode creatively degrades the special complexities that arise from multiple dimensions. On this basis, it is an efficacious way to grasp the main contradictions, integrate the effective resources, and degrade the complex integrity in multiple dimensions and at multiple levels so as to effectively deal with the complexity management of IMPs.

Cite this article

Jinwen ZHANG, Yumin QIU. How does the improved DB mode degrade the complex integrity of infrastructure mega-projects? Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China[J]. Frontiers of Engineering Management, 2018, 5(1): 40-51. DOI: 10.15302/J-FEM-2018083

Acknowledgments

The authors express their sincere gratitude to Zhaohan Sheng, Shuping Cheng, Feng Xu, and Huimin Liu for their insightful suggestions on previous versions of this manuscript.
1
Albrecht J C, Spang K (2014). Linking the benefits of project management maturity to project complexity. International Journal of Managing Projects in Business, 7(2): 285–301

DOI

2
Baccarini D (1996). The concept of project complexity–A review. International Journal of Project Management, 14(4): 201–204

DOI

3
Bosch-Rekveldt M, Jongkind Y, Mooi H, Bakker H, Verbraeck A (2011). Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework. International Journal of Project Management, 29(6): 728–739

DOI

4
Brady T, Davies A (2014). Managing structural and dynamic complexity: A tale of two projects. Project Management Journal, 45(4): 21–38

DOI

5
Chan H S (2003). The civil service under one country, two systems Public Administration Review, 63(4): 405–417

DOI

6
Chapman R J (2016). A framework for examining the dimensions and characteristics of complexity inherent within rail megaprojects. International Journal of Project Management, 34(6): 937–956

DOI

7
Chen H Q, Su Q K, Zeng S X, Sun D X (2017a). Overcoming the innovation island in mega-infrastructure project. Working Paper

8
Chen H Q, Zeng S X, Lin H, Ma H Y (2017b). Munificence, dynamism, and complexity: How industry context drives corporate sustainability. Business Strategy and the Environment, 26(2): 125–141

DOI

9
Cheng S P, Qiu Y M, Tong J X (2016). Research on Supply Chain Management of Mega-project. Nanjing: Nanjing University Press (in Chinese)

10
Davies A, Mackenzie I (2014). Project complexity and systems integration: constructing the London 2012 Olympics and Paralympics Games. International Journal of Project Management, 32(5): 773–790

DOI

11
Fang C, Marle F (2013). Dealing with project complexity by matrix-based propagation modelling for project risk analysis. Journal of Engineering Design, 24(4): 239–256

DOI

12
Flyvbjerg B (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3): 5-15

13
Flyvbjerg B (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2): 6–19

DOI

14
Flyvbjerg B, Bruzelius N, Rothengatter W (2003). Megaprojects and Risk: An Anatomy of Ambition. Cambridge: Cambridge University Press

15
Geringer J M, Louis H (1989). Control and performance of international joint ventures. Journal of International Business Studies, 20(2): 235–254

DOI

16
Geringer J M, Louis H (1991). Measuring performance of international joint ventures. Journal of International Business Studies, 22(2): 249–263

DOI

17
Girmscheid G, Brockmann C (2008). The inherent complexity of large scale engineering projects. Project Perspectives, (29): 22–26

18
Haynes W (2011). Infrastructure megaproject leadership, management, innovation, and accountability. Public Works Management & Policy, 16(3): 193–198

DOI

19
Hongyun J (2005). Research on technology innovation system based on complexity theory. Studies in Science of Science, 2002 20(4): 437–440

20
Imbeah W, Guikema S (2009). Managing construction projects using the advanced programmatic risk analysis and management model. Journal of Construction Engineering and Management, 135(8): 772–781

DOI

21
Kodeih F, Greenwood R (2014). Responding to institutional complexity: The role of identity. Organization Studies, 35(1): 7–39

DOI

22
Lessard D, Sakhrani V, Miller R (2014). House of project complexity—Understanding complexity in large infrastructure projects. Engineering Project Organization Journal, 4(4): 170–192

DOI

23
Lu Y B, Luo L, Wang H L, Le Y, Shi Q (2015). Measurement model of project complexity for large-scale projects from task and organization perspective. International Journal of Project Management, 33(3): 610–622

DOI

24
Mohr A, Wang C, Fastoso F (2016). The contingent effect of state participation on the dissolution of international joint ventures: A resource dependence approach. Journal of International Business Studies, 47(4): 408–426

DOI

25
Ozorhon B, Arditi D, Dikmen I, Birgonul M T (2007). Effect of host country and project conditions in international construction joint ventures. International Journal of Project Management, 25(8): 799–806

DOI

26
Ozorhon B, Arditi D, Dikmen I, Birgonul M T (2008). Implications of culture in the performance of international construction joint ventures. Journal of Construction Engineering and Management, 134(5): 361–370

DOI

27
Pich M T, Loch C H, De Meyer A (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8): 1008–1023

DOI

28
Pitsis T S, Sankaran S, Gudergan S, Clegg S R (2014). Governing projects under complexity: Theory and practice in project management. International Journal of Project Management, 32(8): 1285–1290

DOI

29
Qiu Y M, Chen H Q, Sheng Z H, Cheng S P (2017). How to govern the conflicting institutional logics in mega-infrastructure project : Evidence from the Hong Kong-Zhuhai-Macao Bridge in China. Working paper

30
Qureshi S M, Kang C W (2015). Analysing the organizational factors of project complexity using structural equation modelling. International Journal of Project Management, 33(1): 165–176

DOI

31
Sheng Z H (2018). Fundamental theories of mega infrastructure Construction Management (Vol. 259). Cham: Springer International Publishing

32
Tsang E W K (2016). How existing organizational practices affect the transfer of practices to international joint ventures. Management International Review, 56(4): 565–595

DOI

33
Vidal L A, Marle F (2008). Understanding project complexity: Implications on project management. Kybernetes, 37(8): 1094–1110

DOI

34
Vidal L A, Marle F, Bocquet J C (2011). Measuring project complexity using the Analytic Hierarchy Process. International Journal of Project Management, 29(6): 718–727

DOI

35
Zeng S X, Ma H Y, Lin H, Chen H Q, Shi J J (2017). The societal governance of megaproject social responsibility. International Journal of Project Management, 35(7): 1–13

36
Zhang J W (2017). The construction management and planning of the main project in the Hong Kong-Zhuhai-Macao Bridge. China Highway, (1): 73–75 (in Chinese)

37
Zhang J W, Sheng Z H (2014). Study on the relationship of the “government” principal-agent in the decision-making of the major projects: Based on the practice of the Hong Kong-Zhuhai-Macao Bridge project. Scientific Decision-Making, (12): 23–34 (in Chinese)

38
Zhang J W, Zhu Y L (2012). Project management planning for construction of Hong Kong-Zhuhai-Macao Bridge (HZMB) main Bridge project. Highway, (3): 143–14 (in Chinese)

39
Zhang J W, Zhu Y L, Gao X L, Liu G (2012). Design-build contracting model development for islands and tunnel engineering of Hong Kong-Zhuhai-Macao Bridge project. Highway, (1): 133–136 (in Chinese)

/