Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha River

Qixiang FAN

PDF(1957 KB)
PDF(1957 KB)
Front. Eng ›› 2017, Vol. 4 ›› Issue (2) : 231-237. DOI: 10.15302/J-FEM-2017103
SUPERENGINEERING
SUPERENGINEERING

Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha River

Author information +
History +

Keywords

super-high arch dam / intelligent construction / mass concrete temperature control / structure behavior control / anti-erosion concrete / low-heat portland cement / large-discharge and high-velocity spillway tunnels / large scale underground powerhouse / green hydropower station / sustainable development / Xiluodu hydropower station

Cite this article

Download citation ▾
Qixiang FAN. Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha River. Front. Eng, 2017, 4(2): 231‒237 https://doi.org/10.15302/J-FEM-2017103

RIGHTS & PERMISSIONS

2017 The Author (s) 2017. Published by Higher Education Press. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0)
AI Summary AI Mindmap
PDF(1957 KB)

Accesses

Citations

Detail

Sections
Recommended

/