Being good or being known: International reputation of high-speed railway enterprises

Yanliang NIU , Siyuan LI , Ruoyu JIN , Xiaopeng DENG

Front. Eng ›› 2023, Vol. 10 ›› Issue (3) : 455 -466.

PDF (668KB)
Front. Eng ›› 2023, Vol. 10 ›› Issue (3) : 455 -466. DOI: 10.1007/s42524-023-0250-8
Construction Engineering and Intelligent Construction
RESEARCH ARTICLE

Being good or being known: International reputation of high-speed railway enterprises

Author information +
History +
PDF (668KB)

Abstract

With fierce competition in the global high-speed railway (HSR) market, international reputation has become essential for enterprises to venture into overseas markets. However, few studies have been performed on the international reputation of HSR enterprises. This study aims to reveal the formation mechanism of HSR enterprises’ international reputation by developing a theoretical framework. The researchers identified five factors and proposed a hypothetical path model based on a comprehensive literature review. After the pilot study, questionnaires were distributed to practitioners in the international HSR industry for data collection. The path model was validated based on partial least-squares structural equation modeling. Eight of the nine paths are statistically supported. Researchers have structured a theoretical framework for the international reputation of HSR enterprises from two perspectives: Being good and being known. Subsequently, a strategic framework was developed to provide targeted promotion strategies for HSR enterprises. The findings of this study contribute to existing international reputation theories using the theoretical model and provide beneficial guidance for HSR enterprises to improve their international reputation through a strategic framework.

Graphical abstract

Keywords

high-speed railway / international reputation / being good / being known / structural equation modeling

Cite this article

Download citation ▾
Yanliang NIU, Siyuan LI, Ruoyu JIN, Xiaopeng DENG. Being good or being known: International reputation of high-speed railway enterprises. Front. Eng, 2023, 10(3): 455-466 DOI:10.1007/s42524-023-0250-8

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Akintoye, A (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18( 1): 77–89

[2]

Awang, Z Wan Afthanorhan, W M A Asri, M A M (2015). Parametric and nonparametric approach in structural equation modeling (SEM): The application of bootstrapping. Modern Applied Science, 9( 9): 58–67

[3]

Azzouz, L Jack, A (2020). Benchmarking the sustainability reporting of high-speed railways (HSRs): Towards a state-of-the-art benchmarking and reporting framework for HSRs. Journal of Cleaner Production, 250( 3): 119505

[4]

Chang, T Deng, X Hwang, B G Zhao, X (2018). Political risk paths in international construction projects: Case study from Chinese construction enterprises. Advances in Civil Engineering, 6939828

[5]

Chang, T Deng, X Hwang, B G Zhao, X (2019). Improving quantitative assessment of political risk in international construction projects: The case of Chinese construction companies. Journal of Construction Engineering and Management, 145( 12): 04019083

[6]

Chen, J Mei, L (2018). Innovation evolution of China’s high-speed rail industry. Frontiers of Engineering Management, 5( 4): 548–552

[7]

Das, T K Teng, B S (2002). Alliance constellations: A social exchange perspective. Academy of Management Review, 27( 3): 445–456

[8]

Deephouse, D L Carter, S M (2005). An examination of differences between organizational legitimacy and organizational reputation. Journal of Management Studies, 42( 2): 329–360

[9]

Deng, X Low, S Zhao, X Chang, T (2018). Identifying micro variables contributing to political risks in international construction projects. Engineering, Construction, and Architectural Management, 25( 3): 317–334

[10]

Dollinger, M J Golden, P A Saxton, T (1997). The effect of reputation on the decision to joint venture. Strategic Management Journal, 18( 2): 127–140

[11]

Doloi, H Iyer, K C Sawhney, A (2011). Structural equation model for assessing impacts of contractor’s performance on project success. International Journal of Project Management, 29( 6): 687–695

[12]

Doni, N (2006). The importance of reputation in awarding public contracts. Annals of Public and Cooperative Economics, 77( 4): 401–429

[13]

Fombrun, C J (2005). Corporate reputations as economic assets. In: Hitt M A, Freeman R E, Harrison J S, eds. The Blackwell Handbook of Strategic Management. Oxford: Wiley-Blackwell, 285–308

[14]

Fombrun, C J Gardberg, N A Sever, J M (2000). The Reputation QuotientSM: A multi-stakeholder measure of corporate reputation. Journal of Brand Management, 7( 4): 241–255

[15]

Fombrun, C J Shanley, M (1990). What’s in a name? Reputation building and corporate strategy. Academy of Management Journal, 33( 2): 233–258

[16]

Fornell, C Bookstein, F L (1982). Two structural equation models: LISREL and PLS applied to consumer exit-voice theory. Journal of Marketing Research, 19( 4): 440–452

[17]

Ghodeswar, B M (2008). Building brand identity in competitive markets: A conceptual model. Journal of Product and Brand Management, 17( 1): 4–12

[18]

Gold, A H Malhotra, A Segars, A H (2001). Knowledge management: An organizational capabilities perspective. Journal of Management Information Systems, 18( 1): 185–214

[19]

HairJ FAndersonR ETathamR LBlackW C (1998). Multivariate Data Analysis with Readings. 5th ed. Englewood Cliffs, NJ: Prentice Hall

[20]

Hair, J F Sarstedt, M Ringle, C M Mena, J A (2012). An assessment of the use of partial least squares structural equation modeling in marketing research. Journal of the Academy of Marketing Science, 40( 3): 414–433

[21]

Hall, R (1992). The strategic analysis of intangible resources. Strategic Management Journal, 13( 2): 135–144

[22]

He, Q Xu, J Wang, T Chan, A P C (2021). Identifying the driving factors of successful megaproject construction management: Findings from three Chinese cases. Frontiers of Engineering Management, 8( 1): 5–16

[23]

Henseler, J Ringle, C M Sarstedt, M (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43( 1): 115–135

[24]

Herbig, P Milewicz, J (1996). To be or not to be … credible that is: A model of reputation and credibility among competing firms. Corporate Communications, 1( 2): 19–29

[25]

Hwang, B G Zhao, X Ong, S Y (2015). Value management in Singaporean building projects: Implementation status, critical success factors, and risk factors. Journal of Management Engineering, 31( 6): 04014094

[26]

Jain, R Winner, L H (2013). Country reputation and performance: The role of public relations and news media. Place Branding and Public Diplomacy, 9( 2): 109–123

[27]

Kang, M Yang, S U (2010). Comparing effects of country reputation and the overall corporate reputations of a country on international consumers product attitudes and purchase intentions. Corporate Reputation Review, 13( 1): 52–62

[28]

Kotha, S Rajgopal, S Rindova, V (2001). Reputation building and performance: An empirical analysis of the top-50 pure Internet firms. European Management Journal, 19( 6): 571–586

[29]

Liao, S H Fei, W C Chen, C C (2007). Knowledge sharing, absorptive capacity, and innovation capability: An empirical study of Taiwan’s knowledge-intensive industries. Journal of Information Science, 33( 3): 340–359

[30]

Lin, Y H Chen, Q Liao, P C Chen, P H Cheng, S (2018). The moderating effect of guanxi on the dynamic capacity and competitive advantage of Chinese international contractors. Advances in Civil Engineering, 3638152

[31]

Liu, B Huo, T Liao, P Yuan, J Sun, J Hu, X (2017a). A special Partial Least Squares (PLS) path decision modeling for bid evaluation of large construction projects. KSCE Journal of Civil Engineering, 21( 3): 579–592

[32]

Liu, J Xie, Q Xia, B Bridge, A J (2017b). Impact of design risk on the performance of design-build projects. Journal of Construction Engineering and Management, 143( 6): 04017010

[33]

Liu, Y Wu, W Gao, P Liu, K (2019). Exploring the different combinations of technological capability and technology management capability in different stages of new product development. IEEE Access, 7( 1): 181012–181021

[34]

Lopes R de, OA Sbragia, R Qualharini, E L (2016). The psychological contract and project management as a core competence of the organization. Procedia: Social and Behavioral Sciences, 226( 14): 148–155

[35]

Lu, W Shen, L Yam, M C (2008). Critical success factors for competitiveness of contractors: China study. Journal of Construction Engineering and Management, 134( 12): 972–982

[36]

Lu, W Zhang, L Bai, F (2016). Bilateral learning model in construction claim negotiations. Engineering, Construction, and Architectural Management, 23( 4): 448–463

[37]

Mahon, J F (2002). Corporate reputation: Research agenda using strategy and stakeholder literature. Business & Society, 41( 4): 415–445

[38]

Melo, T Garrido-Morgado, A (2012). Corporate reputation: A combination of social responsibility and industry. Corporate Social Responsibility and Environmental Management, 19( 1): 11–31

[39]

Mishina, Y Mannor, M J Block, E S (2008). The impact of capability and compatibility on favorable and unfavorable reputations. In: Proceedings of Administrative Science Association of Canada Conference. Halifax, 23–40

[40]

Molenaar, K R Park, J I Washington, S (2009). Framework for measuring corporate safety culture and its impact on construction safety performance. Journal of Construction Engineering and Management, 135( 6): 488–496

[41]

Niu, Y Deng, X Zhao, X Zhang, N (2020). Hexagonal diamond model for international competitive advantages of high-speed railway industry. Journal of Management Engineering, 36( 2): 04020001

[42]

Niu, Y Li, H Ye, K Mahmoudi, A Deng, X (2022). Determinants of coopetition relationships in international joint ventures for high-speed rail projects. KSCE Journal of Civil Engineering, 26( 5): 2036–2057

[43]

Niu, Y Zhao, X Wang, Y Deng, X (2021). Locomotive model for international competitive advantages paths of high-speed railway contractors. Journal of Infrastructure Systems, 27( 2): 04021002

[44]

Orozco, F A Serpell, A F Molenaar, K R Forcael, E (2014). Modeling competitiveness factors and indexes for construction companies: Findings of Chile. Journal of Construction Engineering and Management, 140( 4): B4013002

[45]

Petkova, A P Rindova, V P Gupta, A K (2008). How can new ventures build reputation? An exploratory study. Corporate Reputation Review, 11( 4): 320–334

[46]

Pinto, J K Slevin, D P English, B (2009). Trust in projects: An empirical assessment of owner/contractor relationships. International Journal of Project Management, 27( 6): 638–648

[47]

Porter, M E Kramer, M R (2006). Strategy and society: The link between competitive advantage and corporate social responsibility. Harvard Business Review, 84( 12): 78–92

[48]

Putra, W B T S (2022). Problems, common beliefs and procedures on the use of partial least squares structural equation modeling in business research. South Asian Journal of Social Studies and Economics, 14( 1): 1–20

[49]

Rao, H (1994). The social construction of reputation: Certification contests, legitimation, and the survival of organizations in the American automobile industry, 1895–1912. Strategic Management Journal, 15( S1): 29–44

[50]

Rindova, V P Fombrun, C J (1999). Constructing competitive advantage: The role of firm-constituent interactions. Strategic Management Journal, 20( 8): 691–710

[51]

Rindova, V P Williamson, I O Petkova, A P Sever, J M (2005). Being good or being known: An empirical examination of the dimensions, antecedents, and consequences of organizational reputation. Academy of Management Journal, 48( 6): 1033–1049

[52]

Roberts, P W Dowling, G R (2002). Corporate reputation and sustained superior financial performance. Strategic Management Journal, 23( 12): 1077–1093

[53]

Safa, M Shahi, A Haas, C T Fiander-McCann, D Safa, M Hipel, K MacGillivray, S (2015). Competitive intelligence (CI) for evaluation of construction contractors. Automation in Construction, 59: 149–157

[54]

Schwaiger, M (2004). Components and parameters of corporate reputation: An empirical study. Schmalenbach Business Review, 56( 1): 46–71

[55]

Shamsie, J (2003). The context of dominance: An industry-driven framework for exploiting reputation. Strategic Management Journal, 24( 3): 199–215

[56]

Sillars, D N Kangari, R (2004). Predicting organizational success within a project-based joint venture alliance. Journal of Construction Engineering and Management, 130( 4): 500–508

[57]

Tournois, L (2015). Does the value manufacturers (brands) create translate into enhanced reputation? A multi-sector examination of the value-satisfaction-loyalty-reputation chain. Journal of Retailing and Consumer Services, 26( 1): 83–96

[58]

Tse, D K Pan, Y Au, K Y (1997). How MNCs choose entry modes and form alliances: The China experience. Journal of International Business Studies, 28( 14): 779–805

[59]

Vickerman, R (2018). Can high-speed rail have a transformative effect on the economy?. Transport Policy, 62( 2): 31–37

[60]

Walsh, G Mitchell, V W Jackson, P R Beatty, S E (2009). Examining the antecedents and consequences of corporate reputation: A customer perspective. British Journal of Management, 20( 2): 187–203

[61]

Wang, J (2006). Managing national reputation and international relations in the global era: Public diplomacy revisited. Public Relations Review, 32( 2): 91–96

[62]

Watt, D J Kayis, B Willey, K (2009). Identifying key factors in the evaluation of tenders for projects and services. International Journal of Project Management, 27( 3): 250–260

[63]

Weigelt, K Camerer, C (1988). Reputation and corporate strategy: A review of recent theory and applications. Strategic Management Journal, 9( 5): 443–454

[64]

Williamson, P (1991). Supplier strategy and consumer responsiveness: Managing the links. Business Strategy Review, 2( 2): 75–90

[65]

Wold, H (1975). Soft modelling by latent variables: The non-linear iterative partial least squares (NIPALS) approach. Journal of Applied Probability, 12( S1): 117–142

[66]

Yang, J Yuan, H Zhang, L (2020). Influence factors on general contractor capability in the context of transforming China. Advances in Civil Engineering, 8874579

[67]

YinHYinYWangDJiangHMuZ (2020). How to choose a trusted contractor? Ability, experience, and reputation. In: Construction Research Congress. Tempe, AZ: American Society of Civil Engineers, 1203–1211

[68]

Zeng, N Liu, Y Gong, P Hertogh, M König, M (2021). Do right PLS and do PLS right: A critical review of the application of PLS-SEM in construction management research. Frontiers of Engineering Management, 8( 3): 356–369

[69]

Zhai, Z Shan, M Le, Y (2020). Investigating the impact of governmental governance on megaproject performance: Evidence from China. Technological and Economic Development of Economy, 26( 2): 449–478

[70]

Zhang, N Deng, X Zhao, X Chang, T (2019). Exploring the sources of contractors’ competitive advantage on international HSR construction projects. International Journal of Civil Engineering, 17( 7): 1115–1129

[71]

Zhang, N Hwang, B Deng, X Ning, Y (2020). Achieving transient competitive advantage in high-speed rail projects bidding: Sustainable development perspective. Sustainable Development, 28( 6): 1738–1754

[72]

Zhang, X Shen, L Wu, Y (2011). Green strategy for gaining competitive advantage in housing development: A China study. Journal of Cleaner Production, 19( 2–3): 157–167

[73]

Zhao, X Wu, P Wang, X (2018). Risk paths in BIM adoption: Empirical study of China. Engineering, Construction, and Architectural Management, 25( 9): 1170–1187

[74]

Zhou, Q Deng, X Jin, R Chang, T (2019). Analyzing the key drivers of contractors’ temporary competitive advantage in the competition of international high-speed rail projects. KSCE Journal of Civil Engineering, 23( 11): 4579–4591

RIGHTS & PERMISSIONS

Higher Education Press

AI Summary AI Mindmap
PDF (668KB)

3300

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/